Broadway - Brooklyn, Manhattan and EWS
RG-MH-77894 · RERA P52100016356 · Last updated on MahaRERA portal: 11 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
- Litigation declared, 12 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Broadway - Brooklyn, Manhattan and EWS is a Residential / Group Housing project by LAVIM DEVELOPERS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100016356 on 8 May 2018. Possession was promised by 1 Jun 2024 and is now 28 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameBroadway - Brooklyn, Manhattan and EWS
- TypeResidential / Group Housing
- Location
- Datta Mandir Road
- Wakad
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100016356
- ReraGenie IDRG-MH-77894
Builder
- NameLAVIM DEVELOPERS PVT LTD
- Entity typeCompany
- GSTIN27AAACL6194P1ZT
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorPUSHKAR PRAMOD APTE
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 May 2018
- Promised completion1 Jun 2024
- Revised completionNone
- Buildings3 building records
- Documents filed109 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Brooklyn - A | NA | 23 | 23 | 0 | 0 | 0 |
| Manhattan - B | NA | 23 | 23 | 0 | 0 | 0 |
| EWS - G | NA | 13 | 13 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 11 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
Brooklyn - A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Manhattan - B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EWS - G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities18
As on 11 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 80% |
| Multipurpose Hall | Yes | 80% |
| Club House and Swimming Pool | Yes | 80% |
| Swimming pool | Yes | 80% |
Parking filed435
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Brooklyn - A | 191 | 0 | 191 |
| Manhattan - B | 197 | 0 | 197 |
| EWS - G | 34 | 13 | 47 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s Innovative Construction Corporation | Pimpri Chinchawad (M Corp.) | Pune |
| Ajay Bipinchandra Jhaveri | Baner | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aniruddha Vaidya & Associates |
| Engineer | Koumudi Bhandarkar |
| Chartered Accountant | Kapure and Kapure |
| Partner | Role in project |
|---|---|
| LAVIM DEVELOPERS PVT LTD | - |
Litigation declared12
| Case | Court | Status |
|---|---|---|
| 1323/2014/2014 | Civil Judge Senior Division Pune | Court has allowed CRA |
| 471/2015/2015 | Civil Judge Senior Division Pune | Matter is kept for arguments on Nine A application Next date is Seven August Twenty four |
| 2223/2010/2010 | Civil Judge Senior Division Pune | Suit is dismissed |
| 1140/2016/2016 | Civil Judge Senior Division Pune | Matter is kept for hearing on Third August Twenty Four |
| 834/2015/2015 | Civil Judge Senior Division Pune | Matter is kept for evidence on fifteen July Twenty Four |
| 869/2012/2012 | Bombay High Court | CRA is allowed |
| 543/2016/2016 | Bombay High Court | Suit is dismissed |
| 2908/2015/2015 | Junior Magistrate First Class | Court has sent the complaint to the Police for investigation u s Two Zero Two of Cr P C |
| 1678/2016/2016 | Junior Magistrate First Class | Court sent the complaint to Police for investigatn Two zero two CrPC |
| 5175/2018/2018 | Bombay High Court | Matter is kept for admission as per sitting list |
| 10247/2018/2018 | Bombay High Court | The said writ Petition is dismissed |
| 178/2021/2022 | Bombay high Court | Matter is kept for preadmission |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022615 | Sanjay Pandurang Kalate | LAVIM DEVELOPERS PRIVATE LIMITED | 05/02/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Nov 2024
Documents filed109
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Broadway-Mar'25-uplaoded.pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Brooklyn, Manhattan EWS-uploaded.pdf | 10 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Broadway-Dec'24-compressed-uploaded.pdf | 16 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AJAY JHAVERI-RERA FORM-5- FY-2023-24-uploaded.pdf | 24 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 Broadway-June'24-uploaded.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 - ICC - SEPT 24-uploaded.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 - AJAY JHAVERI - SEPT 24-uploaded.pdf | 23 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ICC-RERA FORM5-FY 2023-24-compressed-uploaded.pdf | 14 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion-Braodway-Bldg AB-23Aug24.pdf | 13 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Broadway Form5-compressed-uplaoded.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure- Broadway-Sept'24-uploaded-.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 2-Broadway-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 9 Broadway -sold Unsold inventory 30June 24-extn.PDF | 15 Oct 2024 |
| Declaration about Commencement CertificateFile: 5 Declaration for Commencement Certificate-Braodway extn.pdf | 27 Jul 2024 |
| Declaration in FORM BFile: Affidavit Form B-Promoter-Broadway.pdf | 27 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Annexure A -Disclosure-Pushkar Pramod Apte-Broadway exten.pdf | 27 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Annexure A -Disclosure-Rahul Paranjape-Broadway exten.pdf | 27 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Annexure A -Disclosure-Amit Paranjape-Broadway exten.pdf | 27 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexure A -Disclosure-Lavim Developers-Broadway Exten.pdf | 27 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Declaration for Commencement Certificate-Braodway extn.pdf | 27 Jul 2024 |
| Layout approvalFile: HPSC4546 pg 1.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4547 pg 2.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4548 pg3.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4549 pg 4.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4550 pg5.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4551 pg 6.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4552 pg 7.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4553 pg 8.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4554 pg 9.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4555 pg 10.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4556 pg 11.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4557 pg 12.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4558 pg 13.pdf | 26 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: HPSC4546 pg 1.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4547 pg 2.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4548 pg3.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4549 pg 4.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4550 pg5.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4551 pg 6.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4552 pg 7.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4553 pg 8.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4554 pg 9.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4555 pg 10.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4556 pg 11.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4557 pg 12.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4558 pg 13.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Broadway-June'24-uploaded.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 29 Form 1 Broadway-June'24-uploaded.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A-Broadway 2020-uploaded.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A-Broadway 2021-uploaded.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A-Broadway 2022-uploaded.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-Broadway 2023-uploaded.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-Broadway 2024-uploaded.pdf | 15 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Braodway bldg A,B,G DATE-17-05-2024.pdf | 24 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Braodway-Mar'24-uploaded.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Report-Broadway- update 31st March 2024-uploaded.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Broadway-Mar'24-uploaded.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Broadway-Dec'23-uploaded.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Broadway-Dec'23-uploaded.pdf | 3 Jan 2024 |
| Certificates of CA (Form 3)File: 3 FORM 3-Broadway-Lavim-dt-311023-uploaded.pdf | 7 Dec 2023 |
| Certificates of CA (Form 3)File: Form 5-Broadway -FY'22-23-uploaded-22Nov'23.pdf | 22 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Broadway-Sept'23-uploaded.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5- -AJAY JHAVERI-FY 2022-23.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ICC-BROADWAY-RERA FORM5-SIGNED-FY 2022-23-uploaded.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Brodaway-Sept'23-uploaded.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Broadway-Mar'23.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2Broadway -June '23.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Broadway-June 23.pdf | 6 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 FORM 2-Broadway - Brooklyn Manhattan EWS-Mar 23.pdf | 19 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Broadway FY 2021-22-FORM 5 -uploaded.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ajay Jhaveri RERA FORM 5 FY 21 22.pdf | 30 Sep 2022 |
| OtherFile: Compliance of MahaRERA order 03July2019 uploaded.pdf | 15 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Ajay Jhaveri Broadway Owner Form 5 2020-21 compressed.pdf | 1 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ICC Broadway RERA Form 5 2020-21 compressed.pdf | 1 Oct 2021 |
| Proforma of Allotment letterFile: 6 Braodway agreement to Sale _ -Non MHADA-without annexures -Change of Lender -11June 2021 | 1 Jul 2021 |
| Proforma of Allotment letterFile: 6 Broadway Mhada Agr to sell Final 11 06 2020-Change of Lender-without annexures.pdf | 1 Jul 2021 |
| Copy of the legal title reportFile: Title Certificate Broadway 24-06-2021 -Change of Lender -Uploaded 28June 2021.pdf | 28 Jun 2021 |
| Certificates of CA (Form 3)File: BroadwayAjay JhaverOwner Form 3_compressed.pdf | 31 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Broadway Ajay JhaverOwner Form 5 compressed.pdf | 31 Mar 2021 |
| Proforma of Allotment letterFile: 5 Broadway MHADA RERA Final 12June2020 uploaded on 07Dec2020.pdf | 7 Dec 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SKY ONE | PLOT NO 444 AT CTS NO 1062 BHAMBURDE SHIVAJINAGAR PUNE | 29 | Completed | Aug 2015 | Late, Jan 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 109 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Broadway - Brooklyn, Manhattan and EWS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wakad13,700+ in Pune
Filed coordinates, straight-line distance. 242 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: LAVIM DEVELOPERS PVT LTD
LAVIM DEVELOPERS PVT LTD has 2 registrations on MahaRERA, including Broadway - Brooklyn, Manhattan and EWS and FOREST TRAILS ATHASHRI B3. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Broadway - Brooklyn, Manhattan and EWS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Broadway - Brooklyn, Manhattan and EWS is delayed beyond 1 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Broadway - Brooklyn, Manhattan and EWS?
The registered promoter entity is LAVIM DEVELOPERS PVT LTD, a company as per the filing. Its GSTIN 27AAACL6194P1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Broadway - Brooklyn, Manhattan and EWS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Broadway - Brooklyn, Manhattan and EWS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Broadway - Brooklyn, Manhattan and EWS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Broadway - Brooklyn, Manhattan and EWS?
The professionals named in the filing: Architect: Aniruddha Vaidya & Associates; Engineer: Koumudi Bhandarkar; Chartered Accountant: Kapure and Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Broadway - Brooklyn, Manhattan and EWS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback