Home / Browse projects / Thane, Maharashtra / BHAWANI SHANKAR RESIDENCY

Registered No litigation declared Others project

BHAWANI SHANKAR RESIDENCY

By BHAWANI SHANKAR RESIDENCY

RG-MH-04462 · RERA P51700021856 · Last updated on MahaRERA portal: 30 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
14 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 80%
25 of 192Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

BHAWANI SHANKAR RESIDENCY is a Others project by BHAWANI SHANKAR RESIDENCY in Thane, Maharashtra, registered with MahaRERA as P51700021856 on 5 Aug 2019. Possession is promised by 30 Dec 2026. 167 of the 192 units on this registration are recorded sold or booked, and 14 of 44 construction stages are filed complete.

At a glance

Project

  • NameBHAWANI SHANKAR RESIDENCY
  • TypeOthers
  • Location
    • BADLAPUR
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700021856
  • ReraGenie IDRG-MH-04462

Builder

  • NameBHAWANI SHANKAR RESIDENCY
  • Entity typePartnership
  • PartnersTEENADEVI SANTOSHKUMAR GATTANI, SAGAR SANTOSHKUMAR GATTANI

Key dates

this monthRegisteredAug 2019PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed132 files

Current status

87%167 of 192 units booked
85.8%Work done, per cost certificate

Figures as on 30 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHAWANI SHANKAR RESIDENCY - A WINGNA117916
BHAWANI SHANKAR RESIDENCY - B WINGNA88771289
BHAWANI SHANKAR RESIDENCY - C WINGNA5551051
BHAWANI SHANKAR RESIDENCY - D WINGNA5536036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 30 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

BHAWANI SHANKAR RESIDENCY - A WING60%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
BHAWANI SHANKAR RESIDENCY - B WING78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
BHAWANI SHANKAR RESIDENCY - C WING78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
BHAWANI SHANKAR RESIDENCY - D WING78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 30 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,364 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKulgaon Badlapur Municipal Council
Permissible FSI9352.04
Proposed, not sanctioned6,928 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBADLAPUR
Estimated costRs 16.56 cr
Cost incurredRs 14.20 cr
Work done85.76%
BuildingWingEstimatedIncurred
BHAWANI SHANKAR RESIDENCY - A WINGNARs 4.14 crRs 3.55 cr
BHAWANI SHANKAR RESIDENCY - B WINGNARs 4.14 crRs 3.55 cr
BHAWANI SHANKAR RESIDENCY - C WINGNARs 4.14 crRs 3.55 cr
BHAWANI SHANKAR RESIDENCY - D WINGNARs 4.14 crRs 3.55 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMangesh M Agivale
EngineerATUL KUDTARKAR
Chartered AccountantC A ASHWINI PRABHU
Chartered AccountantCA AMRRITA JAGNAANI
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
BHAWANI SHANKAR RESIDENCY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Feb 2022

