Home / Browse projects / Pune, Maharashtra / BILWADAL

Registration lapsed No litigation declared Residential / Group Housing project

BILWADAL

By AASTHA DEVELOPERS

RG-MH-47747 · RERA P52100047376 · Last updated on MahaRERA portal: 2 Dec 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
0 of 11Construction stages donefurthest along: Excavation, 90%
0Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

BILWADAL is a Residential / Group Housing project by AASTHA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100047376 on 27 Oct 2022. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameBILWADAL
  • TypeResidential / Group Housing
  • Location
    • S NO 121(P)
    • TATHWADE
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100047376
  • ReraGenie IDRG-MH-47747

Builder

  • NameAASTHA DEVELOPERS
  • Entity typePartnership
  • PartnersSANGAMESHWAR TULSHIRAM VALAKATE, DAYANAND TULSHIRAM WALAKATE, BHIMASHANKAR TULSHIRAM WALLAKATTE, UTTAM TULSHIRAM WALAKATE
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

22 months past promisethis monthRegisteredOct 2022First promiseJun 2023Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Oct 2022
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING-1NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

BUILDING-1: 30% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area497 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Mr Bhimashankar Tulshiram WallakattePimpri Chinchawad (M Corp.)Pune
Mr Sangameshwar Tulshiram ValakatePimpri Chinchawad (M Corp.)Pune
Mr Uttam Tulsiram WalakatePimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI549.76
Proposed, not sanctioned344 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBijlee Nagar chinchwad Pune 411033

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHREE SPACES
EngineerROHINEE BADGUJAR
Chartered AccountantCA Pravin Pise and Associates
PartnerRole in project
AASTHA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018018Jun 2023 → Dec 2024

Reason as filed by the promoterThe financial issues caused by COVID-19 have resulted in project delays

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: 1 Declaration about Commencement Certificate (31) (1).pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: Bilwadal LEtterhead (1) (1).pdf1 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Certificate.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 (RERA AUDIT)_compressed.pdf24 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aastha Developer 2A.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GetUserDocumentFileContent (54) (1).pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate Mar.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate June.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate Sept.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate Mar.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate June.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate Sept.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate Sept.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bilwadal.pdf24 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 UPDATED 07-02-2023.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM-3 (BILWADAL) (1)_compressed.pdf16 Feb 2023
Other - LegalFile: Agreement to sell draft.pdf15 Oct 2022
Copy of the legal title reportFile: Search title report - Bilwadal_compressed.pdf6 Oct 2022
Details of encumbrances concerned to LegalFile: no encumbrances certificate.pdf30 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (2)_compressed.pdf30 Jul 2022
Layout approvalFile: PLAN_compressed (2).pdf29 Jul 2022
Building plan approvalFile: PLAN_compressed (2).pdf29 Jul 2022
Copy of Layout Approval (in case of layout)File: PLAN_compressed (2).pdf29 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN_compressed (2).pdf29 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE 1MB.pdf29 Jul 2022
Proforma of Agreement for saleFile: Draft Agreement and allotment letter.pdf29 Jul 2022
Proforma of Allotment letterFile: Draft Agreement and allotment letter.pdf29 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow29 Jul 2022
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf29 Jul 2022
Deviation Report with respect to model copy of AgreementFile: no deviation in sale agreement.pdf29 Jul 2022
Details of encumbrances concerned to FinanceFile: no encumbrances certificate.pdf27 Jul 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT.pdf27 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200243306546_For_Asset_Based_Search_27_07_2022_19_17_40_793.pdf27 Jul 2022
PAN CardFile: ASTHA PAN CARD.pdf23 Jul 2022
Copy of the legal title reportFile: LEGAL AND TITLE REPORT1.pdf23 Jul 2022
Declaration in FORM BFile: 1 Declaration in FORM B.pdf23 Jul 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BILWADAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TATHWADE13,700+ in Pune

Builder: AASTHA DEVELOPERS

AASTHA DEVELOPERS has 5 registrations on MahaRERA, including PRITHVI MONARCH and AASTHA RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that BILWADAL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BILWADAL is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BILWADAL?

The registered promoter entity is AASTHA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BILWADAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BILWADAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BILWADAL?

The professionals named in the filing: Architect: SHREE SPACES; Engineer: ROHINEE BADGUJAR; Chartered Accountant: CA Pravin Pise and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BILWADAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BILWADAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BILWADAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.