Home / Browse projects / Pune, Maharashtra / Boulevard part of Towers Phase 1
Boulevard part of Towers Phase 1
RG-MH-12452 · RERA P52100004150 · Last updated on MahaRERA portal: 14 Oct 2024
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Boulevard part of Towers Phase 1 is a Commercial project by Bramhacorp Limited in Pune, Maharashtra, registered with MahaRERA as P52100004150 on 8 Aug 2017. The registration is recorded completed; possession was promised by 19 Apr 2024. 1 complaint is on record with the regulator.
At a glance
Project
- NameBoulevard part of Towers Phase 1
- TypeCommercial
- Location
- Sadhu Vaswani Road
- Pune City
- Ghorpadi
- Haveli
- Pune
- 411001
- Pincode411001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100004150
- ReraGenie IDRG-MH-12452
Builder
- NameBramhacorp Limited
- Entity typeCompany
- CINU70101PN2012PLC142705
- GSTIN27AAFCB0273N1ZI
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Other registrations25 more →
- Completed8 of 26
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Aug 2017
- Promised completion19 Apr 2024
- Revised completionNone
- Buildings1 building record
- Documents filed113 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BOULEVARD | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
BOULEVARD: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed183
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANGESH GOTAL |
| Architect | SACHIN SHAH |
| Engineer | Mahimtura consultants Pvt. Ltd. |
| Partner | Role in project |
|---|---|
| Bramhacorp Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000064459 | NIkhil Vijay Lombar | Bramhacorp Limited | 30/07/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Jan 2023
Documents filed113
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_Boulevard Phase 1.pdf | 14 Oct 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Boulevard Part of Towers Phase I.pdf | 1 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Boulevard Phase 1_Sep 23.pdf | 18 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Boulevard Phase 1_Sep 23.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Boulevard Phase 1_Sep 23.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: BOULEVARD PHASE 1.pdf | 18 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3_Boulevard Phase 1_Sep 23.pdf | 18 Oct 2023 |
| Certificates of CA (Form 5)File: Boulevard Phase 1.pdf | 30 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Boulevard Phase 1.pdf | 30 Sep 2023 |
| Building plan approvalFile: Sheet-5.pdf | 23 Sep 2023 |
| Building Plan Approval (IOD)File: Sheet-5.pdf | 23 Sep 2023 |
| Certificates of CA (Form 3)File: Boulevard Phase 1 Form 3_ Jun 2023_.pdf | 21 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_ Boulevard Ph 1- June 2023.pdf | 7 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BOULEVARD PHASE 1_JUNE 2023.pdf | 7 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- Boulevard Part of Tower Phase 1.pdf | 7 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory_BOULEVARD PART OF TOWERS PHASE 1.pdf | 7 Aug 2023 |
| Certificates of CA (Form 3)File: Boulevard Phase 1 Form 3_ Mar 2023.pdf | 20 Apr 2023 |
| Declaration in FORM BFile: BOULEVARD PART OF PHASE 1.pdf | 18 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Boulevard Ph 1- Mar 2023.pdf | 18 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BOULEVARD PHASE 1_MAR 2023.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- Boulevard Part of Tower Phase 1.pdf | 18 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: BOULEVARD PART OF TOWERS PHASE 1.pdf | 12 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_Boulevard Tower Phase 1.pdf | 27 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 Boulevard Phase 1 Mar 22.pdf | 24 Mar 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Boulevard Phase 1.pdf | 24 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BOULEVARD PHASE 1_Dec 2022.pdf | 24 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Boulevard ph 1.pdf | 23 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- Boulevard Part of Tower Phase 1.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Boulevard phase 1.pdf | 20 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3_Boulevard phase.pdf | 17 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Boulevard Completion Certificate.pdf | 16 Jan 2023 |
| Proforma of Agreement for saleFile: Boulevard Towers Phase I-ESD.pdf | 9 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BOULEVARD PHASE 1.pdf | 14 Oct 2022 |
| Certificates of CA (Form 3)File: Boulevard Phase 1 Form 3_Sep 2022.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: BOULEVARD PART OF TOWERS PHASE 1.pdf | 12 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Boulevard Phase 1.pdf | 10 Oct 2022 |
| CERSAI detailsFile: Boulevard Phase 1.pdf | 10 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A- Boulevard Part of Tower Phase 1.pdf | 7 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: BOULEVARD PART OF TOWERS PHASE 1.pdf | 30 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3_Boulevard phase 1_Jun 22_compressed.pdf | 9 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Boulevard Phase 1.pdf | 2 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: BOULEVARD PART OF TOWERS PHASE 1.pdf | 20 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Boulevard Phase 1.pdf | 8 Jul 2022 |
