Home / Browse projects / Thane, Maharashtra / BHAWANI SHANKAR HEIGHTS WING-C

Registered No litigation declared Residential / Group Housing project

BHAWANI SHANKAR HEIGHTS WING-C

By BHAWANI SHANKAR BUILDERS & DEVELOPERS

RG-MH-62690 · RERA P51700031599 · Last updated on MahaRERA portal: 25 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

BHAWANI SHANKAR HEIGHTS WING-C is a Residential / Group Housing project by BHAWANI SHANKAR BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700031599 on 31 Oct 2021. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameBHAWANI SHANKAR HEIGHTS WING-C
  • TypeResidential / Group Housing
  • Location
    • Sonivali
    • Badlapur West
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700031599
  • ReraGenie IDRG-MH-62690

Builder

  • NameBHAWANI SHANKAR BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersKAMALADEVI PREMSUKH GATTANI, TEENADEVI SANTOSHKUMAR GATTANI
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2021PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHAWANI SHANKAR HEIGHTS C WINGNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

BHAWANI SHANKAR HEIGHTS C WING: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 25 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area350 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1028.46
Proposed, not sanctioned1,028 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBadlapur East

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRaj Associates
EngineerAtul Kudtarkar & Associates
Chartered AccountantCA Ashwini Prabhu
Chartered AccountantCA AMRRITA JAGNAANI
PartnerRole in project
BHAWANI SHANKAR BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jan to March 2024 form 1 C wing.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: April to june 2024 form 1 C wing.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BSBD C FORM 1 DEC 2023 20240116_17424344.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BSBD C FORM 2 DEC 2023 20240116_17412315.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 WITH ATTESTED.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 C WING.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHIRECT CERTIFICATE JUNE-23.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE SEP 23.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNERS CERTIFICATE JUNE-23.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNERS CERTIFIACTE SEP-23.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY C WING 20231006_13184882.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY C WING 20231006_13184882.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration ON LETTER HEAD.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 C WING DEC 2022.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 C WING MAR 2023.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BSBD FORM 2 DEC 2022 C WING.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BSBD FORM 2 MAR 2023 C WING.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BSBD FORM 3 DEC 22 C WING.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BSBD FORM 3 MARCH 23 C WING.pdf12 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- bhawani shankar Builders and Developers-2022 final.pdf28 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BSBD Declaration about seperate bank account.pdf17 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 SONIVALI DEC 2021.pdf8 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 BSBD MARCH 2022.pdf8 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 JULY 2022 BSBD 2022072116595064.pdf8 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 SEP 2022 BSBD 2022111217071183 C WING.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 DEC 2021 C WING BSBD2022071512343055.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 MARCH 2022 C WING BSBD.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM NO 2 CWING JUNE.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 C WING FINAL 17-11-22 SONIVALI 2022111718061493.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: bhawani Shankar form 3 c wing_compressed.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: bhawani bd form 3 C Wing June 22 compressed.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 2 MARCH 2022 C WING BSBD.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 BSBD JUNE 20222022072514082309.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 DEC BSBD 20222022071913243572.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 MARCH 2022 BSBD 2022072012212957.pdf8 Feb 2023
Proforma of Allotment letterFile: Agreement Draft - BSBD.pdf16 Feb 2022
Details of encumbrancesFile: Encumbrance Letter BSBD.pdf3 Feb 2022
Building plan approvalFile: NA Order bhawani shankar hights .pdf20 Oct 2021
Copy of the legal title reportFile: NEW TITLE CIRCULAR NO 2B SONIVALI 16-10-2021 (1).pdf20 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: NA Order bhawani shankar hights .pdf20 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCITECT -FORM 1 27-9-2021 C WING.pdf20 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Form 2_compressed.pdf20 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- sep 2021.pdf20 Oct 2021
Declaration about Commencement CertificateFile: sonivali from D- Commencement.pdf19 Oct 2021
Proforma of Allotment letterFile: rera sale draft.pdf19 Oct 2021
Copy of the legal title reportFile: new title report sonivali 16-10-2021_compressed.pdf18 Oct 2021
Details of encumbrancesFile: NON ENCUMBRANCES CERTIFICATE 20211007_17381339.pdf18 Oct 2021
Declaration in FORM BFile: FROM B SONIVALI_compressed.pdf7 Oct 2021
Layout approvalFile: SONIVALI BLUEPRINT 1- compressed.pdf5 Oct 2021
Copy of Layout Approval (in case of layout)File: SONIVALI BLUEPRINT 1- compressed.pdf5 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Oct 2021
PAN CardFile: bhawani shankar builders and developers PAN.pdf1 Oct 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHAWANI SHANKAR HEIGHTS WING-C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Badlapur West7,600+ in Thane

Builder: BHAWANI SHANKAR BUILDERS & DEVELOPERS

BHAWANI SHANKAR BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including BHAWANI SHANKAR HEIGHTS WING-C and BHAWANI SHANKAR HEIGHTS B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if BHAWANI SHANKAR HEIGHTS WING-C is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHAWANI SHANKAR HEIGHTS WING-C?

The registered promoter entity is BHAWANI SHANKAR BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHAWANI SHANKAR HEIGHTS WING-C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHAWANI SHANKAR HEIGHTS WING-C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHAWANI SHANKAR HEIGHTS WING-C?

The professionals named in the filing: Architect: Raj Associates; Engineer: Atul Kudtarkar & Associates; Chartered Accountant: CA Ashwini Prabhu; Chartered Accountant: CA AMRRITA JAGNAANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHAWANI SHANKAR HEIGHTS WING-C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHAWANI SHANKAR HEIGHTS WING-C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHAWANI SHANKAR HEIGHTS WING-C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.