CASA IMPERIA
RG-MH-22026 · RERA P52100030685 · Last updated on MahaRERA portal: 5 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 33 months
- 5 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 3 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CASA IMPERIA is a Residential / Group Housing project by Aum Sanskruti Housing in Pune, Maharashtra, registered with MahaRERA as P52100030685 on 8 Sep 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 33 months from the original filing. 302 of the 302 units on this registration are recorded sold or booked, and 28 of 33 construction stages are filed complete.
At a glance
Project
- NameCASA IMPERIA
- TypeResidential / Group Housing
- Location
- WAKADKAR VASTI
- WAKAD
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100030685
- ReraGenie IDRG-MH-22026
Builder
- NameAum Sanskruti Housing
- Entity typePartnership
- PartnersALPESH JASHUBHAI PATEL, SHARAD NARAYAN MOGALE, KETAN JAYANTILAL VEERA, SRUSHTI RAAKESHH SUREKAA, JETHALAL RATANSHI PATEL, PARESH NANJIBHAI PATEL, RAJESHKUMAR RAGHUBHAI PATEL, GOVERDHANLAL SUKHILAL MAKANI, RAJU SHANKAR VIDHATE, ARVINDKUMAR SHIVJI PATEL, KISHOR SHIVDAS PATEL, CHANDULAL SHIVDASBHAI POKAR and 4 more
- Other registrations1 more →
- Completed1 of 2
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Sep 2021
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 30 Jun 2024)
- Buildings3 building records
- Documents filed109 files
Current status
Figures as on 5 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D1 | NA | 18 | 14 | 54 | 0 | 54 |
| D2 | NA | 18 | 14 | 138 | 0 | 138 |
| D3 | NA | 18 | 14 | 110 | 0 | 110 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
D182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed251
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| D1 | 44 | 44 |
| D2 | 115 | 115 |
| D3 | 92 | 92 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| D1 | NA | Rs 97.34 cr | Rs 97.34 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMEER WALIMBE |
| Engineer | Kalpesh Zabak |
| Chartered Accountant | Abhishek Godha |
| Chartered Accountant | Form III Priyanka Chordiya and Associates |
| Chartered Accountant | SAC & CO LLP |
| Partner | Role in project |
|---|---|
| Aum Sanskruti Housing | - |
Extensions applied for5
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject nearing competition stage. some finishing work going on also time required to get completion certificate from Authority
Reason as filed by the promoterWe have received the revised plan for the addition of two units in our building. Accordingly, we estimate that an additional period of six months will be required to complete the overall project in its entirety . We are unable to update QPR ,Hence document related to QPR attached herewith.
Reason as filed by the promoterAll activities have been completed. However, additional time is required to make the application for completion, which requires another three months to obtain all NOCs along with the Completion/Occupancy Certificate. Some NOCs have been received, while some are still pending; therefore, an extension is required. The received NOCs are attached for your reference. Hence, the extension application has been made up to 31.03.2026
Reason as filed by the promoterThis is to inform that the project has substantially progressed and a *Part Completion Certificate* has already been obtained from the competent authority for a portion of the project. Further, the application for issuance of the *Completion Certificate for the balance units* has already been duly submitted to the concerned authority. However, the same is currently under process and is yet to be received.In view of the above, the delay in obtaining the final Completion Certificate is procedural and beyond the our control . Accordingly, an application for *extension of the project registration*
Reason as filed by the promoterThe Promoter respectfully submits that the construction and development work of the project has been substantially completed in all material respects. The Project has reached the final stage of completion, and all statutory compliances and approvals required from the concerned Government Authorities and Local Bodies have been obtained. The Promoter has received the requisite No Objection Certificates (NOCs) and clearances from all the concerned departments, including the statutory authorities whose approvals are mandatory for issuance of the Occupancy Certificate (OC). Consequently, the applic
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Aug 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed109
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2021-2022)File: form 2 A 2021-22.pdf | 5 Aug 2026 |
| Form 2A (FY 2022-2023)File: Form 2 A 2022-23.pdf | 5 Aug 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf | 5 Aug 2026 |
| Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf | 5 Aug 2026 |
| Form 5 (FY 2022-2023)File: Form 5 _CASA Imperia_FY 22_23.pdf | 5 Aug 2026 |
| Form 5 (FY 2023-2024)File: form 5 Casa Imperia 31032024_compress.pdf | 5 Aug 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A CAMA IMPERIA 25 26.pdf | 27 Jul 2026 |
| Form 5 (FY 2025-2026)File: Form 5 Casa Imperia FY 2025 2026 sign_compressed.pdf | 27 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 sign.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: Form-2 Casa imperia.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 3006026casa imperia sign.pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 casa imperia sign 31032026.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: Form-2 CASA IMPERIA.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: Form-3 CASA IMPERIA 31_03_2026 sign_compressed.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 casa imperia sign 31122025.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 casa imperia sign 31122025.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 31122025-casa imperia sign_compressed.pdf | 13 Feb 2026 |