| Declaration in FORM BFile: BOULEVARD PART OF TOWERS PHASE 1.pdf | 5 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Boulevard Part of Towers Phase 1.pdf | 4 Jul 2022 |
| Details of encumbrancesFile: NO ENCUMBRANCE CERTIFICATE BOULEVARD PHASE.pdf | 11 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Boulevard Phase 1.pdf | 14 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A- Boulevard Part of Tower Phase 1.pdf | 14 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: 20220231 Boulevard Part Of Towers Phase 1.pdf | 14 Apr 2022 |
| Certificates of CA (Form 3)File: Boulevard Form 3 Dec 21.pdf | 12 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Boulevard Phase 1.pdf | 4 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Boulevard Phase 1.pdf | 19 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A- Boulevard Part of Tower Phase 1.pdf | 14 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: 20211231 Boulevard Part Of Towers Phase 1.pdf | 14 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Boulevard Ph I.pdf | 9 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Boulevard Phase 1.pdf | 7 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Boulevard Part of Tower Phase 1.pdf | 5 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A- Boulevard Part of Tower Phase 1.pdf | 4 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: BOULEVARD PART OF TOWERS PHASE1.pdf | 30 Sep 2021 |
| Certificates of CA (Form 3)File: BOULEVARD RERA.pdf | 15 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Boulevard.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 BOULEVARD 300919.pdf | 29 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Boulevard Phase 1 Form 5_31032020.pdf | 29 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jun 21 Architect Cert Boulevard Phase 1.pdf | 28 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: June 21 Boulevard.pdf | 26 Jul 2021 |
| Layout approvalFile: Layout Boulevard.pdf | 22 Jul 2021 |
| Building plan approvalFile: 1 - Bldg Layout.pdf | 22 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Boulevard.pdf | 22 Jul 2021 |
| Building Plan Approval (IOD)File: 1 - Bldg Layout.pdf | 22 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 22 Jul 2021 |
| Declaration about Commencement CertificateFile: CC Declaration Boulevard part of Towers phase 1.pdf | 22 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Jun 2021 sold unsold Boulevard part of Towers Phase 1.pdf | 22 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Boulevard part of towers phase 1 Inventory.pdf | 20 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Boulevard.pdf | 20 Jan 2021 |
| Certificates of CA (Form 5)File: fORM 5 FY 19-20 BOULEVARD PART OF TOWERS PHASE 1.pdf | 30 Sep 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Boulevard Phase 1.pdf | 13 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Boulevard Phase 1.pdf | 24 Jun 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Boulevard Phase I Form-2A as on Dec 2019.pdf | 27 Feb 2020 |
| Layout approvalFile: CC.pdf | 13 Feb 2020 |
| Building plan approvalFile: Boulevard_Building_layout.pdf | 13 Feb 2020 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Bramha Exuberance CP52100001076 | KONDHWA, Pune | - | Jul 2017 | Completed | Dec 2021 | Jan 2019 |
| Bramha Vantage A / B | Survey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune | 51 | - | Completed | Aug 2017 | Apr 2017 |
| Bramha Baug | Survey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune | 8 | - | Completed | Jan 2017 | Late, Feb 2017 |
| Bramha Suncity Platinum | S No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri Pune | 134 | - | Completed | Sep 2014 | Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 25 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 113 filed documents as one ZIP, foldered, with a manifest
Keep Boulevard part of Towers Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune City13,700+ in Pune
Filed coordinates, straight-line distance. 93 registered projects within 2 km.
HUES OF SKY
Bramhacorp Limited
Birla Punya Phase II
Birla Estates Private Limited
Birla Punya Phase 1
Birla Estates Private Limited
BOULEVARD TOWER A2
Bramhacorp Limited
One Place-Bund Garden Road
TOPSPACE LANDMARKS LLP
Eternia Phase 2
VENTURESPRO PROJECTS LLP
Builder: Bramhacorp Limited
Bramhacorp Limited has 26 registrations on MahaRERA, including Bramha Exuberance C and F RESIDENCES T5 T6 and T7. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Boulevard part of Towers Phase 1 is delayed beyond 19 Apr 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Boulevard part of Towers Phase 1?
The registered promoter entity is Bramhacorp Limited, a company as per the filing. Its CIN U70101PN2012PLC142705 and GSTIN 27AAFCB0273N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Boulevard part of Towers Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Boulevard part of Towers Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Boulevard part of Towers Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Boulevard part of Towers Phase 1?
The professionals named in the filing: Architect: MANGESH GOTAL; Architect: SACHIN SHAH; Engineer: Mahimtura consultants Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Boulevard part of Towers Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback