Home / Browse projects / Dakshina Kannada, Karnataka / BIMBIS
BIMBIS
By SHREE VIGNESHWARA DEVELOPERS
RG-KA-14930 · RERA PRM/KA/RERA/1257/334/PR/141022/005321 · Last updated on RERA Karnataka portal: 11 Oct 2022
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
BIMBIS is a Mixed Development project by SHREE VIGNESHWARA DEVELOPERS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/141022/005321 on 14 Oct 2022. Possession is promised by 15 Jan 2025.
At a glance
Project
- NameBIMBIS
- TypeMixed Development
- Location
- Mangalore
- Dakshina Kannada
- 575006
- Pincode575006
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/141022/005321
- ReraGenie IDRG-KA-14930
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on14 Oct 2022
- Promised completion15 Jan 2025
- Revised completionNone
- Buildings1 building record
- Documents filed116 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bimbis | - | - | - | - | - | 46 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 11 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 11 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | Yes | - |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shree Vigneshwara Developers Partner Deviprasad Rai | - | - |
| Varadaraj Mangalore | - | - |
| Seema Varadaraj | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 9.63 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Krishna Shetty |
| Engineer | Krishna Shetty |
| Chartered Accountant | M Jagannath Kamath & Co Ptr CA Karthikeya D Shenoy |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed116
As listed on the registration, under the names the promoter filed them with; the newest 80 of 116 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/141022/005321 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Supplementary Partnership Deed dt 11 10 2022File: Supplementary Partnership Deed.pdf | 11 Oct 2022 |
| Erstwhile Partnership DeedFile: Firm Partnership deed.pdf | 11 Oct 2022 |
| 1) rtc and MRFile: 1 rtc & mr.pdf | 30 Sep 2022 |
| 2)jdaFile: 2 In lieu of JDA_compressed.pdf | 30 Sep 2022 |
| 3)gazette copy or certified copy for guidence valueFile: 3 Gazette Copy Guidance Value.pdf | 30 Sep 2022 |
| 4) Sale Deed GPA and Partition DeedFile: 4 Sale Deed GPA Partition Deed.pdf | 30 Sep 2022 |
| I 1 Invalid UDIN mentioned for 2019-20 please update correct one. - ClarificationFile: I 1a UDIN.pdf | 13 Sep 2022 |
| I 1 Invalid UDIN mentioned for 2019-20 please update correct one. - Audit Report with Correct UDINFile: I 1b Audit Report.pdf | 13 Sep 2022 |
| I 1 Invalid UDIN mentioned for 2019-20 please update correct one. - UDIN Verification ReportFile: I 1c UDIN.pdf | 13 Sep 2022 |
| II 1)need rtc at the time of conversion 2)need MR mentioned in rtc before conversion - ClarificationFile: II 1 and 2 RTC and MR.pdf | 13 Sep 2022 |
| II 1 and 2 RTC and MR - DC ClarificationFile: II 1 & 2 a DC Clarification.pdf | 13 Sep 2022 |
| II 1 and 2 RTC and MR - Seema 3 75 CentsFile: II 1a Seema 3 75 Cents.pdf | 13 Sep 2022 |
| II 1 and 2 RTC and MR - Varadaraj 5 00 CentsFile: II 1b Varadaraj 5 00 Cents.pdf | 13 Sep 2022 |
| II 1 and 2 RTC and MR - Puneeth 9 65 CentsFile: II 1c Puneeth 9 65 Cents.pdf | 13 Sep 2022 |
| II 1 and 2 RTC and MR - Varadaraj 4 40 CentsFile: II 1d Varadaraj 4 40 Cents.pdf | 13 Sep 2022 |
| II 1 and 2 RTC and MR - Varadaraj 0 55 CentsFile: II 1e Varadaraj 0 55 Cents.pdf | 13 Sep 2022 |
| II 1 and 2 RTC and MR - Seema 0 55 CentsFile: II 1f Seema 0 55 Cents.pdf | 13 Sep 2022 |
| 3)need land documents in the name of partnership firm hence need jda or irrevocable gpa in favour ofFile: II 3 Clarification on Land Document.pdf | 13 Sep 2022 |
| 3)need land documents in the name of partnership firm hence need jda or irrevocable gpa in favour ofFile: II 3a Doc 7657.pdf | 13 Sep 2022 |
| 3)need land documents in the name of partnership firm hence need jda or irrevocable gpa in favour ofFile: II 3b Doc 7653.pdf | 13 Sep 2022 |
| 3)need land documents in the name of partnership firm hence need jda or irrevocable gpa in favour ofFile: BIBMIS PARTITION.pdf | 13 Sep 2022 |
| 4)need title documents from rtc land owners to conversion land owners and gpa copiesFile: II 4 Title Doc and RTC of old owners.pdf | 13 Sep 2022 |
| 4)need title documents from rtc land owners to conversion land owners and gpa copiesFile: II 4a DC Clarification.pdf | 13 Sep 2022 |
| 5)not uploaded land cost as per guidance valueFile: II 5 Land Cost.pdf | 13 Sep 2022 |
| 1) Upload the Village Map Demarcation Of the Proposed Site.File: III 1 Village Map.PDF | 13 Sep 2022 |
| 1) Upload the Village Map Demarcation Of the Proposed Site. - Satellite MapFile: III 1a Village Map Showing Demarcation of Site.pdf | 13 Sep 2022 |
| 1) Upload the Village Map Demarcation Of the Proposed Site. - CDPFile: III 1b CDP MASTER PLAN SY NO-41.pdf | 13 Sep 2022 |
| 2) Upload copy of Premium FAR.File: III 2 Premium FAR.pdf | 13 Sep 2022 |
| 3) Upload Architect details with valid COA Number.File: III 3 COA Number declaration.pdf | 13 Sep 2022 |
| 1) Not uploaded properly, Please upload the brief estimated cost of construction certified by the EnFile: IV 1 Estimate by Engineer.pdf | 13 Sep 2022 |
| 2) Uploaded the copy of request letter written to local Municipal office instead of NOC. ThereforeFile: IV 2a Bimbis Water supply Noc_2.pdf | 13 Sep 2022 |
| 2) Uploaded the copy of request letter written to local Municipal office instead of NOC. ThereforeFile: IV 2b Bimbis Mescom NOC_3.pdf | 13 Sep 2022 |
| 3) Uploaded proforma of Agreement for sale(AFS) partially not in accordance with the notified AFS. PFile: IV 3 Proforma Sale Agreement.pdf | 13 Sep 2022 |
| Mention CA UDIN for 2018-19, 2019-20 and 2020-21 profit and loss account and balance sheetFile: I 1 CA UDIN.pdf | 13 Aug 2022 |
| need RTC at the time of conversionFile: II 2 RTC Justification.pdf | 13 Aug 2022 |
| need MRFile: II 2 RTC Justification.pdf | 13 Aug 2022 |
| need registered jda infavour of partnership firmFile: II 4 Partition Deed in lieu of JDA.pdf | 13 Aug 2022 |
| Need notarized Non litigation affidavit with respect the property regarding land acquisition coFile: II 6 Non Litigation Affidavit.pdf | 13 Aug 2022 |
| Need to upload the certified copy obtained by the concerned Sub registrar regarding value of thFile: II 5 Guidance Value.pdf | 13 Aug 2022 |
| Upload all level sanctioned floor plan and site planFile: III 1 All level sanctioned plan site plan section plan.pdf | 13 Aug 2022 |
| Upload copy of Premium FARFile: III 2 Premium FAR.pdf | 13 Aug 2022 |
| Upload Architect details with valid COA NumberFile: III 3 Architect Detail with COA.pdf | 13 Aug 2022 |
| Upload the Village Map Demarcation Of the Proposed SiteFile: III 4 Village Map Showing Demarcation of Site.pdf | 13 Aug 2022 |
| Upload the CDP Map Showing the Proposed SiteFile: III 5 CDP MASTER PLAN SY NO-41.pdf | 13 Aug 2022 |
| in Development Details Bifurcation of Type of Inventories Flats Sites Plots Villas inventoryFile: III 7 Bifurcation of Type of Inventories.pdf | 13 Aug 2022 |
| Please update the Exclusive Common Area Allottee and Common Area Allotted To Association in the pFile: IV 1 Exclusive Common Area and Common Area.pdf | 13 Aug 2022 |
| Please upload the brief estimated cost of construction certified by the Engineer accordingly pleaFile: IV 3 Form 3.pdf | 13 Aug 2022 |
| Please upload the signed copy of the project specification incorporating with the project name anFile: IV 4 Project Specifications.pdf | 13 Aug 2022 |
| Please upload the section 3 1 notarized affidavit by incorporating with the project name ProjecFile: IV 5 Affidavit 3 1.pdf | 13 Aug 2022 |
| Provision of STP Septic Tank in the project is to be clarified by the promoter along with the supFile: IV 6 Provision for STP in the plan.pdf | 13 Aug 2022 |
| Uploaded letter are not a valid NOC Therefore Please upload the valid NOC issued by water supplFile: IV 7.pdf | 13 Aug 2022 |
| Please upload the Proforma of Allotment LetterFile: IV 8 Proforma Allotment Letter.pdf | 13 Aug 2022 |
| Uploaded proforma of Agreement for sale AFS not in accordance with the notified AFS Please uploFile: IV 9 Proforma Sale Agreement.pdf | 13 Aug 2022 |
| OTHER QUERIESFile: Vigneshwara Developers.pdf | 13 Aug 2022 |
| RTC, survey Sy. No. 41/4B(P2), 41/4B(P), 41/4B(P), 41/6[P], 41/4B(P), 41/4B, 41/6, 41/4B(P), 41-3[P], 41/6(P) | - |
| Mutation, survey Sy. No. 41/4B(P2), 41/4B(P), 41/4B(P), 41/6[P], 41/4B(P), 41/4B, 41/6, 41/4B(P), 41-3[P], 41/ | - |
| Encumbrance Certificate, survey Sy. No. 41/4B(P2), 41/4B(P), 41/4B(P), 41/6[P], 41/4B(P), 41/4B, 41/6, 41/4B(P | - |
| Conversion/Alienation Order, survey Sy. No. 41/4B(P2), 41/4B(P), 41/4B(P), 41/6[P], 41/4B(P), 41/4B, 41/6, 41/ | - |
| Sale/Title/Gift Deed, survey Sy. No. 41/4B(P2), 41/4B(P), 41/4B(P), 41/6[P], 41/4B(P), 41/4B, 41/6, 41/4B(P), | - |
| JDA, survey Sy. No. 41/4B(P2), 41/4B(P), 41/4B(P), 41/6[P], 41/4B(P), 41/4B, 41/6, 41/4B(P), 41-3[P], 41/6(P) | - |
| Khatha, survey Sy. No. 41/4B(P2), 41/4B(P), 41/4B(P), 41/6[P], 41/4B(P), 41/4B, 41/6, 41/4B(P), 41-3[P], 41/6( | - |
| Registration CertificateFile: Firm Registration certificate .pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form 1 CA Compressed.pdf | - |
| Certificate issued by Architect Form 2File: IV 3) Form 2.pdf | - |
| Certificate issued by Engineer Form 3File: IV 3) Form 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Rera Land Owner Declaration.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA Compressed.pdf | - |
| Balance Sheet 2020 - 2021File: BS_compressed.pdf | - |
| Balance Sheet 2019 - 2020File: BS.pdf | - |
| Balance Sheet 2018 - 2019File: BS.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: PL_compressed.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: PL.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: PL.pdf | - |
| Auditor's Report 2020 - 2021File: Audit Report.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| KADRI ENCLAVE | Alvares Road Kadri Mangalore | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep BIMBIS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
Filed coordinates, straight-line distance. 103 registered projects within 2 km.
LUCENT
M/s MOHTISHAM COMPLEXES PVT LTD
Rudraksh
Mukund MGM Realty
PRISTINE
Land Trades Builders and Developers
LOTUS ATHARVA
Lotus Properties
Kedar
Mukund MGM Realty
SOMAYAJI GREENWOOD
Somayaji Estates Private Limited
See every Dakshina Kannada project, with the district possession charts
Builder: SHREE VIGNESHWARA DEVELOPERS
Shree Vigneshwara Developers has 5 registrations on RERA Karnataka, including Kadri Enclave and BIMBIS. Its filings declare 8 earlier projects, 5 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if BIMBIS is delayed beyond 15 Jan 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of BIMBIS?
The registered promoter entity is SHREE VIGNESHWARA DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29ACBFS6815N1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in BIMBIS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at BIMBIS?
The professionals named in the filing: Architect: Krishna Shetty; Engineer: Krishna Shetty; Chartered Accountant: M Jagannath Kamath & Co Ptr CA Karthikeya D Shenoy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BIMBIS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.