| Form 2A (FY 2024-2025)File: form 2a casa imperia fy 24 25.pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 casa imperia 30-06-2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 casa imperia 30092025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: ASH FORM-2 30-06-2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: ASH FORM-2 30-09-2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 30062025casa imperia sign_FINAL_compressed.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 30092025_casa imperia_finalLL.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Casa Imperia FY 2024-2025 sign.pdf | 17 Oct 2025 |
| Form 1File: Form 1.pdf | 25 Jun 2025 |
| Form 2File: form -2_0001 31032025.pdf | 25 Jun 2025 |
| Form 3File: Form 3 31032025 casa imperia sign_compressed.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Casa Imeria 31-03-2025_0001.pdf | 25 Jun 2025 |
| Form 1File: Form 1 Casa Imperia.pdf | 25 Jun 2025 |
| Form 2File: Form 2 casa imperia sign.pdf | 25 Jun 2025 |
| Form 3File: Form 3 31122024_casa imperia_compress.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Casa Imperia _compress.pdf | 25 Jun 2025 |
| Form 1File: FORM 1 Casa Imperia on 30092024.pdf | 25 Jun 2025 |
| Form 2File: MAHA RERA FORM 2 30_09_2024 Casa Imperia.pdf | 25 Jun 2025 |
| Form 3File: Form 3 30_09_2024_casa imperia_sign_compressed.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold of units Casa Imperia 30_09_2024_compressed.pdf | 25 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032025 casa imperia sign_compressed.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form -2_0001 31032025.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Casa Imeria 31-03-2025_0001.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Casa Imperia.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024_casa imperia_compress.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 casa imperia sign.pdf | 13 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Casa Imperia _compress.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30_09_2024_casa imperia_sign_compressed.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHA RERA FORM 2 30_09_2024 Casa Imperia.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold of units Casa Imperia 30_09_2024_compressed.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Casa Imperia 31032024_compress.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold CASA IMPERIA_compressed.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Casa Imperia 10-07-2024.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CASA IMPERIA 30-06-2024_compressed.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: CASA IMPERIA Sold Unsold Inventory 31032024_compressed.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 CASA IMPERIA D1D2 D3.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 casa IMPERIA 31032024_compressed.pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a casa imperia.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sign Form 3 CASA IMPERIA 31-03-2024_compressed.pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a casa imperia fy 22 23.pdf | 7 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1D1 D2 D3 JULY TO SEPT 23 CASAIMPERIA.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM1 D1 D2 D3 OCT TO DEC23 CASAIMPERIA.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_CASA IMPERIA_FY 21_22.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHA RERA FORM 2 31122023 Casa Imperia-sign_compressed.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold of units Casa Imperia 31122023_compressed.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122023 casa imperia both sign_compressed.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 CASA IMPERIA_compressed.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: CASA IMPERIA disclosure sold unsold_compressed (1).pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 casa imperia 30092023 both signed.pdf | 1 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 _CASA Imperia_FY 22_23.pdf | 31 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE MERGED.pdf | 8 Sep 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE MERGED.pdf | 8 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT DECLARATION.pdf | 8 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO ALLOTME NT LETTER.pdf | 8 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation report with to model copy of agreement.pdf | 8 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_Sharad_Ajit_Ketan merged_compressed.pdf | 25 Aug 2023 |
| Proforma of Allotment letterFile: 3 Proforma of Allotment letter.pdf | 25 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_30062023 Casa Imperia.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 casa imperia 30032023.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_30062023 Casa Imperia.pdf | 16 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold 30032023 casa imperia_SIGNED FINAL.pdf | 16 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold of units Casa Imperia 30062023_sign_Reduce.pdf | 16 Aug 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| CASA IMPERIA PHASE 3 | WAKADKAR WASTI WAKAD PIMPRI CHINCHWAD PUNE 57 | 94 | Completed | Oct 2020 | Jul 2020 |
| CASA IMPERIA PHASE 2 | WAKADKAR WASTI WAKAD PIMPRI CHINCHWAD PUNE 57 | 141 | Completed | Jun 2015 | Dec 2014 |
| CASA IMPERIA PHASE 1 | WAKADKAR WASTI WAKAD PIMPRI CHIMCHWAD PUNE 57 | 161 | Completed | Sep 2014 | Apr 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 109 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CASA IMPERIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAKAD13,700+ in Pune
Filed coordinates, straight-line distance. 257 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Aum Sanskruti Housing
Aum Sanskruti Housing has 2 registrations on MahaRERA, including CASA IMPERIA EWS and CASA IMPERIA. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if CASA IMPERIA is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CASA IMPERIA?
The registered promoter entity is Aum Sanskruti Housing, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CASA IMPERIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CASA IMPERIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CASA IMPERIA?
The professionals named in the filing: Architect: SAMEER WALIMBE; Engineer: Kalpesh Zabak; Chartered Accountant: Abhishek Godha; Chartered Accountant: Form III Priyanka Chordiya and Associates; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CASA IMPERIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback