BRAMHACORP TOWNHOUSE B

By CONTIGO INFRASTRUCTURES LLP

RG-MH-49397 · RERA P52100045228 · Last updated on MahaRERA portal: 27 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 98%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

BRAMHACORP TOWNHOUSE B is a Others project by CONTIGO INFRASTRUCTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100045228 on 10 May 2022. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameBRAMHACORP TOWNHOUSE B
  • TypeOthers
  • Location
    • -
    • BALEWADI
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100045228
  • ReraGenie IDRG-MH-49397

Builder

  • NameCONTIGO INFRASTRUCTURES LLP
  • Entity typePartnership
  • PartnersAJAY RAMKUMAR AGRAWAL, HIMANSHU VINODKUMAR AGRAWAL, KARAN VINODKUMAR AGRAWAL, DINESH MAHENDRAKUMAR AGRAWAL

Key dates

this monthRegisteredMay 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING B1NA50000
BUILDING B2NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 98%.

BUILDING B178%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUILDING B265%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 27 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes15%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,500 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4264.54
Proposed, not sanctioned2,765 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 1, City Mall, Ganeshkhind Road, Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHIL SHAIKH
EngineerPankaj Somvanshi
Chartered AccountantFAIZ SHAIKH
PartnerRole in project
CONTIGO INFRASTRUCTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Apr 2025

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 25_Townhouse B.pdf27 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate - Contigo Infra B1 B2 Building.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_Mar 25_TH B.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24_Townhouse B.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Townhouse B.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24_Townhouse B.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_Townhouse B.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Nov 24_Townhouse B.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Townhouse B.pdf14 Nov 2024
Details of encumbrancesFile: Encumbrance THB.pdf25 Oct 2024
Declaration in FORM BFile: Form B Townhouse B.pdf25 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details THB.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Townhouse B.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24_Townhouse B.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_Townhouse B.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_Townhouse B.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_TH B.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_Townhouse B.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: 17 TOWNHOUSE B.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Jun 24_Townhouse B.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Jun 24_Townhouse B.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24_TH B.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_TH B.pdf27 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Mar 24_TH B.pdf27 Apr 2024
Disclosure of sold/ booked inventoryFile: Townhouse B.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_TH B.pdf27 Apr 2024
Disclosure of sold/ booked inventoryFile: TOWNHOUSE B.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_Townhouse B.pdf24 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details Declaration.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 23_Townhouse B.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23_Townhouse B.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Dec 23_Townhouse B.pdf20 Jan 2024
Details of encumbrancesFile: Encumbrance - Townhouse B.pdf15 Dec 2023
Declaration in FORM BFile: Form B Declaration - Townhouse B.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_TH B_Sep 2023.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_TH B_Sep 2023.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_TH B_Sep 23.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: TOWNHOUSE B.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_TH B_Sep 2023.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Townhouse B.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bramhacorp Townhouse B Form 3_ Jun 2023_.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BRAMHACORP TOWNHOUSE B.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Bramhacorp Townhouse B June 2023.pdf28 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- TOWN HOUSE B.pdf28 Jul 2023
Disclosure of sold/ booked inventoryFile: TOWNHOUSE B.pdf28 Jul 2023
Declaration in FORM BFile: FORM B DECLARATION_TOWNHOUSE B.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bramhacorp Townhouse B Mar 2023.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 TOWNHOUSE B_MAR 2023.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- TOWN HOUSE b.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bramhacorp Townhouse B Form 3_ Mar 2023.pdf20 Apr 2023
CERSAI detailsFile: TOWNHOUSE B JM FINANCE.pdf19 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_Townhouse B.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 TOWNHOUSE B_Dec 2022.pdf24 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- TOWN HOUSE B.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Town house B.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Bramhacorp TownHouse B.pdf20 Jan 2023
Proforma of Agreement for saleFile: Townhouse B Comm- ISD.pdf9 Dec 2022
Proforma of Agreement for saleFile: Townhouse B Resi- ISD.pdf9 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bramhacorp Townhouse B Form 3_Sep 2022 (2).pdf15 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bramhacorp Town House B.pdf12 Oct 2022
Disclosure of sold/ booked inventoryFile: BRAMHACORP TOWNHOUSE B.pdf12 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Bramhacorp Townhouse B_Jun 22.pdf26 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bramhacorp Townhouse B Form 1.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BRAMHACORP TOWN HOUSE B.pdf11 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A BRAMHACORP TOWN HOUSE B ,B1 , B2.pdf11 Jul 2022
Disclosure of sold/ booked inventoryFile: BRAMHACORP TOWN HOUSE B.pdf11 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bramhacorp TownHouse B, B1 B2.pdf8 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Bramhacorp Townhouse B.pdf8 Jul 2022
Building plan approvalFile: Sheet - 2 - Floors Plans.pdf29 Apr 2022
Building plan approvalFile: Sheet - 3 - Section and Elevation.pdf29 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet - 2 - Floors Plans.pdf29 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet - 3 - Section and Elevation.pdf29 Apr 2022
Proforma of Allotment letterFile: Agreement - RERA - Contigo - 09042022 - MBZ - 1 - RERA Upload_compressed.pdf29 Apr 2022
Copy of the legal title reportFile: Contigo Search in RERA format_compressed.pdf28 Apr 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf28 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200235802259_For_Asset_Based_Search_25_04_2022_15_54_15_901.pdf25 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE CONTIGO.pdf23 Apr 2022
Declaration about Commencement CertificateFile: Contigo LLP Form D Declaration.pdf23 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Contigo Architect Certificate.pdf23 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf23 Apr 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BRAMHACORP TOWNHOUSE B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALEWADI13,700+ in Pune

Builder: CONTIGO INFRASTRUCTURES LLP

CONTIGO INFRASTRUCTURES LLP has 1 registration on MahaRERA, including BRAMHACORP TOWNHOUSE B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BRAMHACORP TOWNHOUSE B is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BRAMHACORP TOWNHOUSE B?

The registered promoter entity is CONTIGO INFRASTRUCTURES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BRAMHACORP TOWNHOUSE B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BRAMHACORP TOWNHOUSE B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BRAMHACORP TOWNHOUSE B?

The professionals named in the filing: Architect: RAHIL SHAIKH; Engineer: Pankaj Somvanshi; Chartered Accountant: FAIZ SHAIKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BRAMHACORP TOWNHOUSE B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BRAMHACORP TOWNHOUSE B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BRAMHACORP TOWNHOUSE B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.