Completed No litigation declared Residential / Group Housing project

Blue Ridge Project E Land T24 and T25

By Paranjape Schemes (Construction) Ltd.

RG-MH-91014 · RERA P52100016328 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 99%
1Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

Blue Ridge Project E Land T24 and T25 is a Residential / Group Housing project by Paranjape Schemes (Construction) Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100016328 on 3 May 2018. The registration is recorded completed; possession was promised by 1 Jun 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBlue Ridge Project E Land T24 and T25
  • TypeResidential / Group Housing
  • Location
    • .
    • Hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016328
  • ReraGenie IDRG-MH-91014

Builder

  • NameParanjape Schemes (Construction) Ltd.
  • Entity typeCompany
  • DirectorABHIJIT PRAKASH KADAM
  • Other registrations28 more →
  • Completed15 of 29
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects17 →

Key dates

this monthRegisteredMay 2018PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 May 2018
  • Promised completion1 Jun 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T24NA330000
T25NA330000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 99%.

T24100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
T25100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises99%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes60%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes70%

Parking filed534

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots534
Closed/Covered496
Open Space38
BuildingClosed/CoveredOpen SpaceTotal
T2424819267
T2524819267

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,895 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI26364.5
Proposed, not sanctioned26,364 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENT, GROUND FLOOR BHANDARKAR ROAD , PUNE 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIRUDHA VAIDYA AND ASSOCIATES ARCHITECT
EngineerJW Consultants LLP
PartnerRole in project
Paranjape Schemes (Construction) Ltd.-

Litigation declared3

CaseCourtStatus
9028/2017/2016HIGH COURT MUMBAIMatter is kept for pre admission as per sitting list
9029/2017/2016HIGH COURT MUMBAIMatter is kept for pre admission as per sitting list
6443/2016/2015HIGH COURT MUMBAIMatter is kept for pre admission on as per sitting list

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000095753Stanislaus Joseph Sanjiv DcruzFLAGSHIP INFRASTRUCTURE LIMITED28/08/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Oct 2023

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-Athashri B2-FY '23-24-uploaded.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-Athashri B2-FY '23-24-uploaded.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Blue ridge land T24 25-Sept'23.pdf27 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-BR T24 and T25-Fy 22-23.pdf19 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4-Blue ridge- T 24 25 with Completion-uploaded-17Oct'23.pdf17 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate-sec R2 T-24 T-25- 04-10-2023 uploaded 110ct23.pdf11 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-T24 25-June'23.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form -2 BR T24 25- Mar 2022.pdf13 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BR T24 T25-RERA Form-1-Dec 2020-uploaded.pdf8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BR T 24 25-Form 1-june 2021-uploaded.pdf8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BR T24 T25-RERA Form-1-Dec 21-uploaded.pdf8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BR T24 T25-RERA Form-1-Quarter Sept 2022-uploaded.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: BR_T 24 25.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 T24-T25.pdf21 Dec 2021
Copy of the legal title reportFile: Title Certificate_T24 T25_20Aug2021.pdf26 Aug 2021
Details of encumbrancesFile: Encumbrance Certifiacte _T24 T25-Aug 2021.pdf26 Aug 2021
Proforma of Allotment letterFile: BR T24 25 Agree to sale Revised 2 on 09062021 uploded 14june2021.pdf14 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 16 RERA T24 T25 compressed.pdf1 Apr 2021
Copy of the legal title reportFile: Title Certificate Post Merger T24 T25 uploaded.pdf11 Mar 2021
Annual Audit Report of Statutory CA (Form 5)File: Blue Ridge T 24,25_Form 5_18-19.pdf7 Oct 2019
Proforma of Allotment letterFile: T24-25 Allotment Letter ,Draft Agreement (revised) Part I.pdf25 May 2018
Proforma of Allotment letterFile: T24-25 Draft Agreement (revised) Part II.pdf25 May 2018
Building plan approvalFile: IOD - BR T 24 and T25.pdf26 Apr 2018
Layout approvalFile: Sanction Layout - BR T 24 and T25.pdf26 Apr 2018
Copy of Layout Approval (in case of layout)File: Sanction Layout - BR T 24 and T25.pdf26 Apr 2018
Building Plan Approval (IOD)File: IOD - BR T 24 and T25.pdf26 Apr 2018
PAN CardFile: FIL NEW PAN CARD.pdf25 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: T24 AND T25 Commencement Certificate.pdf25 Apr 2018
Declaration in FORM BFile: T24-25_Form B of Promoter.pdf25 Apr 2018
PAN CardFile: PAN CARD 1.pdf24 Apr 2018
Proforma of Allotment letterFile: Agreement to Sell Blue Ridge T24 T25 Part 1.pdf23 Apr 2018
Proforma of Allotment letterFile: Agreement to Sell Blue Ridge T24 T25 Part 2.pdf23 Apr 2018
Copy of the legal title reportFile: Title Certificate_T24 _25.pdf21 Apr 2018
Details of encumbrancesFile: BR T24_25_Encumbrance Certificate.pdf21 Apr 2018
Certificates of CA (Form 3)File: FORM 3 BR Project E land T24 25.pdf21 Apr 2018

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise7 delivered late
ProjectLocationFlatsStatusPromisedDelivered
T22-23Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057240CompletedDec 2017Nov 2016
B6Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057231CompletedDec 2017Feb 2017
B4Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057238CompletedDec 2016Late, Feb 2017
B7,B8Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057240CompletedDec 2015Late, Sep 2016
T9, T10, T11Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057355CompletedDec 2014Late, Mar 2015
B1,B2,B3Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057696CompletedDec 2014Late, Sep 2016
T5, T6, T7 ,T8Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057404CompletedDec 2013Late, Mar 2015
T12, T13, T14Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057361CompletedDec 2012Late, Mar 2015
T1, T2, T3, T4Near Cognizant Tech Rajiv Gandhi Infotech Park phase1 Hinjawadi Pune 411057408CompletedDec 2011Late, Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Blue Ridge Project E Land T24 and T25 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi13,700+ in Pune

2 kmBlue Ridge Project E LanCompleted 29Lapsed / revoked 16Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: Paranjape Schemes (Construction) Ltd.

PARANJAPE SCHEMES (CONSTRUCTION) LTD has 29 registrations on MahaRERA, including SWAPNASAMRAT and Blue Ridge Project C Land T18 and T19. Its filings disclose 17 earlier MahaRERA projects: declares 9 of 17 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Blue Ridge Project E Land T24 and T25 is delayed beyond 1 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Blue Ridge Project E Land T24 and T25?

The registered promoter entity is Paranjape Schemes (Construction) Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Blue Ridge Project E Land T24 and T25?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Blue Ridge Project E Land T24 and T25?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Blue Ridge Project E Land T24 and T25?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Blue Ridge Project E Land T24 and T25?

The professionals named in the filing: Architect: ANIRUDHA VAIDYA AND ASSOCIATES ARCHITECT; Engineer: JW Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Blue Ridge Project E Land T24 and T25?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Blue Ridge Project E Land T24 and T25. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Blue Ridge Project E Land T24 and T25 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.