ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Celeste 612

Registered No litigation declared Others project

Celeste 612

By Hiralal Ramnarayan Gupta

RG-MH-71277 · RERA P51700049672 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Celeste 612 is a Others project by Hiralal Ramnarayan Gupta in Thane, Maharashtra, registered with MahaRERA as P51700049672 on 22 Feb 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameCeleste 612
  • TypeOthers
  • Location
    • Mumbra
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • RERA no.P51700049672
  • ReraGenie IDRG-MH-71277

Builder

  • NameHiralal Ramnarayan Gupta
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Celeste 612NA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

Celeste 612: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Closed/Covered51
Open Space71

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,446 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Meenakshi Hiralal GuptaThane (M Corp.)Thane

Approvals and building plan

Permissible FSI4868.09
Proposed, not sanctioned4,868 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot 137/2 Kedar Bhavan, Old Panvel Road,Mumbra-400612

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Jitesh P. Pawar & Associates
EngineerShravani Consultant
Chartered AccountantM S Kulkarni and Co LLP Himanshu Joshi
Chartered AccountantSoham Ketkar and Associates
PartnerRole in project
Hiralal Ramnarayan Gupta-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 upto 30-06-2026.pdf17 Jul 2026
Form 2File: form 2 upto 30-06-2026.pdf17 Jul 2026
Form 3File: form 3 upto 30-06-2026.pdf17 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory upto 30-06-2026.pdf17 Jul 2026
Form 1File: form 1 upto 31-03-2026.pdf18 Apr 2026
Form 2File: form 2 upto 31-03-2026.pdf18 Apr 2026
Form 3File: form 3 upto 31-03-2026.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked inventory upto 31-03-2026.pdf18 Apr 2026
Form 2A (FY 2022-2023)File: FORM 2A 2022-23.pdf23 Jan 2026
Form 2A (FY 2023-2024)File: FORM 2A 2023-24.pdf22 Jan 2026
Form 2A (FY 2024-2025)File: FORM 2A 2024-25.pdf22 Jan 2026
Form 1File: form 1 upto 31-12-2025.pdf20 Jan 2026
Form 2File: form 2 upto 31-12-2025.pdf20 Jan 2026
Form 3File: Form 3 upto 31-12-2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory upto 31-12-2025.pdf20 Jan 2026
Form 1File: form 1 upto 30-09-2025.pdf1 Nov 2025
Form 2File: form 2 upto 30-09-2025.pdf1 Nov 2025
Form 3File: form 3 upto 30-09-2025.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & Booked inventory upto 30-09-2025.pdf1 Nov 2025
Form 1File: form 1 upto 31-12-2023.pdf24 Jul 2025
Form 2File: form 2 upto 31-12-2023.pdf24 Jul 2025
Form 3File: Form 3 upto 31-12-2023.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory upto 31-12-2023.pdf24 Jul 2025
Form 1File: form 1 upto 31-03-2024.pdf24 Jul 2025
Form 2File: form 2 upto 31-03-2024.pdf24 Jul 2025
Form 3File: Form 3 upto 31-03-2024.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory 31-03-2024.pdf24 Jul 2025
Form 1File: form 1 upto 30-06-2024.pdf24 Jul 2025
Form 2File: form 2 upto 30-06-2024.pdf24 Jul 2025
Form 3File: Form 3 upto 30-06-2024.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory 30-06-2024.pdf24 Jul 2025
Form 1File: form 1 upto 30-09-2024.pdf24 Jul 2025
Form 2File: form 2 upto 30-09-2024.pdf24 Jul 2025
Form 3File: Form 3 upto 30-09-2024.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory upto 30-09-2024.pdf24 Jul 2025
Form 1File: form 1 upto 31-12-2024.pdf24 Jul 2025
Form 2File: form 2 upto 31-12-2024.pdf24 Jul 2025
Form 3File: Form 3 upto 31-12-2024.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory upto 31-12-2024.pdf24 Jul 2025
Form 1File: form 1 upto 31-03-2025.pdf24 Jul 2025
Form 2File: form 2 upto 31-03-2025.pdf24 Jul 2025
Form 3File: Form 3 upto 31-03-2025.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory upto 31-03-2025.pdf24 Jul 2025
Form 1File: form 1 Architect certificate upto 30-06-2025.pdf18 Jul 2025
Form 2File: form 2 engg certificate upto 30-06-2025.pdf18 Jul 2025
Form 3File: Form 3 CA Certificate upto 30-06-2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & Booked inventory upto 30-06-2025.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 5th slab certificate.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory Celeste 612 31-06-2024.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate new.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory Celeste 612_31_12_2023.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory Celeste 612_31_04_2024.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE 31_12_2023.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE 31_03_2024.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate new.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf29 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account.pdf14 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA QC final.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final Form 5Celeste 612Signed.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT JAN TO MAR 2023.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT APR TO JUNE 2023.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE JAN TO MARCH 2023.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEERS CERTIFICATE APRIL TO JUNE 2023.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY CELESTE 612 30june.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 14 Sept 2023.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30 Sept 2023.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure.pdf19 Apr 2023
Other - TechnicalFile: Quality Assurance Certificate.pdf19 Apr 2023
Declaration about Commencement CertificateFile: Form D-Celeste 612.pdf9 Feb 2023
CERSAI detailsFile: CERSAI Search Report.pdf9 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration.pdf9 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf1 Feb 2023
Proforma of Agreement for saleFile: rera agreement.pdf1 Feb 2023
Details of encumbrances concerned to FinanceFile: signed details of legal.pdf31 Jan 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Celeste 612 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbra7,600+ in Thane

Builder: Hiralal Ramnarayan Gupta

Hiralal Ramnarayan Gupta has 1 registration on MahaRERA, including Celeste 612. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Celeste 612 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Celeste 612?

The registered promoter entity is Hiralal Ramnarayan Gupta, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Celeste 612?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Celeste 612?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Celeste 612?

The professionals named in the filing: Architect: M/s. Jitesh P. Pawar & Associates; Engineer: Shravani Consultant; Chartered Accountant: M S Kulkarni and Co LLP Himanshu Joshi; Chartered Accountant: Soham Ketkar and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Celeste 612?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Celeste 612. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Celeste 612 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.