Home / Browse projects / Mumbai City, Maharashtra / BLISS
BLISS
By M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd.
RG-MH-89742 · RERA P51900047934 · Last updated on MahaRERA portal: 1 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BLISS is a Residential / Group Housing project by M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd. in Mumbai City, Maharashtra, registered with MahaRERA as P51900047934 on 1 Dec 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 0 of the 13 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameBLISS
- TypeResidential / Group Housing
- Location
- Vivek Singh Road
- Off. Peddar Road
- Malabar Hill Division
- Mumbai City
- 400026
- Pincode400026
- RERA no.P51900047934
- ReraGenie IDRG-MH-89742
Builder
- NameM/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd.
- Entity typeCompany
- DirectorRishab Pradeep Jain
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Dec 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 1 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLISS | NA | 26 | 18 | 13 | 0 | 13 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
BLISS: 92% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 55% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 55% |
| Storm Water Drains | Yes | 65% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BLISS | NA | Rs 12.00 cr | Rs 11.99 cr |
| - | NA | Rs 7.25 cr | Rs 6.51 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gajjar & Associates Consultants Pvt Ltd |
| Engineer | JW Consultants LLP |
| Chartered Accountant | Nehali and co |
| Partner | Role in project |
|---|---|
| M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have submitted an application (RERA Number P51900047934) for the extension of our registration with MAHA RERA, in accordance with the provisions of the RERA Act. requesting an extension for a duration of 31-12-2026. The project has encountered several challenges that have necessitated a revision of our original limeline. This application is made with the intent of extending the registration's validity with MAHA RERA, taking into consideration the best interests of a significant number of allottees involved in the project. The difficulties we have faced have been meticulously a delay in the
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Arch Certificate Bliss March 2026.pdf | 1 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Form 2 Bliss Mar 2026.pdf | 1 Jul 2026 |
| Withdrawal Update Form 3File: CA Certificate Bliss Mar 26.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: Arch Certificate-Bliss _December 2025.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Form 2_Bliss_ - Dec-2025.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: Signed CA Certificate Bliss Dec-25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 1File: Arch Certificate_Bliss - June 2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: Arch Certificate_Bliss_ September-2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Form 2_Bliss_ - Jun 2025 Quarter (1).pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Form 2_Bliss_ - Sept-2025 Quarter.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Signed CA Certificate Bliss june25.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Signed CA Certificate Bliss sept 25.pdf | 30 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bliss Architect Certificate March 2025.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Bliss march25.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 2025 Eng Form 2 - zz consultant.pdf | 21 Apr 2025 |
| Declaration in FORM BFile: Bliss Form b (1).pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5- 22-23 bliss.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5- 23-24.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate Bliss Dec 24.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - bliss Engineer Certificate dec 2024.pdf | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: bliss - inventory disclosure format.pdf | 13 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_ Bliss 22-23.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 20 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 20 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 20 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 5 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 5 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 5 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 5 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: BLISS FORM 2A.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 23 Q4.pdf | 19 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 23 Q4.pdf | 19 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q4.pdf | 19 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bliss Architect Certificate Sept 2023_.pdf | 22 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BLISS Engineer Form 2 _ 2nd Quarter.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLISS Signed CA Certificate sept 23.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Bliss (1).pdf | 8 Nov 2022 |
| Proforma of Agreement for saleFile: Model form of Sale Agreement RERA_Updated.pdf | 8 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS LETTER.pdf | 8 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report to Allotment letter.pdf | 5 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report to model copy of Agreement.pdf | 5 Oct 2022 |
| Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf | 20 Sep 2022 |
| Copy of the legal title reportFile: Title Report_compressed.pdf | 25 Aug 2022 |
| Layout approvalFile: BLISS Approved Plan 1.pdf | 4 Aug 2022 |
| Layout approvalFile: BLISS Approved Plan 2.pdf | 4 Aug 2022 |
| Layout approvalFile: BLISS Approved Plan 3.pdf | 4 Aug 2022 |
| Layout approvalFile: BLISS Approved Plan 4.pdf | 4 Aug 2022 |
| Layout approvalFile: BLISS Approved Plan 5.pdf | 4 Aug 2022 |
| Layout approvalFile: BLISS Approved Plan 6.pdf | 4 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 1.pdf | 4 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 2.pdf | 4 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 3.pdf | 4 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 4.pdf | 4 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 5.pdf | 4 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 6.pdf | 4 Aug 2022 |
| Declaration in FORM BFile: Form B PG2.pdf | 4 Aug 2022 |
| Declaration in FORM BFile: Form B PG3.pdf | 4 Aug 2022 |
| Details of encumbrances concerned to LegalFile: download.pdf | 25 Jul 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certififcate.pdf | 25 Jul 2022 |
| CERSAI detailsFile: CERSAI Undertaking.pdf | 25 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Form1.pdf | 19 Jul 2022 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate by Developer.pdf | 11 Jul 2022 |
| Declaration in FORM BFile: Form B PG1.pdf | 11 Jul 2022 |
| Building plan approvalFile: Building Plan Approval Amendletter_signed Bliss.pdf | 17 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval Amendletter_signed Bliss.pdf | 17 Jun 2022 |
| PAN CardFile: PAN CARD Euphrosyne.pdf | 14 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth CC_ Bliss.pdf | 14 Jun 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BELLAGIO | Jacob Circle Saat Rasta Mumbai | 93 | Completed | Dec 2023 | Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BLISS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Malabar Hill Division780+ in Mumbai City
Miami By Purva
Puravankara Limited
Kalpataru Prive
Kalpataru Hills Residency Private Limited
Palazzo
Livstone Estates LLP
Echjay House
E House Realty Private Limited
Godrej Carmichael
Godrej Properties Limited
ARKADE RISE
Arkade Paradigm
See every Mumbai City project, with the district possession charts
Builder: M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd.
M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd. has 1 registration on MahaRERA, including BLISS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if BLISS is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BLISS?
The registered promoter entity is M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BLISS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BLISS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BLISS?
The professionals named in the filing: Architect: Gajjar & Associates Consultants Pvt Ltd; Engineer: JW Consultants LLP; Chartered Accountant: Nehali and co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BLISS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback