Registered Litigation declared Residential / Group Housing project

The Empire Tower

By Samak Constructions Pvt. Ltd

RG-MH-18608 · RERA P51900077429 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 20 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
149 of 150Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

The Empire Tower is a Residential / Group Housing project by Samak Constructions Pvt. Ltd in Mumbai City, Maharashtra, registered with MahaRERA as P51900077429 on 14 Aug 2024. Possession is promised by 31 Dec 2029. 1 of the 150 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Empire Tower
  • TypeResidential / Group Housing
  • Location
    • M.S. Ali Road
    • Grant Road
    • D-400007
    • Ward ABCD
    • Mumbai City
    • 400007
  • Pincode400007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900077429
  • ReraGenie IDRG-MH-18608

Builder

  • NameSamak Constructions Pvt. Ltd
  • Entity typeCompany
  • GSTIN27AFFFS0154R1ZH
  • DirectorsPremeel Damji Shah, Kushal Dhirendra Shah, Kashyap Jitendra Shah

Key dates

this monthRegisteredAug 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

1%1 of 150 units booked
3.0%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WINGNA71491500150

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

C WING: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed464

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots464
Closed/Covered464

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,462 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Feb 2026
LandownerVillageDistrict
SMT KANTA DAMJI SHAHMumbai CityMumbai City
SMT CHANDRIKA DHIRENDRA SHAHMumbai CityMumbai City
SMT CHHAYA JITENDRA SHAHMumbai CityMumbai City
SHRI DAMJI RAMJI SHAHMumbai CityMumbai City
SHRI DHIRENDRA BABULAL SHAHMumbai CityMumbai City
SHRI JITENDRA BABULAL SHAHMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI68784.05
Proposed, not sanctioned28,784 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNIRLON HOUSE,DR ANNIE BESANT RD,WORLI,MUMBAI
Estimated costRs 1,163.84 cr
Cost incurredRs 34.71 cr
Work done2.98%
BuildingWingEstimatedIncurred
C WINGNARs 1,163.84 crRs 34.71 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTalati & Partners LLP
ArchitectBarai Architects
ArchitectAakar Architects & consultants
EngineerMahimtura Consultants Pvt Ltd
EngineerNarendra Kumar Jangir
Chartered AccountantMEISHERI PALANI&COMPANY
PartnerRole in project
Samak Constructions Pvt. Ltd-

