Birla Vanya - Phase 1

By Century Textiles & Industries Ltd

RG-MH-42491 · RERA P51700019178 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
40 of 44Construction stages doneacross 5 buildings; furthest along: Sanitary Fittings within the flats /..., 93%
1 of 1Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 216 documents Report an error

Birla Vanya - Phase 1 is a Mixed project by Century Textiles & Industries Ltd in Thane, Maharashtra, registered with MahaRERA as P51700019178 on 9 Jan 2019. The registration is recorded completed; possession was promised by 30 Jun 2025. 0 of the 1 unit on this registration is recorded sold or booked, and 40 of 44 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NameBirla Vanya - Phase 1
  • TypeMixed
  • Location
    • Kalyan Murbad Road
    • Shahad
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421103
  • Pincode421103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700019178
  • ReraGenie IDRG-MH-42491

Builder

  • NameCentury Textiles & Industries Ltd
  • Entity typeCompany
  • CINL17120MH1897PLC000163
  • GSTIN27AAACC2659Q1Z6
  • DirectorKarat Tazhtetil Jithendran
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2019PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Jan 2019
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed216 files

Current status

0%0 of 1 units booked

Figures as on 19 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Avishi - Tower ANA400000
Aaral - Tower BNA400000
Anila - Tower FNA400000
Ashmi - Tower GNA400000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 93%.

Avishi - Tower A99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises91%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Aaral - Tower B99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Anila - Tower F99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Ashmi - Tower G99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes82%
Storm Water DrainsYes64%
Landscaping & Tree PlantingYes35%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes98%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes68%
Energy managemcntYes79%
Fire protection and fire safety requirementsYes92%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Club HouseYes30%

Parking filed733

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots733
Closed/Covered733
BuildingClosed/CoveredTotal
Avishi - Tower A153153
Aaral - Tower B232232
Anila - Tower F195195
Ashmi - Tower G153153

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area85,220 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Birla Estates Pvt. Ltd.Mumbai CityMumbai City

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI53468.31
Proposed, not sanctioned37,783 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch386 Veer Savarkar Marg Opp Siddhivinayak Temple, Prabhadevi Mumbai - 400025

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Aditya Birla Real Estate Limited-

Litigation declared1

CaseCourtStatus
6523/2019Bombay High CourtPre Admission

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000141163Girish A ShivnaniBIRLA ESTATES PRIVATE LIMITED05/10/2019
CC006000000193482Jyoti Ahuja and Umesh AhujaBirla Estate Private Limited18/07/2020
CC0060000001986411. Savio Ramesh Kale 2. Leena Ramesh Kale 3. Rohan Clint Savio KaleBirla Estate Prvivate Limited13/01/2022
CC006000000303051Birla Estates Private LimitedAnand Madanlal Khatwani and Muskan Anand Khatwani18/10/2022
CC006000000303318Birla Estates Private LimitedMohammed Amin18/11/2022
CC006000000591200HARESH TARACHAND AHUJABIRLA ESTATES16/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Apr 2025

