Home / Browse projects / Mumbai City, Maharashtra / BLISS

Registered No litigation declared Residential / Group Housing project

BLISS

By M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd.

RG-MH-89742 · RERA P51900047934 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
7 of 11Construction stages donefurthest along: Internal walls, 95%
13 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

BLISS is a Residential / Group Housing project by M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd. in Mumbai City, Maharashtra, registered with MahaRERA as P51900047934 on 1 Dec 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 0 of the 13 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameBLISS
  • TypeResidential / Group Housing
  • Location
    • Vivek Singh Road
    • Off. Peddar Road
    • Malabar Hill Division
    • Mumbai City
    • 400026
  • Pincode400026
  • RERA no.P51900047934
  • ReraGenie IDRG-MH-89742

Builder

  • NameM/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd.
  • Entity typeCompany
  • DirectorRishab Pradeep Jain
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2022First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed71 files

Current status

0%0 of 13 units booked
96.1%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLISSNA261813013

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

BLISS: 92% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes55%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area522 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Dec 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2008.88
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Industry House Opp Ramon House 159 H T Parekh Marg Churchgate Mumbai 400 020
Estimated costRs 19.25 cr
Cost incurredRs 18.50 cr
Work done96.11%
BuildingWingEstimatedIncurred
BLISSNARs 12.00 crRs 11.99 cr
-NARs 7.25 crRs 6.51 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGajjar & Associates Consultants Pvt Ltd
EngineerJW Consultants LLP
Chartered AccountantNehali and co
PartnerRole in project
M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900027705Dec 2024 → Dec 2026

Reason as filed by the promoterWe have submitted an application (RERA Number P51900047934) for the extension of our registration with MAHA RERA, in accordance with the provisions of the RERA Act. requesting an extension for a duration of 31-12-2026. The project has encountered several challenges that have necessitated a revision of our original limeline. This application is made with the intent of extending the registration's validity with MAHA RERA, taking into consideration the best interests of a significant number of allottees involved in the project. The difficulties we have faced have been meticulously a delay in the

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch Certificate Bliss March 2026.pdf1 Jul 2026
Withdrawal Update Form 2File: Engineer Form 2 Bliss Mar 2026.pdf1 Jul 2026
Withdrawal Update Form 3File: CA Certificate Bliss Mar 26.pdf1 Jul 2026
Withdrawal Update Form 1File: Arch Certificate-Bliss _December 2025.pdf7 Feb 2026
Withdrawal Update Form 2File: Engineer Form 2_Bliss_ - Dec-2025.pdf7 Feb 2026
Withdrawal Update Form 3File: Signed CA Certificate Bliss Dec-25.pdf7 Feb 2026
Withdrawal Update Form 1File: Arch Certificate_Bliss - June 2025.pdf30 Dec 2025
Withdrawal Update Form 1File: Arch Certificate_Bliss_ September-2025.pdf30 Dec 2025
Withdrawal Update Form 2File: Engineer Form 2_Bliss_ - Jun 2025 Quarter (1).pdf30 Dec 2025
Withdrawal Update Form 2File: Engineer Form 2_Bliss_ - Sept-2025 Quarter.pdf30 Dec 2025
Withdrawal Update Form 3File: Signed CA Certificate Bliss june25.pdf30 Dec 2025
Withdrawal Update Form 3File: Signed CA Certificate Bliss sept 25.pdf30 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bliss Architect Certificate March 2025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Bliss march25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 2025 Eng Form 2 - zz consultant.pdf21 Apr 2025
Declaration in FORM BFile: Bliss Form b (1).pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf27 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5- 22-23 bliss.pdf27 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5- 23-24.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate Bliss Dec 24.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - bliss Engineer Certificate dec 2024.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: bliss - inventory disclosure format.pdf13 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_ Bliss 22-23.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf5 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf5 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: BLISS FORM 2A.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 23 Q4.pdf19 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 23 Q4.pdf19 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q4.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bliss Architect Certificate Sept 2023_.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BLISS Engineer Form 2 _ 2nd Quarter.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLISS Signed CA Certificate sept 23.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Bliss (1).pdf8 Nov 2022
Proforma of Agreement for saleFile: Model form of Sale Agreement RERA_Updated.pdf8 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS LETTER.pdf8 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation Report to Allotment letter.pdf5 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report to model copy of Agreement.pdf5 Oct 2022
Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf20 Sep 2022
Copy of the legal title reportFile: Title Report_compressed.pdf25 Aug 2022
Layout approvalFile: BLISS Approved Plan 1.pdf4 Aug 2022
Layout approvalFile: BLISS Approved Plan 2.pdf4 Aug 2022
Layout approvalFile: BLISS Approved Plan 3.pdf4 Aug 2022
Layout approvalFile: BLISS Approved Plan 4.pdf4 Aug 2022
Layout approvalFile: BLISS Approved Plan 5.pdf4 Aug 2022
Layout approvalFile: BLISS Approved Plan 6.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 1.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 2.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 3.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 4.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 5.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: BLISS Approved Plan 6.pdf4 Aug 2022
Declaration in FORM BFile: Form B PG2.pdf4 Aug 2022
Declaration in FORM BFile: Form B PG3.pdf4 Aug 2022
Details of encumbrances concerned to LegalFile: download.pdf25 Jul 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certififcate.pdf25 Jul 2022
CERSAI detailsFile: CERSAI Undertaking.pdf25 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Form1.pdf19 Jul 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate by Developer.pdf11 Jul 2022
Declaration in FORM BFile: Form B PG1.pdf11 Jul 2022
Building plan approvalFile: Building Plan Approval Amendletter_signed Bliss.pdf17 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval Amendletter_signed Bliss.pdf17 Jun 2022
PAN CardFile: PAN CARD Euphrosyne.pdf14 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC_ Bliss.pdf14 Jun 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
BELLAGIOJacob Circle Saat Rasta Mumbai93CompletedDec 2023Dec 2023

How this compares with Mumbai City

0%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 24 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BLISS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malabar Hill Division780+ in Mumbai City

Builder: M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd.

M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd. has 1 registration on MahaRERA, including BLISS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if BLISS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BLISS?

The registered promoter entity is M/s. Euphrosyne Infrastructure (OPC) Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BLISS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BLISS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BLISS?

The professionals named in the filing: Architect: Gajjar & Associates Consultants Pvt Ltd; Engineer: JW Consultants LLP; Chartered Accountant: Nehali and co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BLISS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BLISS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BLISS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.