Home / Browse projects / Thane, Maharashtra / VISHWAJEET PRECIOUS PHASE IV

Registered No litigation declared Others project

VISHWAJEET PRECIOUS PHASE IV

By ABHIJEET CONSTRUCTION

RG-MH-05958 · RERA P51700051424 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 95%
131 of 302Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

VISHWAJEET PRECIOUS PHASE IV is a Others project by ABHIJEET CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700051424 on 14 Jun 2023. Possession is promised by 30 Mar 2028. 171 of the 302 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameVISHWAJEET PRECIOUS PHASE IV
  • TypeOthers
  • Location
    • VARAP
    • Kalyan
    • Thane
    • 421103
  • Pincode421103
  • RERA no.P51700051424
  • ReraGenie IDRG-MH-05958

Builder

  • NameABHIJEET CONSTRUCTION
  • Entity typePartnership
  • PartnersVISHWAJEET GULABRAO KARANJULE PATIL, ABHIJEET GULABRAO KARANJULE PATIL, RAVI BHAJANLAL MATTA, SAHIL MAHESH MATTA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJun 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2023
  • Promised completion30 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Current status

57%171 of 302 units booked
65.5%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PEARLNA181728220302

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

PEARL: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed286

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots286
Closed/Covered96
Open Space190

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,847 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jul 2025
LandownerVillageDistrict
LALJI MEGHJI PATELKalyan-Dombivali (M Corp.)Thane
RAVINDRA KAUTIK TAYDEKalyan-Dombivali (M Corp.)Thane

Approvals and building plan

Sanctioning authorityASSISTANT DIRECTOR TOWN PLANNING, THANE
Permissible FSI19083.02
Proposed, not sanctioned19,083 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3039GROUND FLOOR SWANAND SHOPPING COMPLEX B CABIN ROADSHIVAJI CHOWK AMBARNATH EAST) PIN 421501
Estimated costRs 53.27 cr
Cost incurredRs 34.88 cr
Work done65.47%
BuildingWingEstimatedIncurred
PEARLNARs 46.50 crRs 34.88 cr
-NARs 6.76 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURAJ ANDHARE
EngineerM NANDWANI
EngineerSHOBHNATH RAO
Chartered AccountantMAYUR K JAIN AND CO
Chartered AccountantK M R B AND ASSOCIATES LLP
Chartered AccountantVijesh I. Jaisinghani
PartnerRole in project
ABHIJEET CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jan 2025