Documents filed216

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 216 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked inventory phase 1.pdf19 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ilovepdf_merged (54)-compressed (1).pdf11 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for18 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vanya - Form 2 -Ph1.pdf20 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Vanya - Form 2A-Ph1.pdf20 Aug 2024
Home Buyer /Allottee Grievance Redressal CellFile: Vanya phase 1 Grievance redressal officer.pdf20 Aug 2024
Certificates of CA (Form 3)File: BV_P1_202406_CA.pdf20 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BV_P-I_OC.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: BV_P1_202309_Sold.pdf19 Jun 2024
Disclosure of sold/ booked inventoryFile: BV_P1_202312_Sold.pdf19 Jun 2024
Disclosure of sold/ booked inventoryFile: BV_P1_202403_Sold.pdf19 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202403_Er.pdf21 Apr 2024
Certificates of CA (Form 3)File: BV_P1_202403_CA.pdf21 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BV_P1_202312_Ar.pdf14 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202312_Er.pdf14 Mar 2024
Certificates of CA (Form 3)File: BV_P1_202312_CA.pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BV_P1_202309_Ar.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202309_Er.pdf20 Oct 2023
Certificates of CA (Form 3)File: BV_P1_202309_CA.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: BV-P1_202306_Sold.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final Form -5-Birla Vanya Phase-1.pdf29 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BV_P1_202306_Ar.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202306_Er.pdf19 Jul 2023
Certificates of CA (Form 3)File: BV_P1_202306_CA.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: BV_P1_Form 2A_2022-23.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: 202306_Encumbrance Declartion Phase 1.pdf16 Jun 2023
Details of encumbrances concerned to LegalFile: 202306_Encumbrance Declartion Phase 1.pdf16 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BV_P1_202303_Ar.pdf1 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202303_Er.pdf1 May 2023
Disclosure of sold/ booked inventoryFile: BV_P1_202303_Sold.pdf1 May 2023
Certificates of CA (Form 3)File: BV_P1_202303_CA.pdf1 May 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf9 Mar 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf9 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest KTJ.pdf9 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest NCJ.pdf9 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf9 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202112_BV_P1_Ar.pdf10 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202112_BV_P1_Er.pdf10 Feb 2023
Form 2AFile: 202112_BV_P1_Form-2A.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5_2018-19.pdf10 Feb 2023
Certificates of CA (Form 3)File: 202006_BV_P1_CA_1.pdf3 Feb 2023
Certificates of CA (Form 3)File: 202006_BV_P1_CA_2.pdf3 Feb 2023
Certificates of CA (Form 3)File: 202009_BV_P1_CA_1.pdf3 Feb 2023
Certificates of CA (Form 3)File: 202009_BV_P1_CA_2.pdf3 Feb 2023
Certificates of CA (Form 3)File: 202112_BV_P1_CA.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202212_Er.pdf1 Feb 2023
Disclosure of sold/ booked inventoryFile: BV_P1_202212_Sold.pdf1 Feb 2023
Certificates of CA (Form 3)File: BV_P1_202212_CA.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BV_P1_202212_Ar.pdf19 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202209_Er.pdf29 Dec 2022
Certificates of CA (Form 3)File: BV_P1_202209_CA-1.pdf29 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BV_P1_202206_Ar.pdf28 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BV_P1_202209_Ar.pdf28 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202209_Er.pdf28 Nov 2022
Disclosure of sold/ booked inventoryFile: BV_P1_202209_Sold.pdf28 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202206_Er.pdf7 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: BV_P1_Form 2A_2021-22.pdf7 Nov 2022
Disclosure of sold/ booked inventoryFile: BV_P1_202206_Sold Inventory.pdf7 Nov 2022
Certificates of CA (Form 3)File: BV_P1_202203_CA.pdf7 Nov 2022
Certificates of CA (Form 3)File: BV_P1_202206_CA.pdf7 Nov 2022
Certificates of CA (Form 3)File: BV_P1_202209_CA.pdf7 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Birla Vanya- Phase 1-Form 5.pdf7 Nov 2022
Layout approvalFile: Revised CC Vanya Cover Letter_compressed.pdf27 Jun 2022
Layout approvalFile: Revised Layout_compressed.pdf27 Jun 2022
Copy of Layout Approval (in case of layout)File: Revised CC Vanya Cover Letter_compressed.pdf27 Jun 2022
Copy of Layout Approval (in case of layout)File: Revised Layout_compressed.pdf27 Jun 2022
Proforma of Allotment letterFile: Agreement for Sale - Vanya Phase 1.pdf27 Jun 2022
CERSAI detailsFile: Birla Vanya Phase-I Cersai declaration.pdf18 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BV_P1_202203_Ar.pdf11 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BV_P1_202203_Er.pdf11 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: BV_P1_2020-21_Form 2A.pdf11 May 2022
CERSAI detailsFile: Birla Vanya Phase-I Cersai declaration.pdf11 May 2022
Disclosure of sold/ booked inventoryFile: BV_P1_202203_Sold Inventory.pdf11 May 2022
Disclosure of sold/ booked inventoryFile: BV_P-1 INVENTORY SOLD DATA.pdf3 May 2022
Declaration about Commencement CertificateFile: Birla Vanya Phase 1 Format D.pdf10 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202109_Ar_Ph1.pdf10 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202109_Er_ph1.pdf10 Jan 2022
Form 2AFile: Form 2A- Vanya Phase 1.pdf10 Jan 2022
Certificates of CA (Form 3)File: 202109_CA_Ph1.pdf10 Jan 2022
Copy of the legal title reportFile: Legal Title Report - Century Estates - 250621.pdf7 Dec 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Birla CenturionBirla Centurion Pandurang Budhkar Marg Century Mills Compound Mumbai 40003018CompletedDec 2015Dec 2015
Birla AuroraBirla Aurora Dr Annie Besant Road Worli Mumbai22CompletedApr 2014Apr 2014

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Birla Vanya - Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shahad7,600+ in Thane

2 kmBirla Vanya - Phase 1Completed 44Lapsed / revoked 33Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 153 registered projects within 2 km.

Builder: Century Textiles & Industries Ltd

Century Textiles & Industries Ltd has 2 registrations on MahaRERA, including Birla Vanya - Phase 1 and Birla Vanya Phase 2. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Birla Vanya - Phase 1 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Birla Vanya - Phase 1?

The registered promoter entity is Century Textiles & Industries Ltd, a company as per the filing. Its CIN L17120MH1897PLC000163 and GSTIN 27AAACC2659Q1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Birla Vanya - Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Birla Vanya - Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Birla Vanya - Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Birla Vanya - Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Birla Vanya - Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Birla Vanya - Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.