Registered No litigation declared Others project

CELESTIAL GLORY 1

By V-VANGUARD DEVELOPERS PRIVATE LIMITED

RG-MH-33016 · RERA P51800080516 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 31%
69 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

CELESTIAL GLORY 1 is a Others project by V-VANGUARD DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080516 on 12 Jun 2025. Possession is promised by 30 Dec 2027. 2 of the 71 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameCELESTIAL GLORY 1
  • TypeOthers
  • Location
    • LINK ROAD
    • BORIVALI WEST
    • Eksar
    • Borivali
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • RERA no.P51800080516
  • ReraGenie IDRG-MH-33016

Builder

  • NameV-VANGUARD DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU41001MH2026PTC469474
  • GSTIN27AAMCV0124D1ZM

Key dates

this monthRegisteredJun 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Jun 2025
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed43 files

Current status

3%2 of 71 units booked
20.2%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CELESTIAL GLORY 1NA1716531871

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 31%.

CELESTIAL GLORY 1: 30% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure31%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area865 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jul 2025
LandownerVillageDistrict
OM SRI CO-OPERATIVE HOUSING SOCIETY LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2919.2
Proposed, not sanctioned2,858 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 14.70 cr
Cost incurredRs 2.97 cr
Work done20.2%
BuildingWingEstimatedIncurred
CELESTIAL GLORY 1NARs 14.70 crRs 2.97 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGNS & ENGINEER
ArchitectSK Designs & Engineers
EngineerJACOB BASTYAW D'SOUZA
Chartered AccountantNEHALI & CO
PartnerRole in project
V-VANGUARD DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 (1).pdf9 May 2026
Withdrawal Update Form 2File: ENGINEER.pdf9 May 2026
Withdrawal Update Form 3File: CA.pdf9 May 2026
Withdrawal Update Form 1File: form 1 (architect certificate)_Certificate for completion_(oct 25 to dec25)_digital signed7 May 2026
Withdrawal Update Form 1File: form 1 (architect certificate)_Certificate for completion_(oct 25 to dec25)_digital signed7 May 2026
Withdrawal Update Form 2File: 31 ENGINEER FORM 2 CELESTIAL GLORY 1 DEC 25 signed.pdf7 May 2026
Withdrawal Update Form 2File: 31 ENGINEER FORM 2 CELESTIAL GLORY 1 DEC 25 signed.pdf7 May 2026
Withdrawal Update Form 3File: CA Certificate Celestial Glory dec25 signed.pdf7 May 2026
Withdrawal Update Form 3File: CA Certificate Celestial Glory dec25 signed.pdf7 May 2026
Commencement certificateFile: Further CC upto 14th floor.pdf30 Oct 2025
Withdrawal Update Form 1File: form 1 (architect certificate)_R1 Signed.pdf30 Oct 2025
Withdrawal Update Form 2File: 31 ENGINEER FORM 2 CELESTIAL GLORY-1_Signed.pdf30 Oct 2025
Withdrawal Update Form 3File: Signed CA Certificate_Celestial Glory-1.pdf30 Oct 2025
Withdrawal Update Form 1File: form 1.pdf25 Oct 2025
Withdrawal Update Form 2File: form 2.pdf25 Oct 2025
Withdrawal Update Form 3File: Signed CA Certificate_Celestial Glory-R3.pdf25 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31 Engineer Form 2 Celestial Glory 1.pdf17 Apr 2025
Copy of the legal title reportFile: Title Certificate - Om Sri CHS 16042025.pdf16 Apr 2025
Declaration in FORM BFile: Form B_Affidavit.pdf16 Apr 2025
Declaration about Commencement CertificateFile: CC COVERING LETTER (1).pdf16 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - new bank letter.pdf16 Apr 2025
Other - TechnicalFile: Declaration cum undertaking for standalone bldg.pdf16 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secured unsecured declaration (1).pdf16 Apr 2025
Details of encumbrances concerned to FinanceFile: No Encumbrance certificate (2).pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate_Celestial Glory_Reg (3).pdf15 Apr 2025
CERSAI detailsFile: cersai declaration (4).pdf15 Apr 2025
Deviation Report with respect to Allotment letterFile: No deviation report on allotment letter (1).pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: No Encumbrance certificate (2).pdf15 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report for agreement (1).pdf15 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Form 'B' (bank letter) (1).pdf15 Apr 2025
Layout approvalFile: Drawing (IOD approved) (1) (1) (1)_1-3.pdf29 Mar 2025
Layout approvalFile: Drawing (IOD approved) (1) (1) (1)_4-end.pdf29 Mar 2025
Building plan approvalFile: 2449937_IOD_signed (1).pdf29 Mar 2025
PAN CardFile: Pancard - Vanguard (1).pdf29 Mar 2025
Copy of Layout Approval (in case of layout)File: Drawing (IOD approved) (1) (1) (1)_1-3.pdf29 Mar 2025
Copy of Layout Approval (in case of layout)File: Drawing (IOD approved) (1) (1) (1)_4-end.pdf29 Mar 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECT CERTIFICATE-VANGUARD (2).pdf29 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: First Commence certificate_250325 (1).pdf29 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2449937_IOD_signed (1).pdf29 Mar 2025
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf29 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other organization (anson gonsalves).pdf29 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other organization (wilson john).pdf29 Mar 2025

How this compares with Mumbai Suburban

3%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CELESTIAL GLORY 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI WEST6,700+ in Mumbai Suburban

Builder: V-VANGUARD DEVELOPERS PRIVATE LIMITED

V-VANGUARD DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including CELESTIAL GLORY 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CELESTIAL GLORY 1 is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CELESTIAL GLORY 1?

The registered promoter entity is V-VANGUARD DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U41001MH2026PTC469474 and GSTIN 27AAMCV0124D1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CELESTIAL GLORY 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CELESTIAL GLORY 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CELESTIAL GLORY 1?

The professionals named in the filing: Architect: DESIGNS & ENGINEER; Architect: SK Designs & Engineers; Engineer: JACOB BASTYAW D'SOUZA; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CELESTIAL GLORY 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CELESTIAL GLORY 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CELESTIAL GLORY 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.