Home / Browse projects / Pune, Maharashtra / Blue Bell
Blue Bell
By Abhaysinh Dhadve Patil Constructions Private Limited
RG-MH-19840 · RERA P52100008278 · Last updated on MahaRERA portal: 3 Oct 2019
Source: official MahaRERA filing
Red flags
- 9 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Blue Bell is a Residential / Group Housing project by Abhaysinh Dhadve Patil Constructions Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100008278 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2019. 9 complaints are on record with the regulator.
At a glance
Project
- NameBlue Bell
- TypeResidential / Group Housing
- Location
- -
- Baner
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100008278
- ReraGenie IDRG-MH-19840
Builder
- NameAbhaysinh Dhadve Patil Constructions Private Limited
- Entity typeCompany
- Managing DirectorAbhaysinh Dinkarrao Dhadve Patil
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Aug 2017
- Promised completion30 Jun 2019
- Revised completionNone
- Buildings2 building records
- Documents filed48 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 3 | 0 | 0 | 0 | 0 |
| Building B | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 3 Oct 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
Building A88%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Building B88%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 3 Oct 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building A | 1 | 1 |
| Building B | 1 | 1 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Kishor Patil | Pune (M Corp.) | Pune |
| Nita Kishor Patil | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M. B. Chaudhary |
| Partner | Role in project |
|---|---|
| Abhaysinh Dhadve Patil Constructions Private Limited | - |
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000157277 | Sushama Sagar Patil | Abhaysinh Dhadve Patil | 30/06/2022 |
| CC005000000157278 | Sagar Ashok Aher | Abhaysinh Dhadve Patil | 30/06/2022 |
| CC005000000157280 | Nikhil Subash Durge | Abhaysinh Dhadve Patil | 30/06/2022 |
| CC005000000157281 | Vandana Amol Shinde | Abhaysinh Dhadve Patil | 30/06/2022 |
| CC005000000157282 | Viranchi Sahebrao Kande | Abhaysinh Dhadve Patil | 30/06/2022 |
| CC005000000157285 | Pradeep Gangaram Palande | Abhaysinh Dhadve Patil | 01/07/2022 |
| CC005000000157284 | Smital Prasenjeet Patil | Abhaysinh Dhadve Patil | 01/07/2022 |
| CC005000000167514 | KISHOR JAGNNATH PATIL | ABHAYSINH DHADVE PATIL CONSTRUCTION PVT. LTD. | 30/08/2022 |
| CC005000000167516 | ASHA VASANT CHOUDHARY | ABHAYSINH DHADVE PATIL CONSTRUCTIONS PVT LTD | 30/08/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Oct 2019
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Blue Bell Completion Certificate Received From Pune Municipal Corporation (1).pdf | 3 Oct 2019 |
| Certificates of CA (Form 3)File: Blue Bell Form 3 C.pdf | 25 Sep 2019 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate 100 work completion 001.pdf | 23 Sep 2019 |
| OtherFile: Pune Municipal Corporation application for completion certificate of Project Blue Bell.pdf | 23 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1.pdf | 9 Jul 2019 |
| Certificates of CA (Form 3)File: Form-3_compressed.pdf | 9 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 29 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 29 Mar 2019 |
| Certificates of CA (Form 3)File: ilovepdf_merged.pdf | 29 Mar 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 18 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 18 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 18 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 18 Dec 2018 |
| Certificates of CA (Form 3)File: Q1 Form 3.pdf | 18 Dec 2018 |
| Certificates of CA (Form 3)File: Q2 Form 3.pdf | 18 Dec 2018 |
| Certificates of CA (Form 5)File: Form 5 - P52100008278.pdf | 25 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf | 12 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf | 12 Jul 2018 |
| Certificates of CA (Form 3)File: CA Certificate Form 3.pdf | 12 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITRCTS.pdf | 30 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 30 Mar 2018 |
| Certificates of CA (Form 3)File: CA Certificate-ilovepdf-compressed.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Blue Bell Commencement Latest.pdf | 29 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artitect Certi.pdf | 30 Dec 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf | 30 Dec 2017 |
| Certificates of CA (Form 3)File: Dhadave Patil Form 3.pdf | 30 Dec 2017 |
| Layout approvalFile: Blue Bell Layout 1.pdf | 28 Jul 2017 |
| Layout approvalFile: Blue Bell Layout- 2.pdf | 28 Jul 2017 |
| Layout approvalFile: Blue Bell Layout- 3.pdf | 28 Jul 2017 |
| Building plan approvalFile: Blue Bell Layout 1.pdf | 28 Jul 2017 |
| Building plan approvalFile: Blue Bell Layout- 2.pdf | 28 Jul 2017 |
| Building plan approvalFile: Blue Bell Layout- 3.pdf | 28 Jul 2017 |
| PAN CardFile: Abhaysinh - PAN Card.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Development Agreement Index II Blue Bell.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Encumbrances.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Blue Bell Layout 1.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Blue Bell Layout- 2.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Blue Bell Layout- 3.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Blue Bell Layout 1.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Blue Bell Layout- 2.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Blue Bell Layout- 3.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: Affidavit.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificatecompressed.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-compressed.pdf | 28 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate n.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter (2) n.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: AGREEMENT TO SELL.pdf | 28 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Bhagirathi Heights | 1116D E WARD SHAHUPURI KOLHAPUR | 1 | Completed | Dec 2016 | Late, Feb 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
Keep Blue Bell on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baner13,700+ in Pune
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: Abhaysinh Dhadve Patil Constructions Private Limited
Abhaysinh Dhadve Patil Constructions Private Limited has 1 registration on MahaRERA, including Blue Bell. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Blue Bell is delayed beyond 30 Jun 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Blue Bell?
The registered promoter entity is Abhaysinh Dhadve Patil Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Blue Bell?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Blue Bell?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Blue Bell?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Blue Bell?
The professionals named in the filing: Architect: M. B. Chaudhary. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Blue Bell?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback