Registered No litigation declared Residential / Group Housing project

BILESHWAR

By ASHAPURA COMBINES

RG-MH-06387 · RERA P51700054702 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 85%
127 of 291Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

BILESHWAR is a Residential / Group Housing project by ASHAPURA COMBINES in Thane, Maharashtra, registered with MahaRERA as P51700054702 on 6 Feb 2024. Possession is promised by 31 Dec 2028. 164 of the 291 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameBILESHWAR
  • TypeResidential / Group Housing
  • Location
    • Wadeghar
    • Wadeghar- Kalyan West
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054702
  • ReraGenie IDRG-MH-06387

Builder

  • NameASHAPURA COMBINES
  • Entity typePartnership
  • PartnersHARILAL NATHU PATEL, VIPUL HARILAL PATEL, MANGESH DASHRATH GAIKAR
  • Other registrations4 more →
  • Completed2 of 5

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed82 files

Current status

56%164 of 291 units booked
69.5%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA1919871198
BUILDING NO 2NA191917716193

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.

BUILDING NO 154%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 256%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed197

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots197
Closed/Covered151
Open Space46
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1752398
BUILDING NO 2762399

Land and ownership105

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,510 sq m
Land owned byThe promoter, with other names on the file
Named landowners105
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jun 2026
LandownerVillageDistrict
Gajanan Kalu DalviGhatkoparMumbai Suburban
Santosh Gajanan DalviGhatkoparMumbai Suburban
Ramesh Kalu DalviGhatkoparMumbai Suburban
Kamlabai Vaman PatilGhatkoparMumbai Suburban
Ujjwala Vilas MirkuteGhatkoparMumbai Suburban
Rakesh Manohar KonkarGhatkoparMumbai Suburban
Umesh Manohar KonkarGhatkoparMumbai Suburban
Sunita Shankar PawarGhatkoparMumbai Suburban
Sandesh Gajanan DalviGhatkoparMumbai Suburban
Sandeep Gajanan DalviGhatkoparMumbai Suburban
Suresh Kalu DalviGhatkoparMumbai Suburban
Sanjay Suresh DalviGhatkoparMumbai Suburban
Bhagabai Dashrath ShelarGhatkoparMumbai Suburban
Vishnu Dashrath ShelarGhatkoparMumbai Suburban
Laxmi Vishnu ShelarGhatkoparMumbai Suburban
Chandrakant Dashrath ShelarGhatkoparMumbai Suburban
Vandana Chandrakant ShelarGhatkoparMumbai Suburban
Ramesh Dashrath ShelarGhatkoparMumbai Suburban
Vithabai Ramesh ShelarGhatkoparMumbai Suburban
Gurunath Dashrath ShelarGhatkoparMumbai Suburban
Lilabai Gurunath ShelarGhatkoparMumbai Suburban
Bhagwan Dashrath ShelarGhatkoparMumbai Suburban
Subhadra Bhagwan ShelarGhatkoparMumbai Suburban
Krushna Dashrath ShelarGhatkoparMumbai Suburban
Sunanda Krushna ShelarGhatkoparMumbai Suburban
Sanjay Dashrath ShelarGhatkoparMumbai Suburban
Shubhangi Sanjay ShelarGhatkoparMumbai Suburban
Sharad Vishnu ShelarGhatkoparMumbai Suburban
Ratna Sharad ShelarGhatkoparMumbai Suburban
Rakesh Ramesh ShelarGhatkoparMumbai Suburban
Vasudev Gurunath ShelarGhatkoparMumbai Suburban
Mahesh Bhagwan ShelarGhatkoparMumbai Suburban
Nirmala Pandhari PatilGhatkoparMumbai Suburban
Sujata Haresh BhoirGhatkoparMumbai Suburban
Rekha Balaram PatilGhatkoparMumbai Suburban
Lilabai Mahadu GaikarGhatkoparMumbai Suburban
Suman Kanha BhoirGhatkoparMumbai Suburban
Sulochana Prakash KatheGhatkoparMumbai Suburban
Baliram Genu ShelarGhatkoparMumbai Suburban
Jaibai Baliram ShelarGhatkoparMumbai Suburban
Ramdas Baliram ShelarGhatkoparMumbai Suburban
Kanta Ramdas ShelarGhatkoparMumbai Suburban
Sunil Baliram ShelarGhatkoparMumbai Suburban
Kamla Sunil ShelarGhatkoparMumbai Suburban
Dilip Baliram ShelarGhatkoparMumbai Suburban
Shobha Vijay BhoirGhatkoparMumbai Suburban
Sulbha Dnyaneshwar MhatreGhatkoparMumbai Suburban
Kaluram Laxman ShelarGhatkoparMumbai Suburban
Durga Kaluram ShelarGhatkoparMumbai Suburban
Vijay Laxman ShelarGhatkoparMumbai Suburban
Sangeeta Vijay ShelarGhatkoparMumbai Suburban
Milind Kaluram ShelarGhatkoparMumbai Suburban
Pappi Milind ShelarGhatkoparMumbai Suburban
Yogesh Kaluram ShelarGhatkoparMumbai Suburban
Sarika Kaluram ShelarGhatkoparMumbai Suburban
Suresh Sharad ShelarGhatkoparMumbai Suburban
Parvatibai Sudam PatilGhatkoparMumbai Suburban
Nanda Manik PatilGhatkoparMumbai Suburban
Dhanibai Shankar ShelarGhatkoparMumbai Suburban
Gangubai Abhimanyu ShelarGhatkoparMumbai Suburban
Yashwant Shankar ShelarGhatkoparMumbai Suburban
Geeta Yashwant ShelarGhatkoparMumbai Suburban
Usha Vishnu MhatreGhatkoparMumbai Suburban
Sudha Madhukar ThakreGhatkoparMumbai Suburban
Jankubai Pandurang BhandariGhatkoparMumbai Suburban
Nagubai Namdeo KarbhariGhatkoparMumbai Suburban
Radhabai Ananta PatilGhatkoparMumbai Suburban
Laxman Govind MadhaviGhatkoparMumbai Suburban
Chaya Laxman MadhaviGhatkoparMumbai Suburban
Ramchandra Govind MadhaviGhatkoparMumbai Suburban
Sangeeta Ramchandra MadhaviGhatkoparMumbai Suburban
Lata Parshuram PimpleGhatkoparMumbai Suburban
Manglya Alias Mangesh Vitthal Naik Alias VanjurkarGhatkoparMumbai Suburban
Sangeeta Mangesh Naik Alias VanjurkarGhatkoparMumbai Suburban
Aavish Alias Avinash Vitthal Naik Alias VanjurkarGhatkoparMumbai Suburban
Vandana Avinash Naik Alias VanjurkarGhatkoparMumbai Suburban
Nirabai Alias Nirmala Mangaldas PatilGhatkoparMumbai Suburban
Kantibai Alias Kanta Prakash KeneGhatkoparMumbai Suburban
Pandabai Alias Sumitra Dinkar NaikGhatkoparMumbai Suburban
Heerabai Baban NaikGhatkoparMumbai Suburban
Harshal Baban NaikGhatkoparMumbai Suburban
Prakash Baban NaikGhatkoparMumbai Suburban
Fashibai Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Haresh Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Anita Haresh Naik Alias VanjurkarGhatkoparMumbai Suburban
Sharad Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Lalita Sharad Naik Alias VanjurkarGhatkoparMumbai Suburban
Sharmila Barku Alias Barkya KharbeGhatkoparMumbai Suburban
Bhagirthi Alias Bhagubai Vandar MadhaviGhatkoparMumbai Suburban
Gulab Kaluram Naik Alias VanjurkarGhatkoparMumbai Suburban
Naresh Kaluram Naik Alias VanjurkarGhatkoparMumbai Suburban
Asha Naresh Naik Alias VanjurkarGhatkoparMumbai Suburban
Vidhya Naresh TiwariGhatkoparMumbai Suburban
Lata Bharat ChaudhariGhatkoparMumbai Suburban
Kavita Pramod MhatreGhatkoparMumbai Suburban
Janabai Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Sham Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Usha Sham Naik Alias VanjurkarGhatkoparMumbai Suburban
Rajesh Sham NaikGhatkoparMumbai Suburban
Dipti Sham NaikGhatkoparMumbai Suburban
Vasudev Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Lata Vasudev Naik Alias VanjurkarGhatkoparMumbai Suburban
Heerabai Yashwant Naik Alias VanjurkarGhatkoparMumbai Suburban
Laxmibai Alias Pramila Sudarshan ChaudhariGhatkoparMumbai Suburban
Nirmala Satyavan PatilGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authorityKDMC
Permissible FSI18031.71
Proposed, not sanctioned18,032 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJayant Arcade Junction of M G Rd and Rajawadi Naka Ghatkopar East Mumbai
Estimated costRs 77.79 cr
Cost incurredRs 54.09 cr
Work done69.53%
BuildingWingEstimatedIncurred
BUILDING NO 1NARs 38.15 crRs 27.05 cr
BUILDING NO 2NARs 38.15 crRs 27.05 cr
-NARs 1.50 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREDIBLE DESIGNS DEEPAK PATIL
EngineerSHANTI CONSULTANT
EngineerJAYENDRA VISANJI VIRA
Chartered AccountantM K RAMANI
Chartered AccountantK H R & Co
PartnerRole in project
ASHAPURA COMBINES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 10Architect Certificate.pdf22 Jun 2026
Withdrawal Update Form 1File: 10Architect Certificate.pdf22 Jun 2026
Withdrawal Update Form 1File: 10Architect Certificate.pdf22 Jun 2026
Withdrawal Update Form 1File: 10Architect Certificate.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate - FORM 2.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate - FORM 2.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate - FORM 2.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate - FORM 2.pdf22 Jun 2026
Withdrawal Update Form 3File: BILESHWAR-FORM 3 -22-12-2023_11zon.pdf22 Jun 2026
Withdrawal Update Form 3File: BILESHWAR-FORM 3 -22-12-2023_11zon.pdf22 Jun 2026
Withdrawal Update Form 3File: BILESHWAR-FORM 3 -22-12-2023_11zon.pdf22 Jun 2026
Withdrawal Update Form 3File: BILESHWAR-FORM 3 -22-12-2023_11zon.pdf22 Jun 2026
Form 2A (FY 2025-2026)File: ENGINEER CERTIFICATE BILESHWAE 31-3-26.pdf30 Apr 2026
Form 1File: 1-BILESHWAR ARCHITECT CERTIFICATE 31-3-26.pdf29 Apr 2026
Form 2File: 2-ENGINEER CERTIFICATE BILESHWAR 31-3-26.pdf29 Apr 2026
Form 3File: 3-Form 3 - Bileshwar -31-3-26.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf29 Apr 2026
Form 1File: 1-bileshwar Architect Certificate 31-12-2025.pdf27 Jan 2026
Form 2File: 2- ENGINEER Certificate 31-12-2025.pdf27 Jan 2026
Form 3File: 3- Form 3 - Bileshwar -Scan copy.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: BILESHWAR Sold Unsold Inventory-31-12-25.pdf27 Jan 2026
Form 1File: BILESHWAR ARCHITECT CERTIFICATE 30-9-25.pdf13 Nov 2025
Form 2File: BIESHWAR ENGINEER CERTIFICATE 30-9-25.pdf13 Nov 2025
Form 3File: BS-FORM-3 as on 30-9-25.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Bileshwar - Sold Unsold Inventory details.pdf13 Nov 2025
Form 2A (FY 2024-2025)File: BILESHWAR ENGINEER CERTIFICATE 31-3-25.pdf26 Sep 2025
Form 5 (FY 2024-2025)File: Bileshwar - Form 5- YR-2024-25.pdf26 Sep 2025
Form 1File: BILESHWAR ARCHITECT CERTIFICATE 30-6-25.pdf11 Sep 2025
Form 2File: BILESHWAR ENGINEER CERTIFICATE 30-6-25.pdf11 Sep 2025
Form 3File: BS- Form 3-30-6-25.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Bileshwar - Inventory Details-30-6-25.pdf11 Sep 2025
Disclosure of sold/ booked inventoryFile: BILESHWAR SOLD INVENTORY 31-3-25.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: BILESHWAR ENGINEER CERTIFICATE 31-3-25.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6th Form 3 - Bileshwar -31-3-25.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BILESHWAR ENGINEER CERTIFICATE 31-03-2025.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BILESHWAR ARCHITECT CERTIFICATE 31-03-2025.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Bileshwar sold list 31-12-24.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5th Form 3 - Bileshwar-31-12-24- Signed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BILESHWAR 31-12-24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE BILESHWAR 31-12-24.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE BILESHWAR 30-6-24.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE BILESHWAR 30-9-24.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bileshwar-Form3 31-3-24.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bileshwar-Form3 30-6-24.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bileshwar-Form3 30-9-24.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BILESHWAR 31-03-24.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BILESHWAR 30-06-24.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BILESHWAR 30-09-24.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE BILESHWAR 31-03-24.pdf27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-dt-04-11-2024.pdf4 Nov 2024
Other - LegalFile: DocScanner 16 Jan 2024 12-57_11zon.pdf16 Jan 2024
Other - LegalFile: 3 Other - Legal (5).pdf16 Jan 2024
Other - LegalFile: DocScanner 16-Jan-2024 12-57 pm.pdf15 Jan 2024
Copy of the legal title reportFile: ilovepdf_merged (58)_11zon_organized.pdf20 Dec 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - LEGAL.pdf19 Dec 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE - LEGAL.pdf19 Dec 2023
Other - LegalFile: S NO 90(5) CONFIRMATION DEED maina chuadhari_11zon.pdf19 Dec 2023
Other - LegalFile: S NO 89 (1) CONFIRMATION DEED Anandibai dalvi_11zon.pdf19 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Verification- Bileshwar.pdf30 Nov 2023
Other - TechnicalFile: CC Verification- Bileshwar.pdf30 Nov 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - FINANCE.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE - FINANCE.pdf26 Oct 2023
Declaration about Commencement CertificateFile: FORM D.pdf26 Oct 2023
Declaration in FORM BFile: FORM B.pdf26 Oct 2023
CERSAI detailsFile: CERSAI.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BILESHWAR-FORM 3 -22-12-2023_11zon.pdf26 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration bank account - bileshwar.pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GetUserDocumentFileContent (4).pdf4 Oct 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT- ALLOTMENT.pdf4 Oct 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT (2).pdf4 Oct 2023
Building plan approvalFile: BILESHWAR KDMC SCAN PLAN (2)_compressed.pdf1 Aug 2023
Building plan approvalFile: BILESHWAR KDMC SCAN PLAN (3)_compressed.pdf1 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: BILESHWAR KDMC SCAN PLAN (2)_compressed.pdf1 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: BILESHWAR KDMC SCAN PLAN (3)_compressed.pdf1 Aug 2023
Layout approvalFile: LAYOUT PLAN.pdf31 Jul 2023
PAN CardFile: 1ASHAPURA COMBINES - PAN.pdf31 Jul 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf31 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: 7BILESHWAR - CC.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10Architect Certificate.pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - FORM 2.pdf31 Jul 2023

How this compares with Thane

56%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BILESHWAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadeghar- Kalyan West7,600+ in Thane

2 kmBILESHWARCompleted 60Lapsed / revoked 33Other 90Dot size: filed unitsN

Filed coordinates, straight-line distance. 183 registered projects within 2 km.

Builder: ASHAPURA COMBINES

ASHAPURA COMBINES has 5 registrations on MahaRERA, including NEELKANTH SHRUSHTI and RAMESHWAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if BILESHWAR is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BILESHWAR?

The registered promoter entity is ASHAPURA COMBINES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BILESHWAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BILESHWAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BILESHWAR?

The professionals named in the filing: Architect: CREDIBLE DESIGNS DEEPAK PATIL; Engineer: SHANTI CONSULTANT; Engineer: JAYENDRA VISANJI VIRA; Chartered Accountant: M K RAMANI; Chartered Accountant: K H R & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BILESHWAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BILESHWAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BILESHWAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.