Completed No litigation declared Residential / Group Housing project

BLUE BIRD CO OPERATIVE SOCIETY LTD

By ASHA ARUN SANE

RG-MH-86334 · RERA P52100018398 · Last updated on MahaRERA portal: 18 Oct 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2022Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

BLUE BIRD CO OPERATIVE SOCIETY LTD is a Residential / Group Housing project by ASHA ARUN SANE in Pune, Maharashtra, registered with MahaRERA as P52100018398 on 30 Oct 2018. The registration is recorded completed; possession was promised by 30 Sep 2022.

At a glance

Project

  • NameBLUE BIRD CO OPERATIVE SOCIETY LTD
  • TypeResidential / Group Housing
  • Location
    • SHIVAJI NAGAR
    • PUNE
    • Peth
    • Haveli
    • 411004
  • Pincode411004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018398
  • ReraGenie IDRG-MH-86334

Builder

  • NameASHA ARUN SANE
  • Entity typeIndividual
  • Named personASHA ARUN SANE
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2018PromisedSep 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Oct 2018
  • Promised completion30 Sep 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA150000
BNA150000
CNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed94

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots94
Closed/Covered94
BuildingClosed/CoveredTotal
A3434
B3434
C2626

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
BLUE BIRD CO OPERATIVE SOCIETY LTDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI9361.0
Proposed, not sanctioned4,664 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAUNDH

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP HARDIKAR AND ASSOCAITES
EngineerS W MONE AND ASSOCAITES
PartnerRole in project
ASHA ARUN SANE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016919Sep 2022 → Jun 2023

Reason as filed by the promoterWe would like to clarify that there was an alteration in the Additional Parking Spaces for which revision was made and a new commencement certificate was availed as of 14-10-2022 having certificate no. CC/1813/22 and the work was completed on 21-10-2022 having completion certificate no. OCC/0715/22. Since we have completed the project work slightly beyond the estimated date of completion i.e. 21 days beyond the estimated date of completion, we have been suggested by your department to take an Extension of the project and the same is being done by us. We further need to inform you that practica

Litigation declared1

CaseCourtStatus
239/2021/2021SMALL CAUSE COURT PUNEApplication for interim relief rejected Matter now posted for evidence

