Registered No litigation declared Others project

Bhoishwaram

By M/s Aparna Builders

RG-MH-53416 · RERA P52100017611 · Last updated on MahaRERA portal: 21 Feb 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 27 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 27 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
31 of 52Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Bhoishwaram is a Others project by M/s Aparna Builders in Pune, Maharashtra, registered with MahaRERA as P52100017611 on 29 Aug 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 27 months from the original filing. 21 of the 52 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameBhoishwaram
  • TypeOthers
  • Location
    • Kumbharwada Signal Chowk
    • Kasba Peth
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411011
  • Pincode411011
  • RERA no.P52100017611
  • ReraGenie IDRG-MH-53416

Builder

  • NameM/s Aparna Builders
  • Entity typeOthers
  • Named personDattatray Baburao Shintre
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2018First promiseSep 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Aug 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 15 Sep 2024)
  • Buildings1 building record
  • Documents filed73 files

Current status

40%21 of 52 units booked

Figures as on 21 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BhoishwaramNA9743952

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Bhoishwaram: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Open Space50

Land and ownership56

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area341 sq m
Land owned byThe promoter, with other names on the file
Named landowners56
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Oct 2025
LandownerVillageDistrict
Indumati Shankar GhagPune (M Corp.)Pune
Ramesh Shankar GhagPune (M Corp.)Pune
Savita Ramesh GhagPune (M Corp.)Pune
Amol Shankar GhagPune (M Corp.)Pune
Pratibha Shankar GhagPune (M Corp.)Pune
Rajashree Prashant SalunkePune (M Corp.)Pune
RUPALI SUNIL DHAYTADESolapur (M Corp.)Solapur
chaya chandrakant ghagPune (M Corp.)Pune
roopali manish ghagPune (M Corp.)Pune
anupama vikas khandagaleHaripurSangli
rakhi ajit bhakareAlibag Raigarh
vijay alias vijaykant mahadeo ghagPune (M Corp.)Pune
indrayani vijay ghagPune (M Corp.)Pune
sadhna rahul ghumePune (M Corp.)Pune
poonam gopal musalePune (M Corp.)Pune
pritam abasaheb bhokareKarad (M Cl)Satara
neelam sachin ghabadeKatrajPune
kalyani sachin bhokareTalegaon Dabhade (M Cl)Pune
anita swapnil bhokarePune (M Corp.)Pune
surekha alias jayashri suresh tikonePune (M Corp.)Pune
usha subhash tikoneWadagaon (CT)Pune
nanda shankar katkarNavi Mumbai Panvel Rigardh (CT)Raigarh
Rukhmini Tukaram MahadikPune (M Corp.)Pune
alka suryakant bhakareAlibag Raigarh
suresh haribhau taruPimpri Chinchawad (M Corp.)Pune
yashodhara suresh taruPimpri Chinchawad (M Corp.)Pune
heeralal suresh taruPimpri Chinchawad (M Corp.)Pune
pratibha hiralal taruPimpri Chinchawad (M Corp.)Pune
anand suresh taruPimpri Chinchawad (M Corp.)Pune
poonam anand taruPimpri Chinchawad (M Corp.)Pune
ashok haribhau taruBanerPune
sheela ashok taruBanerPune
mahesh ashok taruBanerPune
pallavi mahesh taruBanerPune
swapnil ashok taruBanerPune
jayashree sanjay sakpalRoha (Gaulwadi)Raigarh
sharad haribhau taruPune (M Corp.)Pune
lata sharad taruPune (M Corp.)Pune
yogesh sharad taruPune (M Corp.)Pune
dhnyanesh sharad taruPune (M Corp.)Pune
smita ganesh jamdadeWarjePune
ramesh haribhau taruPune (M Corp.)Pune
nisha ramesh taruPune (M Corp.)Pune
subhadra dashrath ghag-Pune
mahesh dashrath ghag-Pune
anuradha mahesh ghag-Pune
shrikant dashrath ghag-Pune
poonam shrikant ghag-Pune
madhavi deepak mulay-Pune
deepali vinod bhokare-Pune
khandu sadashiv bhokare-Pune
ashok khandu bhokare-Pune
vinod khandu bhokare-Pune
prakash khandu bhokare-Pune
sunanda alias jayashri suresh tikonePune (M Corp.)Pune
meena santosh shingare-Pune

Approvals and building plan

Sanctioning authorityPUNE MUNCIPAL CORPORATION BUILDING CONTROL DEPARTMENT
Permissible FSI2412.3
Proposed, not sanctioned412 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFergussion Collage road Pune Maharashtra 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShinde Joshi Associates
Chartered AccountantS N KHANDLELWAL
PartnerRole in project
M/s Aparna Builders-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025685Sep 2024 → Dec 2026

Reason as filed by the promoterDear Sir/Mam, Our Project “Bhoishwaram” being maharera registered having registration number : P52100017611 had Proposed Date of Completion at the time of application of project was expected to be 15/09/2024. Further, Due to the condition of nationwide lockdown pertaining to the conditions of COVID -19 in 2020 & 2021 the work in progress of the aforesaid project was largely impacted due to shortage of labour being specifically skilled labours and materials. Further, due to the said lapse of time and Post normalization due to reduced demands we are asking for an additional time being in form of

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12503713Rajlaxmee Rohitaksha BolarM/s Aparna Builders20/10/2025
CC12601573Rajlaxmee Rohitaksha BolarM/s Aparna Builders21/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf21 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20-21.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22-23.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 23-24.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf31 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Q2.pdf31 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Q3.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf31 Jan 2025
Declaration in FORM BFile: FORM B.pdf3 Jan 2025
Certificates of CA (Form 3)File: FORM 36compressed.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM - 1.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual report statement.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf19 Apr 2024
Certificates of CA (Form 3)File: Form 3.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold for Rera.pdf19 Jan 2024
Certificates of CA (Form 3)File: FORM 3.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf9 Dec 2023
Certificates of CA (Form 3)File: FORM 3.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold unsold july.pdf5 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: june 2023.pdf4 Jul 2023
Disclosure of sold/ booked inventoryFile: Rera sold unsold (1).pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 3 CA Certificate.pdf22 Apr 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf22 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf11 Apr 2023
Disclosure of sold/ booked inventoryFile: Adobe Scan 11-Apr-2023.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Pdf.pdf4 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bhoishwaram.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 23.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: sold unsold 2-23.pdf16 Feb 2023
Certificates of CA (Form 3)File: Rera (2).pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5 18-19_compressed.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5 19-20_compressed.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5 20-21_compressed.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5 21-22_compressed.pdf14 Feb 2023
Certificates of CA (Form 3)File: SCAN (3).pdf9 Dec 2022
Layout approvalFile: Commencement Certificate.pdf2 Nov 2022
Layout approvalFile: Layout_compressed.pdf2 Nov 2022
Copy of Layout Approval (in case of layout)File: Commencement Certificate.pdf2 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf2 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf1 Nov 2022
Proforma of Allotment letterFile: REVISED RERA DRAFT 16 AUG_compressed.pdf16 Aug 2022
Layout approvalFile: scan18489.pdf15 Dec 2021
Layout approvalFile: Document 2.pdf15 Dec 2021
Layout approvalFile: scan18492_compressed 3-3.pdf15 Dec 2021
Copy of Layout Approval (in case of layout)File: scan18489.pdf15 Dec 2021
Copy of Layout Approval (in case of layout)File: Document 2.pdf15 Dec 2021
Copy of Layout Approval (in case of layout)File: scan18492_compressed 3-3.pdf15 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf15 Dec 2021
Declaration about Commencement CertificateFile: SKMBT_C28021121418270.pdf15 Dec 2021
Certificates of CA (Form 3)File: CA_Certificate_with_Annexure (1)-ilovepdf-compressed.pdf27 Aug 2018
Proforma of Allotment letterFile: Booking_Agreement_Flat (2) (1).pdf21 Aug 2018
Building plan approvalFile: Layout 1-2.pdf20 Aug 2018
Layout approvalFile: Layout 2-2.pdf20 Aug 2018
Copy of the legal title reportFile: Adv Tilak Title Report.pdf20 Aug 2018
Details of encumbrancesFile: mortgagae deed index.pdf20 Aug 2018
Copy of Layout Approval (in case of layout)File: Layout 2-2.pdf20 Aug 2018
Building Plan Approval (IOD)File: Layout 1-2.pdf20 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf20 Aug 2018
Declaration in FORM BFile: shintre declaration.pdf20 Aug 2018

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Ramkrishankunj983 Kasba Peth Pune1CompletedNov 2015Late, Dec 2016
Om Sai Leela543 544 545 kasba peth pune18CompletedSep 2014Late, Oct 2016
Kedarnath1167 and 1171 kasba Peth Pune15CompletedSep 2008Feb 2008

How this compares with Pune

40%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 27 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhoishwaram on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kasba Peth13,700+ in Pune

Builder: M/s Aparna Builders

M/s Aparna Builders has 1 registration on MahaRERA, including Bhoishwaram. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Bhoishwaram is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhoishwaram?

The registered promoter entity is M/s Aparna Builders, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhoishwaram?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Bhoishwaram?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Bhoishwaram?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bhoishwaram?

The professionals named in the filing: Architect: Shinde Joshi Associates; Chartered Accountant: S N KHANDLELWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bhoishwaram?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhoishwaram. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhoishwaram to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.