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate_June 25.pdf30 Nov 2025
Withdrawal Update Form 1File: Architect Certificate_Sep 25.pdf30 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate_June 25.pdf30 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate_Sep 25.pdf30 Nov 2025
Withdrawal Update Form 3File: CA Certificate_June 25.pdf30 Nov 2025
Withdrawal Update Form 3File: CA Certificate_Sep 25.pdf30 Nov 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_June 24.pdf27 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Sep 24.pdf27 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Dec 24.pdf27 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_March 24.pdf27 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_March 24.pdf27 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_June 24.pdf27 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Sep 24.pdf27 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Dec 24.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_March 2024.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_Dec 2024.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_March 2025.pdf27 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cetificate-M25.pdf26 Jun 2025
Certificates of CA (Form 3)File: CA Certificate_Mar 24.pdf26 Jun 2025
Certificates of CA (Form 3)File: CA Certificate_June 24.pdf26 Jun 2025
Certificates of CA (Form 3)File: CA Certificate_Sep 24.pdf26 Jun 2025
Certificates of CA (Form 3)File: CA Certificate_Dec 24.pdf26 Jun 2025
Certificates of CA (Form 3)File: CA Certificate_Mar 25.pdf26 Jun 2025
Certificates of CA (Form 3)File: Copy of CA Certificate_Mar 2025.pdf26 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cetificate-M25_1.pdf26 Jun 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Bhawani Shankar Residency.pdf26 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_Bhawani Shankar Residency.pdf26 Jun 2025
Other - TechnicalFile: Form 2A FY-2024-25.pdf26 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY-2021-22.pdf26 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY-2022-23.pdf26 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report_2022-23.pdf26 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY-2023-24.pdf26 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit Report_2023-24.pdf26 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QPR March 2024 Architect - converted.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QPR JUNE 2024 architects - converted.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QPR september 2024 architect - converted.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BSR B FORM 1 DEC 2023 20240116_17394059.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BSR FORM 2 DEC 2023 20240122_13005174.pdf6 Feb 2024
Certificates of CA (Form 3)File: BSR FORM 3 ATTESTED_11zon.pdf6 Feb 2024
Other - FinanceFile: Details of encumbrances BSR 20231202_18235824.pdf2 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE JUNE.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE SEP.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BSR FORM 2 JUNE 2023 compressed.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BSR FORM 2 SEP 2023 compressed.pdf20 Oct 2023
Certificates of CA (Form 3)File: SEP 23 FORM 3_compressed (1).pdf20 Oct 2023
Certificates of CA (Form 3)File: JUNE FORM 3_compressed.pdf20 Oct 2023
Certificates of CA (Form 3)File: BSR FROM 3 MARCH 2023_compressed.pdf3 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BSR FROM 1 SEP 2022.pdf24 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BSR FROM 1 DEC 2022.pdf24 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BSR MARCH FROM 1 2023.pdf24 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BSR FROM NO 2 SEP 2022.pdf24 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BSR FROM 2 DEC 2022.pdf24 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BSR FROM NO 2 MARCH 2023.pdf24 May 2023
Certificates of CA (Form 3)File: BSR FROM 3 SEP 2022 20230523_17422748_compressed.pdf24 May 2023
Certificates of CA (Form 3)File: BSR FROM 3 DEC 2022 20230523_17411187_compressed.pdf24 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: BSR FROM 5 F Y 21-22.pdf28 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BSR Declaration about seperate bank account.pdf17 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 BSR DEC 2021.pdf13 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 BSR APRIL.pdf13 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 BSR JUNE 20222.pdf13 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 BSR DEC 2021 compressed.pdf13 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: from 2 BSR MARCH 22.pdf13 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: from 2 BSR JUNE 2022.pdf13 Jul 2022
Certificates of CA (Form 3)File: FROM 3 BSR DEC 2021 FINAL Compressed.pdf13 Jul 2022
Certificates of CA (Form 3)File: FROM 3 MARCH 2022 BSR compressed.pdf13 Jul 2022
Certificates of CA (Form 3)File: FROM 3 JUNE 2022 BSR.pdf13 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC D WING BSR 25-12-2021 (1).pdf16 Feb 2022
Details of encumbrancesFile: Encumbrance Letter BSR.pdf28 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FROM 2A C WING 31-3-2021.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FROM 2A D WING 31-3-2021.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FROM 2A C WING 31-12-2020.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FROM 2A D WING 31-12-2020.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FROM 2A D WING 30-9-2021.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM 2A C WING 30-6-2021.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM 2A D WING 30-6-2021.pdf15 Nov 2021
Disclosure of sold/ booked inventoryFile: bhawani shankar sold or booked inventory -ok.pdf15 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020 sign 3.pdf15 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021sign 2.pdf15 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FROM 2A C WING 30-9-2021.pdf15 Nov 2021

How this compares with Thane

87%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHAWANI SHANKAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR7,600+ in Thane

2 kmBHAWANI SHANKAR RESIDENCCompleted 39Lapsed / revoked 30Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: BHAWANI SHANKAR RESIDENCY

BHAWANI SHANKAR RESIDENCY has 1 registration on MahaRERA, including BHAWANI SHANKAR RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if BHAWANI SHANKAR RESIDENCY is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHAWANI SHANKAR RESIDENCY?

The registered promoter entity is BHAWANI SHANKAR RESIDENCY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHAWANI SHANKAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHAWANI SHANKAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHAWANI SHANKAR RESIDENCY?

The professionals named in the filing: Architect: Mangesh M Agivale; Engineer: ATUL KUDTARKAR; Chartered Accountant: C A ASHWINI PRABHU; Chartered Accountant: CA AMRRITA JAGNAANI; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHAWANI SHANKAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHAWANI SHANKAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHAWANI SHANKAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.