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Apr 2023

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf18 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form4.pdf22 Jun 2023
Status of ConveyanceFile: Reply to Deshmukh Notice.pdf22 Apr 2023
Other - LegalFile: Reply to Deshmukh Notice.pdf22 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Blue birdCOMPLETION certificate A wing.pdf21 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate wing b and c 2172022.pdf21 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate 29032022 B and C Part.pdf21 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf12 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ASA 1920.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ASA 2021.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ASA 2122.pdf17 Jan 2023
Layout approvalFile: 01.pdf8 Nov 2022
Copy of Layout Approval (in case of layout)File: 01.pdf8 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: commencement 14102022.pdf8 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupancy Certificate.pdf8 Nov 2022
Status of ConveyanceFile: Blue Bird Scoiety Registration Certificate.pdf8 Nov 2022
Status of ConveyanceFile: Malmatta Patrak.pdf8 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_c.pdf26 Sep 2022
Certificates of CA (Form 3)File: form - 3 rera certificate.PDF24 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE - 30062022.PDF21 Sep 2022
Certificates of CA (Form 3)File: FORM -3 RERA Certificate.PDF19 Sep 2022
Copy of the legal title reportFile: Blue Bird Title report.pdf14 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate AS.pdf8 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Blue Bird.pdf8 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificates 31122021.pdf17 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31122021.pdf17 Feb 2022
Certificates of CA (Form 3)File: CA Certificates 3112021.pdf17 Feb 2022
Certificates of CA (Form 3)File: CA Certificate 31122021.pdf17 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate ASA.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_ASA.pdf7 Oct 2021
Declaration about Commencement CertificateFile: Form D ASA.pdf14 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate ASA.pdf13 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate ASA Dec.pdf13 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate ASA Mar.pdf13 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate ASA June.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate June.pdf12 Aug 2021
Certificates of CA (Form 3)File: CA Certificate June 21.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Mar.pdf3 Aug 2021
Certificates of CA (Form 3)File: CA Certificate March.pdf3 Aug 2021
Certificates of CA (Form 3)File: CA Certificate Dec 2020.pdf3 Aug 2021
Layout approvalFile: New Layout BB.pdf20 Jul 2021
Copy of Layout Approval (in case of layout)File: New Layout BB.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ASA Form 2A 1920.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ASA Form 2A 2021.pdf20 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: BLUE BIRD SOCIETY CERTIFICATE.pdf20 Jul 2021
Certificates of CA (Form 3)File: CA Certificate as on 31032020.pdf28 Jan 2021
Certificates of CA (Form 3)File: CA Certificate as on 30062020.pdf28 Jan 2021
Certificates of CA (Form 3)File: CA Certificate as on 30092020.pdf28 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi 310320.pdf9 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi 300620.pdf9 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert 300920.pdf9 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert.pdf21 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engnieers Certi 1.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engineers Certificates.pdf30 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_Arun Sane Associates.pdf4 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi 311219.PDF18 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert 311219.pdf17 Mar 2020
Certificates of CA (Form 3)File: Engineer Cert 311219.pdf17 Mar 2020
Certificates of CA (Form 3)File: CA Certificate 311219.pdf17 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architec Certi 31032019.PDF24 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert 311219.pdf24 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: bluebird Engineer Certi 310319.pdf24 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cert blue bird.PDF31 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert Jun .pdf31 Dec 2019
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf28 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert Jun .pdf5 Sep 2019
Certificates of CA (Form 3)File: CA Certificates 300619.pdf5 Sep 2019
Certificates of CA (Form 3)File: CA Certificates 31032019.pdf14 Jun 2019
Certificates of CA (Form 3)File: CA Certificates .pdf14 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architec Certi 31032019.PDF16 May 2019
PAN CardFile: Pan Card.pdf25 Oct 2018
Certificates of CA (Form 3)File: CA Certificate.pdf25 Oct 2018
Proforma of Allotment letterFile: Agreement to Sale.pdf25 Oct 2018
Details of encumbrancesFile: ASA_Affidavit.pdf24 Oct 2018
Declaration in FORM BFile: ASA_Affidavit.pdf24 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Blue Bird.pdf24 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf24 Oct 2018
Building plan approvalFile: Layout.pdf13 Oct 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Parag Wahini Co Operative Housing SocietyS NO 26 2 SR NO 570 P KOTHRUD DAHANUKAR COLONY PUNE16CompletedMay 2016May 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BLUE BIRD CO OPERATIVE SOCIETY LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmBLUE BIRD CO OPERATIVE SCompleted 56Lapsed / revoked 26Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 136 registered projects within 2 km.

Builder: ASHA ARUN SANE

ASHA ARUN SANE has 1 registration on MahaRERA, including BLUE BIRD CO OPERATIVE SOCIETY LTD. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BLUE BIRD CO OPERATIVE SOCIETY LTD is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BLUE BIRD CO OPERATIVE SOCIETY LTD?

The registered promoter entity is ASHA ARUN SANE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BLUE BIRD CO OPERATIVE SOCIETY LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BLUE BIRD CO OPERATIVE SOCIETY LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BLUE BIRD CO OPERATIVE SOCIETY LTD?

The professionals named in the filing: Architect: SANDEEP HARDIKAR AND ASSOCAITES; Engineer: S W MONE AND ASSOCAITES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BLUE BIRD CO OPERATIVE SOCIETY LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BLUE BIRD CO OPERATIVE SOCIETY LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BLUE BIRD CO OPERATIVE SOCIETY LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.