ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / CAPITAL ONE

Completed No litigation declared Commercial project

CAPITAL ONE

By SWOJAS ICON CONSTRUCTIONS LLP

RG-MH-23030 · RERA P52100033168 · Last updated on MahaRERA portal: 19 Apr 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

CAPITAL ONE is a Commercial project by SWOJAS ICON CONSTRUCTIONS LLP in Pune, Maharashtra, registered with MahaRERA as P52100033168 on 9 Feb 2022. The registration is recorded completed; possession was promised by 31 Oct 2024.

At a glance

Project

  • NameCAPITAL ONE
  • TypeCommercial
  • Location
    • MODEL COLONY ROAD
    • BHAMBURDA SHIVAJINAGAR
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411016
  • Pincode411016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033168
  • ReraGenie IDRG-MH-23030

Builder

  • NameSWOJAS ICON CONSTRUCTIONS LLP
  • Entity typePartnership
  • PartnersASHUTOSH RASIKLAL SHAH, ASHISH RASIKLAL SHAH, SWOJAS ASSO LLP THROUGH ITS PARTNER ASHUTOSH RASIKLAL SHAH, RAGHUNANDAN ASHOK BEHARAY, PARAG RAMESH TEPAN, ABHISHEK VIJAYKUMAR TAMHANE, MILIND MARUTI SAKUNDE
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2022PromisedOct 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Feb 2022
  • Promised completion31 Oct 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CAPITAL ONENA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

CAPITAL ONE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered8
Open Space39

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area506 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1382.64
Proposed, not sanctioned987 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMADHUBAN KARVE ROAD PUNE 411004

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANA CONSORTIUM PVT LTD
EngineerKALPESH BHORE
Chartered AccountantSUPRIYA ABHIJIT MUNDADA
PartnerRole in project
SWOJAS ICON CONSTRUCTIONS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2024

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Capital One - Form 1 - 23-24 Q4.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Capital One - Form 2 - 23-24 Q4.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Capital One - Sold Unsold - 23-24 Q4.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Capital One - Form 3 - 23-24 Q4.pdf19 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Capital One - Completion Certificate.pdf19 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Capital One - Form 4.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Capital One - Form 1 - 2023-24 - Q3.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Capital One - Form 2 - 2023-24 - Q3.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Capital One - Sold Unsold - 2023-24 - Q3.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Capital One - Form 3 - 2023-24 - Q3.pdf19 Jan 2024
Building plan approvalFile: REVISED SANCTION PLAN-1.pdf18 Oct 2023
Building plan approvalFile: REVISED SANCTION PLAN-2.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED SANCTION PLAN-1.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED SANCTION PLAN-2.pdf18 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE NEW.pdf18 Oct 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCMENT NEW.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Capital One - Form 1 - 23-24 Q2.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Capital One - Form 2 - 23-24 Q2.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Capital One - Sold Unsold Inventory - 23-24 Q2.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Capital One - Form 3 - 23-24 Q2.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AUDIT REPORT 2022-23.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Capital One - Form 2A - 22-23.pdf29 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Capital One - Form 1 - 23-24 Q2.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Capital One - Form 2 - 23-24 Q2.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Capital One Inventory.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Capital One - Form 3 - 23-24 Q2.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Capital One - Form 1 - 22-23 Q4.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 6 - Capital One - March 2023.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Capital One - Form 3 - 22-23 Q4.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: capital one.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CAPITAL ONE AUDIT REPORT.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CAPITAL ONE.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCT CERTIFICATE.pdf15 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf15 Jan 2023
Layout approvalFile: Plan2.pdf4 Jan 2023
Building plan approvalFile: Plan1.pdf4 Jan 2023
Copy of Layout Approval (in case of layout)File: Plan2.pdf4 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan1.pdf4 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf4 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 4 - Capital One.pdf1 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Capital One - Form 3 - 22-23 Q2.pdf14 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Capital One - Form 1 - Q2.pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 1 - Capital One.pdf2 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 2 - Capital One.pdf2 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 3 - Capital One.pdf2 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA_arch_cert_22062022.pdf1 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CAPITAL ONE.pdf22 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 21032022.pdf20 Apr 2022
Copy of the legal title reportFile: karnik plot.pdf4 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf25 Dec 2021
Layout approvalFile: DEMARCATION.pdf24 Dec 2021
Building plan approvalFile: SANCTIONED PLAN-1.pdf24 Dec 2021
Building plan approvalFile: SANCTIONED PLAN-2.pdf24 Dec 2021
PAN CardFile: SWOJAS ICON - PAN.pdf24 Dec 2021
Details of encumbrancesFile: ENCUMBRANCES LETTER.pdf24 Dec 2021
Copy of Layout Approval (in case of layout)File: DEMARCATION.pdf24 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN-1.pdf24 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN-2.pdf24 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: COMEMNCEMENT CERTIFICATE.pdf24 Dec 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT.pdf24 Dec 2021
Declaration in FORM BFile: FORM B DECLARATION.pdf24 Dec 2021
CERSAI detailsFile: CERSAI CERTIFICATE.pdf24 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf24 Dec 2021
Proforma of Allotment letterFile: DRAFT AGREEMENT TO SALE.pdf24 Dec 2021
Proforma of Allotment letterFile: AMENITIES.pdf24 Dec 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf24 Dec 2021
OtherFile: INTEND LETTER.pdf24 Dec 2021
OtherFile: BOOKING LETTER.pdf24 Dec 2021
OtherFile: Partnership Deed-Swojas Icon Constructionnew).pdf24 Dec 2021
OtherFile: PROPERTY CARD.pdf24 Dec 2021
OtherFile: INDEX II OF AGREEMENT TO SALE.pdf24 Dec 2021
OtherFile: INDEX II OF SALE DEED.pdf24 Dec 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SWOJAS AAROHIFINAL PLOT NO 76 SUB PLOT NO 36 SHANTISHILA SOCIETY ERANDWANA PUNE 4110049CompletedDec 2015Oct 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CAPITAL ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAMBURDA SHIVAJINAGAR13,700+ in Pune

2 kmCAPITAL ONECompleted 67Lapsed / revoked 33Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 170 registered projects within 2 km.

Builder: SWOJAS ICON CONSTRUCTIONS LLP

SWOJAS ICON CONSTRUCTIONS LLP has 1 registration on MahaRERA, including CAPITAL ONE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CAPITAL ONE is delayed beyond 31 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CAPITAL ONE?

The registered promoter entity is SWOJAS ICON CONSTRUCTIONS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CAPITAL ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CAPITAL ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CAPITAL ONE?

The professionals named in the filing: Architect: ANA CONSORTIUM PVT LTD; Engineer: KALPESH BHORE; Chartered Accountant: SUPRIYA ABHIJIT MUNDADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CAPITAL ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CAPITAL ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CAPITAL ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.