Red flags

  • Litigation declared, 13 cases
  • 3 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Basement (if any), 0%
252 of 294Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Sunteck Crescent Park -1 is a Residential / Group Housing project by SUNTECK PROPERTY HOLDINGS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700053439 on 31 Oct 2023. Possession is promised by 31 Dec 2029. 42 of the 294 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSunteck Crescent Park -1
  • TypeResidential / Group Housing
  • Location
    • Old Ambivali Road
    • Village Shahad
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421103
  • Pincode421103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053439
  • ReraGenie IDRG-MH-06873

Builder

  • NameSUNTECK PROPERTY HOLDINGS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70102MH2010PTC211484
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsRACHANA HINGARAJIA, Ajeet Singh
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Current status

14%42 of 294 units booked
26.6%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower-1NA42362940294

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Tower-1: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed223

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots223
Closed/Covered223

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area806 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024
LandownerVillageDistrict
Amar Dye Chem Ltd.VileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityKalyan-Dombivli Municipal Corporation
Permissible FSI37369.69
Proposed, not sanctioned29,953 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVile Parle West, Mumbai
Estimated costRs 166.07 cr
Cost incurredRs 44.17 cr
Work done26.6%
BuildingWingEstimatedIncurred
Tower-1NARs 113.57 crRs 18.50 cr
-NARs 52.50 crRs 25.67 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIngrain
EngineerRaju HJ
EngineerRam Sanjiwan
Chartered AccountantN. Somani & Co.
Chartered AccountantWalker Chandiok & Co LLP
Chartered AccountantJhanwar & Maheshwari
Chartered AccountantV.G.KAMAT & ASSOCIATES CHARTERED ACCOUNTANTS
Chartered AccountantBagaria & Co. LLP
PartnerRole in project
SUNTECK PROPERTY HOLDINGS PRIVATE LIMITED-

Litigation declared13

CaseCourtStatus
CA/3304/1998/1998Bombay High CourtOngoing
OLR/153/2012/2012Bombay High CourtOngoing
OLR/357/2013/2013Bombay High CourtOngoing
OLR/296/2013/2013Bombay High CourtClosed
OLR/81/2015/2015Bombay High CourtOngoing
AT/337/2018/2018NCLTOngoing
OLR/272/2019/2019Bombay High CourtClosed
OLR/51/2020/2020Bombay High CourtOngoing
WP/14040/2022/2022Bombay High CourtOngoing
IA/3783/2022/2022Bombay High CourtOngoing
IA/1616/2020/2020Bombay High CourtOngoing
14040 of 2022/2022Bombay High CourtOngoing
2023Bombay High CourtOngoing

