ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / BVM FLORA

Completed No litigation declared Residential / Group Housing project

BVM FLORA

By Sunny Naresh Nagdev

RG-MH-44717 · RERA P52100053235 · Last updated on MahaRERA portal: 26 Dec 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
9 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

BVM FLORA is a Residential / Group Housing project by Sunny Naresh Nagdev in Pune, Maharashtra, registered with MahaRERA as P52100053235 on 23 Oct 2023. The registration is recorded completed; possession was promised by 30 Jul 2026. The completion date has moved by 12 months from the original filing. 21 of the 30 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameBVM FLORA
  • TypeResidential / Group Housing
  • Location
    • Tathawade
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053235
  • ReraGenie IDRG-MH-44717

Builder

  • NameSunny Naresh Nagdev
  • Entity typeIndividual

Key dates

this monthRegisteredOct 2023First promiseJul 2025Revised toJul 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Oct 2023
  • Promised completion30 Jul 2026
  • Revised completionRevised to 30 Jul 2026 (originally 31 Jul 2025)
  • Buildings1 building record
  • Documents filed92 files

Current status

70%21 of 30 units booked
64.0%Work done, per cost certificate

Figures as on 26 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BVM FloraNA6630030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

BVM Flora: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area865 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
Dinkar Zipru BendaleAkurdiPune
Naresh H NagdevPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal corporation
Permissible FSI2708.9
Proposed, not sanctioned2,209 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop Nos 34 to 39 Upper Ground Floor City Pride Plot No 12 and 13 Sdc, Sector No 25, Pune Chinchwad
Estimated costRs 9.88 cr
Cost incurredRs 6.32 cr
Work done63.96%
BuildingWingEstimatedIncurred
BVM FloraNARs 8.88 crRs 5.50 cr
-NARs 1.00 crRs 81.64 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMallikarjun Ambegave
EngineerPramod Uttam Mahajan
Chartered AccountantNPSR & Associates - CA. Nandkishor Lahoti
Chartered AccountantNPSR & ASSOCIATES
Chartered AccountantGanesh SUNIL Mandlecha
PartnerRole in project
Sunny Naresh Nagdev-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20092502651Jul 2025 → Jul 2026

Reason as filed by the promoterThe construction of the project has been successfully completed, and we have already granted fit-out possession to the allottees, with most of them peacefully residing in the premises. The only pending process is the formal Completion Certificate (CC) from the local municipal corporation, which is required for issuing official possession letters

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Mail SS for Completion Certificate.pdf26 Dec 2025
Occupational CertificateFile: Part Completion 1.pdf19 Dec 2025
Occupational CertificateFile: Full Completion.pdf19 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 Latest.pdf18 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A - 31.3.2023( new 1).pdf9 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A - 31.3.2025( new 1).pdf9 Oct 2025
Form 5 (FY 2023-2024)File: form 5 with sig.pdf1 Oct 2025
Form 5 (FY 2024-2025)File: form 5 with sig.pdf1 Oct 2025
Withdrawal Update Form 1File: FORM 1.pdf20 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf20 Sep 2025
Withdrawal Update Form 3File: FORM 3_compressed.pdf20 Sep 2025
Withdrawal Update Form 1File: Q1 FORM 1 Architect Certificate.pdf18 Sep 2025
Withdrawal Update Form 2File: Q1 Form 2 Engineer Certificate -2.pdf18 Sep 2025
Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf18 Sep 2025
Withdrawal Update Form 1File: Form 1 Q1 2025.pdf19 Jul 2025
Withdrawal Update Form 2File: Q4 Form 2 Engineer Certificate.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3_compressed.pdf19 Jul 2025
Commencement certificateFile: Commencement.pdf18 Jul 2025
Declaration and undertaking (Annexure A)File: Annexure A - Declaration cum Undertaking 30-06-2025.pdf18 Jul 2025
Form 1File: Architect Form.pdf18 Jul 2025
Form 2File: enginer certificate.pdf18 Jul 2025
Form 3File: Form 3_compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled 30-06-2025.pdf18 Jul 2025
Form 1File: Architect Form_compressed (1).pdf18 Jul 2025
Form 2File: enginer certificate.pdf18 Jul 2025
Form 3File: Form 3 CA Certificate Q4.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled 30-06-2025.pdf18 Jul 2025
Form 1File: Form 1 Q1_compressed.pdf18 Jul 2025
Form 2File: Form 2 Q1.pdf18 Jul 2025
Form 3File: Form 3 Q1_compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled 30-06-2025.pdf18 Jul 2025
Form 1File: Form 1 Q2_compressed.pdf18 Jul 2025
Form 2File: Form 2 Q2.pdf18 Jul 2025
Form 3File: Form 3 Q2_compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled 30-06-2025.pdf18 Jul 2025
Form 1File: Form 1 Q3_compressed.pdf18 Jul 2025
Form 2File: fORM 2 Q3.pdf18 Jul 2025
Form 3File: Form 3 Q3_compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled 30-06-2025.pdf18 Jul 2025
Form 1File: Form 1 Q1 2025.pdf18 Jul 2025
Form 2File: Q4 Form 2 Engineer Certificate.pdf18 Jul 2025
Form 3File: form 3_11zon (1).pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled 30-06-2025.pdf18 Jul 2025
Withdrawal Update Form 1File: Form 1 Q1 2025.pdf18 Jul 2025
Withdrawal Update Form 1File: Form 1 Q1 2025.pdf18 Jul 2025
Withdrawal Update Form 2File: Q4 Form 2 Engineer Certificate.pdf18 Jul 2025
Withdrawal Update Form 2File: Q4 Form 2 Engineer Certificate.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3_compressed.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3_compressed.pdf18 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 Form 2 Engineer Certificate.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 2025.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1_compressed.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2_compressed.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3_compressed.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1_compressed.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2_compressed.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3_compressed.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 Q3.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q4.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: enginer certificate.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form_compressed (1).pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf8 Feb 2024
Layout approvalFile: Main Layout.pdf26 Aug 2023
Building plan approvalFile: Main Layout.pdf26 Aug 2023
PAN CardFile: Pan card.pdf26 Aug 2023
Copy of the legal title reportFile: Search Titile 17092023.pdf26 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrances Finance.pdf26 Aug 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES LEGAL NEW.pdf26 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrances Finance.pdf26 Aug 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES LEGAL NEW.pdf26 Aug 2023
Copy of Layout Approval (in case of layout)File: Main Layout.pdf26 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Main Layout.pdf26 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf26 Aug 2023

How this compares with Pune

70%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BVM FLORA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathawade13,700+ in Pune

2 kmBVM FLORACompleted 68Lapsed / revoked 37Other 144Dot size: filed unitsN

Filed coordinates, straight-line distance. 249 registered projects within 2 km.

Builder: Sunny Naresh Nagdev

Sunny Naresh Nagdev has 1 registration on MahaRERA, including BVM FLORA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BVM FLORA is delayed beyond 30 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BVM FLORA?

The registered promoter entity is Sunny Naresh Nagdev, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BVM FLORA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BVM FLORA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BVM FLORA?

The professionals named in the filing: Architect: Mallikarjun Ambegave; Engineer: Pramod Uttam Mahajan; Chartered Accountant: NPSR & Associates - CA. Nandkishor Lahoti; Chartered Accountant: NPSR & ASSOCIATES; Chartered Accountant: Ganesh SUNIL Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BVM FLORA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BVM FLORA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BVM FLORA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.