Completed No litigation declared Others project

BHALCHANDRA AKASHVAN

By SAMARTH CHINTAMANI PROPERTIES

RG-MH-23187 · RERA P52100033049 · Last updated on MahaRERA portal: 14 Oct 2024

Source: official MahaRERA filing

Red flags

  • 25 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
11 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 95%
25Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

BHALCHANDRA AKASHVAN is a Others project by SAMARTH CHINTAMANI PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100033049 on 3 Feb 2022. The registration is recorded completed; possession was promised by 31 Mar 2025. 25 complaints are on record with the regulator.

At a glance

Project

  • NameBHALCHANDRA AKASHVAN
  • TypeOthers
  • Location
    • SR NO 14/7
    • BEHIND BHONDVE ESTATE
    • PANDHARE WASTI ROAD
    • PUNAWALE
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033049
  • ReraGenie IDRG-MH-23187

Builder

  • NameSAMARTH CHINTAMANI PROPERTIES
  • Entity typePartnership
  • PartnersDEEPAK SURESH LANDGE, SUDHIR BALASAHEB LANDE, GEETANJALI AMAR LANDGE, NARENDRA DNYANESHESHWAR LANDGE
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2022PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Feb 2022
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA260000
WING BNA260000
WING CNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

WING A59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
WING B68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
WING C81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 14 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed151

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots151
Closed/Covered151
BuildingClosed/CoveredTotal
WING A7575
WING B11
WING C7575

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI33787.5
Proposed, not sanctioned11,293 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr Flr, MEZZANINE BHUMI SIDHI, PLOT NO IC 1 4, SECTOR, NO 32A RAVET, PUNE, MAHARASHTRA, 411014

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISHAL BAFANA
EngineerRAVINDRA A. KARNAVAT
Chartered AccountantVINIT D ACHHA AND ASSOCIATES
PartnerRole in project
SAMARTH CHINTAMANI PROPERTIES-

Litigation declared1

CaseCourtStatus
751/2023Civil Judge Senior Division PunePending

Complaints filed with MahaRERA25

Case no.ComplainantRespondentFiled
CC005000000177898Dineshbhai Premjibhai PatelSamarth Chintamani Properties07/12/2022
CC005000000269468Dineshbhai Premjibhai PatelSamarth Chintamani Properties19/09/2023
CC12400743MR. KARTIK KUMAR PATELSAMARTH CHINTAMANI PROPERTIES12/11/2024
CC12400744Mrs. Kinjalben Kartik Kumar PatelSAMARTH CHINTAMANI PROPERTIES12/11/2024
CC12400746Mr. Krunalkumar PatelSAMARTH CHINTAMANI PROPERTIES12/11/2024
CC12400747Roshaniben Krunalkumar PatelSAMARTH CHINTAMANI PROPERTIES12/11/2024
CC12400748CHIRAGKUMAR NATVARBHAI PATELSAMARTH CHINTAMANI PROPERTIES12/11/2024
CC12400766Bhupen PatelSAMARTH CHINTAMANI PROPERTIES13/11/2024
CC12400775Maya Punit PatelSAMARTH CHINTAMANI PROPERTIES14/11/2024
CC12400773Mr. Shantilal Arjun PatelSAMARTH CHINTAMANI PROPERTIES14/11/2024
CC12400774Mrs. VANMALA SHANTILAL PATELSAMARTH CHINTAMANI PROPERTIES14/11/2024
CC12400772Mr. Punit Vijay PatelSAMARTH CHINTAMANI PROPERTIES14/11/2024
CC12401155Rhythm Civil Expertise Through Vasant PatelSAMARTH CHINTAMANI PROPERTIES17/12/2024
CC12401156Rhythm Civil Expertise Through Vasant PatelSAMARTH CHINTAMANI PROPERTIES17/12/2024
CC12401158Rhythm Civil Expertise Through Vasant PatelSAMARTH CHINTAMANI PROPERTIES17/12/2024
CC12401159Rhythm Civil Expertise Through Vasant PatelSAMARTH CHINTAMANI PROPERTIES17/12/2024
CC12401160Rhythm Civil Expertise Through Vasant PatelSAMARTH CHINTAMANI PROPERTIES17/12/2024
CC12401161Rhythm Civil Expertise Through Vasant PatelSAMARTH CHINTAMANI PROPERTIES17/12/2024
CC12401162Rhythm Civil Expertise Through Vasant PatelSAMARTH CHINTAMANI PROPERTIES17/12/2024
CC12401163Rhythm Civil Expertise Through Vasant PatelSAMARTH CHINTAMANI PROPERTIES17/12/2024
CC12400783Mr. Nitish Vijay PatelSAMARTH CHINTAMANI PROPERTIES15/11/2024
CC12400784Bhavika PatelSAMARTH CHINTAMANI PROPERTIES15/11/2024
CC12401179Mr. Sulabh Maganbhai PatelSAMARTH CHINTAMANI PROPERTIES19/12/2024
CC12401180Mrs Jyoti Vijay PatelSAMARTH CHINTAMANI PROPERTIES19/12/2024
CC12500332NARSINH ARJUN PATELSAMARTH CHINTAMANI PROPERTIES30/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Mar 2024

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: Final Form 4 10-04-2024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf9 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: akashvan full completion_1.pdf8 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1.PDF15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.PDF15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf30 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf23 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AakashVan Part completion 20-09-2023.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A 22-23.pdf4 Sep 2023
Details of encumbrancesFile: Akashvan No enc.pdf28 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Annexure D.pdf21 Aug 2023
Copy of the legal title reportFile: New LEGAL TITLE REPORT 31-01-2023.pdf31 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Akashvan_Rera from 1_compressed.pdf19 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM - 5.pdf19 Dec 2022
Copy of the legal title reportFile: SRTLKJ.pdf18 Dec 2022
Copy of the legal title reportFile: STRKNT_compressed.pdf18 Dec 2022
Details of encumbrancesFile: Samarth Chintamani.pdf5 Dec 2022
CERSAI detailsFile: Cersai Report bhalchandra Akashvan.pdf5 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Samarth Chintamani Properties Form A.pdf5 Dec 2022
Proforma of Allotment letterFile: DRAFT2_compressed.pdf10 Jun 2022
Copy of the legal title reportFile: Title and Search Report 20-01-2022- UPDATED.pdf20 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Commecement_Certificate_compressed-1-2[1].pdf17 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Commecement_Certificate_compressed-3-4[1].pdf17 Jan 2022
CERSAI detailsFile: Cresai Report.pdf17 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228206177_For_Asset_Based_Search_17_01_2022_13_13_15_869.pdf17 Jan 2022
Layout approvalFile: EC_IOD COMPRESS.pdf14 Jan 2022
Layout approvalFile: Plan 8.pdf14 Jan 2022
Building plan approvalFile: Plan 2.pdf14 Jan 2022
Building plan approvalFile: Plan 6.pdf14 Jan 2022
Building plan approvalFile: Plan 3.pdf14 Jan 2022
Building plan approvalFile: Plan 5.pdf14 Jan 2022
Building plan approvalFile: Plan 7.pdf14 Jan 2022
Building plan approvalFile: Plan 2.pdf14 Jan 2022
PAN CardFile: FIRM PAN.pdf14 Jan 2022
Details of encumbrancesFile: Encumbrance Declaration.pdf14 Jan 2022
Copy of Layout Approval (in case of layout)File: EC_IOD COMPRESS.pdf14 Jan 2022
Copy of Layout Approval (in case of layout)File: Plan 8.pdf14 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf14 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf14 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf14 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf14 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf14 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf14 Jan 2022
Declaration about Commencement CertificateFile: C C Declaration.pdf14 Jan 2022
Declaration in FORM BFile: Form B Akashvan.pdf14 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -.pdf14 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3_compressed.pdf14 Jan 2022
Proforma of Allotment letterFile: Allotment Letter.pdf14 Jan 2022
Proforma of Allotment letterFile: Agreement draft 1.pdf14 Jan 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHALCHANDRA AKASHVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNAWALE13,700+ in Pune

2 kmBHALCHANDRA AKASHVANCompleted 94Lapsed / revoked 29Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 231 registered projects within 2 km.

Builder: SAMARTH CHINTAMANI PROPERTIES

SAMARTH CHINTAMANI PROPERTIES has 4 registrations on MahaRERA, including BHALCHANDRA VATIKA and BHALCHANDRA UPVAN PHASE - I. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BHALCHANDRA AKASHVAN is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHALCHANDRA AKASHVAN?

The registered promoter entity is SAMARTH CHINTAMANI PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHALCHANDRA AKASHVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BHALCHANDRA AKASHVAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BHALCHANDRA AKASHVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHALCHANDRA AKASHVAN?

The professionals named in the filing: Architect: VISHAL BAFANA; Engineer: RAVINDRA A. KARNAVAT; Chartered Accountant: VINIT D ACHHA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHALCHANDRA AKASHVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHALCHANDRA AKASHVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHALCHANDRA AKASHVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.