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000429155NILESH GOVINDRAO WANJARISunteck Property Holdings Private Ltd.07/02/2024
CC006000000479787Mamta Ram MotwaniM/S. SUNTECK PROPERTY HOLDINGS PVT. LTD.28/03/2024
CC12400081SUDHAKASUDHAKAR LAL SRIVASTAVASUNTECK PROPERTY HOLDINGS PRIVATE LIMITED12/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE SCP-1_Mar-26.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEER CERTIFICATE SCP 1_Mar-26.pdf4 May 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE SCP 1_Mar-26.pdf4 May 2026
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE SCP-1_Dec-25.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 ENGINEER CERTIFICATE SCP 1_Dec-25.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE SCP 1_Dec-25.pdf9 Feb 2026
Form 2A (FY 2024-2025)File: 2025 03 Annexure C-Form 2A-ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE SCP1.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE SCP-1_Sep-25.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate SCP 1_Sep-25.pdf3 Nov 2025
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE SCP 1_Sep-25.pdf3 Nov 2025
Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE SCP-1_Sep-25.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate SCP 1_Sep-25.pdf29 Oct 2025
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE SCP 1_June-25_New.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: 2024-25_Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Crescent Park 1_2024-25.pdf3 Sep 2025
Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE SCP-1_June-25.pdf1 Aug 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate SCP 1_June-25.pdf1 Aug 2025
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE SCP 1_June-25_New.pdf1 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE SCP-1_Mar-25.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SCP 1_Mar-25.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate SCP 1_Mar-25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A-Form 1- Architect Certificate SCP-1_Jan-25.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D-FORM 3-CA Certificate SCP 1_Jan-25.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B Form 2 Engineer Certificate SCP 1_Jan-25.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A-Form 1- Architect Certificate SCP-1_Oct-24.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D-FORM 3-CA Certificate SCP 1_Oct-24.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B Form 2 Engineer Certificate SCP 1 Oct 24.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Crescent Park 1_2023-24 Signed.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Crescent Park 1_2023-24 Signed.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A-Form 1- Architect Certificate SCP-1_June-24.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B-Form 2-Engineer Certificate SCP-1_June-24.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D-FORM 3-CA Certificate SCP 1_June-24.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A-Form 1- Architect Certificate SCP-1_Mar-24.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B-Form 2-Engineer Certificate SCP-1_Mar-24.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2024 03 Annexure C-Form 2A-ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE SCP1.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D-FORM 3-CA Certificate SCP 1_Mar-24.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure D-FORM 3-CA Certificate SCP 1_Jan-24 Compress.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A-Form 1- Architect Certificate SCP-1_Jan-24.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B-Form 2-Engineer Certificate SCP-1_Jan-24.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D-FORM 3-CA Certificate SCP 1_Jan-24 Compress.pdf22 Jan 2024
Copy of the legal title reportFile: Supplemental Memo on Title-RERA Format 241123.pdf27 Nov 2023
Building plan approvalFile: sheet no6.pdf26 Oct 2023
Building plan approvalFile: sheet no9.pdf26 Oct 2023
Building plan approvalFile: sheet no10 .pdf26 Oct 2023
Building plan approvalFile: sheet no11.pdf26 Oct 2023
Building plan approvalFile: sheet no18.pdf26 Oct 2023
Building plan approvalFile: sheet no19.pdf26 Oct 2023
Building plan approvalFile: sheet no20.pdf26 Oct 2023
Building plan approvalFile: sheet no21 Compress.pdf26 Oct 2023
Copy of the legal title reportFile: Title Report 251023 1of 2.pdf26 Oct 2023
Copy of the legal title reportFile: Title Report 251023 Annexure.pdf26 Oct 2023
Copy of the legal title reportFile: LITIGATION SEARCH REPORT.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: Litigation Declaration SCP1 261023.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: Litigation Declaration SCP1 261023.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet no6.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet no9.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet no10 .pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet no11.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet no18.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet no19.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet no20.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet no21 Compress.pdf26 Oct 2023
Proforma of Agreement for saleFile: 25 10 23 AFS REVISED CLEAN.pdf26 Oct 2023
Other - LegalFile: 25102023 AFS DEVIATION REPORT Signed.pdf26 Oct 2023
Other - LegalFile: DECLARATION S No and CTS No 251023 SCP1.pdf26 Oct 2023
Other - LegalFile: Form B- Affidavit cum-Declaration Pramoter SCP1 261023.pdf26 Oct 2023
Other - FinanceFile: Annexure D-FORM 3-CA Certificate SCP 1 261023 Compress.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Finance SCP 1 23 10 2023.pdf23 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Finance SCP 1 23 10 2023.pdf23 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B-Form 2-Engineer Certificate SCP-1 Sameer Revised.pdf23 Oct 2023
CERSAI detailsFile: Encumbrance Certificate Finance SCP 1 23 10 2023.pdf23 Oct 2023
Building plan approvalFile: Commencement Certificate.pdf21 Oct 2023
Building plan approvalFile: sheet no 03 H compressed.pdf21 Oct 2023
Building plan approvalFile: sheet no 05 H.pdf21 Oct 2023
Building plan approvalFile: sheet no 08H.pdf21 Oct 2023
Building plan approvalFile: sheet no 08H.pdf21 Oct 2023
Building plan approvalFile: sheet no 12H.pdf21 Oct 2023
Building plan approvalFile: sheet no 13 H.pdf21 Oct 2023
Building plan approvalFile: sheet no 22 H.pdf21 Oct 2023
Building plan approvalFile: sheet no 27 H.pdf21 Oct 2023

How this compares with Thane

14%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck Crescent Park -1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Shahad7,600+ in Thane

2 kmSunteck Crescent Park -1Completed 39Lapsed / revoked 51Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 150 registered projects within 2 km.

Builder: SUNTECK PROPERTY HOLDINGS PRIVATE LIMITED

SUNTECK PROPERTY HOLDINGS PRIVATE LIMITED has 2 registrations on MahaRERA, including Sunteck Crescent Park -1 and Sunteck Crescent Park -2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sunteck Crescent Park -1 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck Crescent Park -1?

The registered promoter entity is SUNTECK PROPERTY HOLDINGS PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2010PTC211484 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck Crescent Park -1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sunteck Crescent Park -1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sunteck Crescent Park -1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck Crescent Park -1?

The professionals named in the filing: Architect: Ingrain; Engineer: Raju HJ; Engineer: Ram Sanjiwan; Chartered Accountant: N. Somani & Co.; Chartered Accountant: Walker Chandiok & Co LLP; Chartered Accountant: Jhanwar & Maheshwari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck Crescent Park -1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck Crescent Park -1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck Crescent Park -1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.