Litigation declared20

CaseCourtStatus
RAER/2004006/2007/2007Small Cause CourtOngoing
Appeal A1/46/2024/2024Small Causes CourtOngoing
Suit/102082/2015/2015Session CourtOngoing
Suit/102542/2014/2014Session CourtOngoing
Suit/102353/2022/2022City Civil CourtOngoing
NM/103994/2022/2022City Civil CourtOngoing
Suit/102655/2014/2014City Civil CourtOngoing
RAE/1368/2023/2023Small Cause CourtOngoing
RAE/1367/2023/2023Small Cause CourtOngoing
RAE/696/2024/2024Small Cause CourtOngoing
RAE/697/2024/2024Small Cause CourtOngoing
RAE/698/2024/2024Small Cause CourtOngoing
RAE/699/2024/2024Small Cause CourtOngoing
RAE/700/2024/2024Small Cause CourtOngoing
RAE/803/2024/2024Small Cause CourtOngoing
RAE/802/2024/2024Small Cause CourtOngoing
RAE/804/2024/2024Small Cause CourtOngoing
WP/2731/2022/2022Mumbai High CourtOngoing
WP/2897/2016/2016Mumbai High CourtOngoing
RAER/2004006/2007/2007Small Cause CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA Form 1 as on 31032026-The Empire Tower.pdf20 May 2026
Withdrawal Update Form 2File: RERA Form 2 as on 31032026- The Empire Tower.pdf20 May 2026
Withdrawal Update Form 3File: RERA Form 3 as on 31032026- The Empire Tower.pdf20 May 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30062025- The Empire Tower.pdf1 Mar 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30092025- The Empire Tower.pdf1 Mar 2026
Withdrawal Update Form 1File: RERA Form 1 as on 31122025- The Empire Tower.pdf1 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf1 Mar 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30092025- The Empire Tower.pdf1 Mar 2026
Withdrawal Update Form 2File: RERA Form 2 as on 31122025- The Empire Tower.pdf1 Mar 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30062025 The Empire Tower.pdf1 Mar 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30092025- The Empire Tower.pdf1 Mar 2026
Withdrawal Update Form 3File: RERA Form 3 as on 31122025- The Empire Tower.pdf1 Mar 2026
Form 5 (FY 2024-2025)File: RERA Form 5 FY 20242025.pdf1 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 30092024- The Empire Tower.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 31122024- The Empire Tower.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 30092024- The Empire Tower.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 31122024- The Empire Tower.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 30092014- The Empire Tower.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 31122014- The Empire Tower.pdf12 Mar 2025
Other - FinanceFile: Self Declaration.pdf13 Aug 2024
Layout approvalFile: Drawing (2)_1-1 (1) (1) (1).pdf8 Aug 2024
Copy of the legal title reportFile: 2 Commencement Certificates _ NA Order for plotted development (1).pdf8 Aug 2024
Details of encumbrances concerned to FinanceFile: 2 Commencement Certificates _ NA Order for plotted development (1).pdf8 Aug 2024
Details of encumbrances concerned to LegalFile: 2 Commencement Certificates _ NA Order for plotted development (1).pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing (2)_1-1 (1) (1) (1).pdf8 Aug 2024
Layout approvalFile: Drawing FINAL_2-2 (1).pdf2 Aug 2024
Layout approvalFile: Drawing FINAL_3-3.pdf2 Aug 2024
Layout approvalFile: Drawing FINAL_4-4.pdf2 Aug 2024
Layout approvalFile: Drawing FINAL_5-5.pdf2 Aug 2024
Layout approvalFile: Drawing FINAL_6-6.pdf2 Aug 2024
Layout approvalFile: Drawing 18.pdf2 Aug 2024
Layout approvalFile: Drawing 19.pdf2 Aug 2024
Layout approvalFile: Drawing 20.pdf2 Aug 2024
Layout approvalFile: Drawing 21.pdf2 Aug 2024
Layout approvalFile: Drawing 22.pdf2 Aug 2024
Layout approvalFile: Drawing 23.pdf2 Aug 2024
Layout approvalFile: Drawing 24.pdf2 Aug 2024
Layout approvalFile: Drawing 25.pdf2 Aug 2024
Layout approvalFile: Drawing 26_compressed.pdf2 Aug 2024
Details of encumbrances concerned to FinanceFile: No Legal Encumbrance.pdf2 Aug 2024
Details of encumbrances concerned to LegalFile: No Legal Encumbrance.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing FINAL_2-2 (1).pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing FINAL_3-3.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing FINAL_4-4.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing FINAL_5-5.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing FINAL_6-6.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 18.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 19.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 20.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 21.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 22.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 23.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 24.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 25.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing 26_compressed.pdf2 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation Approval letter (1).pdf2 Aug 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf1 Aug 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf1 Aug 2024
Other - TechnicalFile: Annexure A (6).pdf1 Aug 2024
Layout approvalFile: Drawing (2)_1-1 (1) (1) (1).pdf31 Jul 2024
Building plan approvalFile: IOD (3).pdf31 Jul 2024
PAN CardFile: Pancard SAMAK CONSTRUCTIONS PVT LTD.pdf31 Jul 2024
Copy of the legal title reportFile: Legal Title Report (3).pdf31 Jul 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf31 Jul 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf31 Jul 2024
Copy of Layout Approval (in case of layout)File: Drawing (2)_1-1 (1) (1) (1).pdf31 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD (3).pdf31 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: FirstCC_signed.pdf31 Jul 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf31 Jul 2024
Declaration in FORM BFile: Form B.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf31 Jul 2024
CERSAI detailsFile: CERSAI Declaration (16).pdf31 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured Finance.pdf31 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf31 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Premeel Disclosure of Interest.pdf31 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Kashyap Disclosure of Interest.pdf31 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Kushal Disclosure of Interest.pdf31 Jul 2024
Proforma of Agreement for saleFile: samak agreement.pdf31 Jul 2024
Proforma of Allotment letterFile: allotment letter sheetal.pdf31 Jul 2024

How this compares with Mumbai City

1%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Empire Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Grant Road780+ in Mumbai City

2 kmThe Empire TowerCompleted 18Lapsed / revoked 21Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 108 registered projects within 2 km.

Builder: Samak Constructions Pvt. Ltd

Samak Constructions Pvt. Ltd has 1 registration on MahaRERA, including The Empire Tower. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if The Empire Tower is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Empire Tower?

The registered promoter entity is Samak Constructions Pvt. Ltd, a company as per the filing. Its GSTIN 27AFFFS0154R1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Empire Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Empire Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Empire Tower?

The professionals named in the filing: Architect: Talati & Partners LLP; Architect: Barai Architects; Architect: Aakar Architects & consultants; Engineer: Mahimtura Consultants Pvt Ltd; Engineer: Narendra Kumar Jangir; Chartered Accountant: MEISHERI PALANI&COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Empire Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Empire Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Empire Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.