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1-V PRECIOUS PHASE IV-31-03-26.pdf9 Jun 2026
Withdrawal Update Form 2File: FORM 2-V PRECIOUS PHASE IV-31-03-2026.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 Vishwajeet Precious Phase IV 31-03-2026.pdf9 Jun 2026
Withdrawal Update Form 1File: FORM 1 V PRECIOUS PHASE IV 31 12 25.pdf9 Mar 2026
Withdrawal Update Form 2File: FORM 2-V PRECIOUS PHASE IV 31 12 2025.pdf9 Mar 2026
Withdrawal Update Form 3File: Form 3 Vishwajeet Precious Phase IV 3112 25 Signed.pdf9 Mar 2026
Withdrawal Update Form 1File: FORM 1 AC PHASE IV 30 09 25.pdf7 Feb 2026
Withdrawal Update Form 2File: FORM 2 V PRECIOUS PHASE IV 30 09 2025.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3 AC V PRECIOUS PHASE IV 30 09 2025.pdf7 Feb 2026
Withdrawal Update Form 1File: FORM-1-AC-PHASE IV-30-06-25.pdf24 Dec 2025
Withdrawal Update Form 2File: FORM-2-AC-PHASE IV-30-06-25.pdf24 Dec 2025
Withdrawal Update Form 3File: FORM-3 -AC-PHASE IV-30-06-25.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: V PRECIOUS-PHASE IV-FORM-5-FY-24-25.pdf29 Sep 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-AC-PHASE IV -31-03-25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 -AC-PHASE IV-31-03-25.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 -AC-PHASE IV-31-03-25.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-AC-PHASE IV-31-03-25.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: V PRECIOUS PHASE IV-UNSOLD-31-03-25.pdf13 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-AC-PHASE-IV-31-03-25.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-V PRECIOUS PH-IV-31-12-24.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: UNSOLD-V PRECIOUS -IV-31-12-24.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-AC-PHASE IV-31-12-24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-AC-PHASE IV-31-12-24.pdf14 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-AC-V PRECIOUS-PHASE IV-31-12-24.pdf14 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shop O C A Construction Varap- Part OC.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-AC-PHASE IV-30-09-24.pdf8 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5-AC-V PRECIOUS- IV- FY 23-24.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-AC-PHASE-IV-30-09-24.pdf23 Oct 2024
Details of encumbrances concerned to FinanceFile: AC-PHASE IV-MORGAGE ENCUMBRANCES.pdf21 Oct 2024
Details of encumbrances concerned to FinanceFile: AC-PHASE IV-MORGAGE ENCUMBRANCES.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: UNSOLD-V PRECIOUS-IV-30-09-2024.pdf21 Oct 2024
Details of encumbrances concerned to LegalFile: AC-PHASE IV-MORGAGE ENCUMBRANCES.pdf21 Oct 2024
Details of encumbrances concerned to LegalFile: AC-PHASE IV-MORGAGE ENCUMBRANCES.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-AC-PHASE IV-30-09-24.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V PRECIOUS-PHASE IV-30-09-24.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V PRECIOUS PHASE IV-30-06-24.pdf18 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V PRECIOUS-PHASE IV-30-06-24.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-V PRECIOUS PHASE IV-30-06-24.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: V PRECIOUS-PHASE-IV-UNSOLD-30-06-24.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-AC-PHASE-IV-30-06-24.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-AC-PHASE IV-30-06-24.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-AC-PHASE IV-31-03-24.pdf5 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-AC-PRECIOUS PHASE IV-31-03-24.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-AC-PHASE IV-31-03-24.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AC-PHASE IV-FORM-2A-31-03-24.pdf1 May 2024
Disclosure of sold/ booked inventoryFile: AC-V PRECIOUS PHASEIV-UNSOLD-31-03-24.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-AC-V PRECIOUS-PHASE-IV-31-12-23.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V PRECIOUS PHASE IV-31-12-23.pdf16 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A-AC-VP PHASE IV-31-12-23.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: AC-PHASE IV- UNSOLD-31-12-23.pdf12 Feb 2024
Other - LegalFile: Apartment deed-AC-phase IV.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-AC-PHASE IV-26-12-23_compressed.pdf27 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: AC-PHASE IV-FORMAT A.pdf27 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-AC-PHASE IV-30-09-23.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-AC-phase IV-30-09-23.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: UNSOLD-V PRECIOUSE PHASE IV-30-09-23.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V PRECIOUS PHASE IV-30-09-2023.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V PRECIOUS PHASE IV-30-09-23.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AP-IV-30-09-23.pdf17 Oct 2023
Details of encumbrances concerned to FinanceFile: DECL-FINACIAL ENCUMBRANCES.pdf6 Jun 2023
Details of encumbrances concerned to FinanceFile: DECL-LEGAL ENCUMBRANCES.pdf6 Jun 2023
Details of encumbrances concerned to LegalFile: DECL-FINACIAL ENCUMBRANCES.pdf6 Jun 2023
Details of encumbrances concerned to LegalFile: DECL-LEGAL ENCUMBRANCES.pdf6 Jun 2023
CERSAI detailsFile: DECL-NO CERSAI.pdf6 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Abhijeet Construction (1).pdf6 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: C C Varap- A- Construction.pdf25 May 2023
Declaration in FORM BFile: FORM-B-GBK.pdf25 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200269701923_For_Asset_Based_Search_25_05_2023_16_37_05_718.pdf25 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf25 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A-GBK.pdf25 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A-AGK.pdf25 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A-VGK.pdf25 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A-RAVI MATTA (1).pdf25 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A-SAHIL MATTA.pdf25 May 2023
Layout approvalFile: 1.PDF24 May 2023
Layout approvalFile: 2.PDF24 May 2023
Layout approvalFile: 3.PDF24 May 2023
Layout approvalFile: 4.PDF24 May 2023
Layout approvalFile: 4.PDF24 May 2023
Building plan approvalFile: 1.PDF24 May 2023

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHWAJEET PRECIOUS PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VARAP7,600+ in Thane

Builder: ABHIJEET CONSTRUCTION

ABHIJEET CONSTRUCTION has 2 registrations on MahaRERA, including VISHWAJEET PINK CITY NX and VISHWAJEET PRECIOUS PHASE IV. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VISHWAJEET PRECIOUS PHASE IV is delayed beyond 30 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWAJEET PRECIOUS PHASE IV?

The registered promoter entity is ABHIJEET CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWAJEET PRECIOUS PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHWAJEET PRECIOUS PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWAJEET PRECIOUS PHASE IV?

The professionals named in the filing: Architect: SURAJ ANDHARE; Engineer: M NANDWANI; Engineer: SHOBHNATH RAO; Chartered Accountant: MAYUR K JAIN AND CO; Chartered Accountant: K M R B AND ASSOCIATES LLP; Chartered Accountant: Vijesh I. Jaisinghani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWAJEET PRECIOUS PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWAJEET PRECIOUS PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWAJEET PRECIOUS PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.