Home / Browse projects / Pune, Maharashtra / Bhakti Shrinidhi
Bhakti Shrinidhi
RG-MH-73907 · RERA P52100051298 · Last updated on MahaRERA portal: 10 Dec 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 8 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Bhakti Shrinidhi is a Residential / Group Housing project by BHAKTI BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100051298 on 8 Jun 2023. The registration is recorded completed; possession was promised by 30 Sep 2025. 8 of the 19 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameBhakti Shrinidhi
- TypeResidential / Group Housing
- Location
- Shridhar nagar
- Chinchwad
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051298
- ReraGenie IDRG-MH-73907
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Jun 2023
- Promised completion30 Sep 2025
- Revised completionNone
- Buildings1 building record
- Documents filed92 files
Current status
Figures as on 10 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bhakti Shrinidhi | NA | 8 | 6 | 19 | 0 | 19 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Bhakti Shrinidhi: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Komal Apartment Condominium | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Bhakti Shrinidhi | NA | Rs 4.50 cr | Rs 4.05 cr |
| - | NA | Rs 25.00 lakh | Rs 22.50 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | I P ASSOCIATES |
| Engineer | RAHUL DAKH |
| Chartered Accountant | Bang & Associates |
| Chartered Accountant | PGMJ AND ASSOCIATES |
| Chartered Accountant | NITISH VAIDYA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| BHAKTI BUILDERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Verification of O.C..pdf | 10 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 BS 20082025 .pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2-BS-30092025.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: FORM-3-BS-09102025.pdf | 14 Oct 2025 |
| Withdrawal Update Form 1File: BS-FORM1-12072025_0001.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Final.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Final.pdf | 11 Oct 2025 |
| Occupational CertificateFile: Bhakti Shrinidhi Completion Certificate Scan_.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Final.pdf | 25 Sep 2025 |
| Form 2A (FY 2024-2025)File: BS Form 2A.pdf | 15 Sep 2025 |
| Form 2A (FY 2023-2024)File: BS-Form 2A-2023-24.pdf | 15 Sep 2025 |
| Form 2A (FY 2025-2026)File: BS-Form-2A-2025-26.pdf | 15 Sep 2025 |
| Form 1File: Form 1.pdf | 20 Jul 2025 |
| Form 2File: Form 2.pdf | 20 Jul 2025 |
| Form 3File: Final Form 3.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Bhakti Shrinidhi - Sold Booked Inventory -31-03-2025-Scan_0001.pdf | 20 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (1).pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Bhakti Shrinidhi - Sold Booked Inventory -31-03-2025-Scan_0001.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf | 19 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Upload.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-BS-300924_0001.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q2 24-25)-Bhakti Shrinidhi.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form2-BS-300924_0001.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: BS-SC-300924_0001.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: BS Sold Circular.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final PS signed_compressed.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BS Form 2 as on 30062023.pdf | 10 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BS Form 2 as on 30092023.pdf | 10 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BS Form 2 as on 31122023.pdf | 10 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BS Form 2 as on 31032024.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final form 1.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final form 1.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf | 7 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: BHAKTI SHRINIDHI ENGINEERS CERTIFICATE Scan_0001.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Bhakti Shrinidhi.pdf | 17 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 bhakti shrinidhi.pdf | 17 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bhakti Shrinidhi.pdf | 17 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Bhakti shrinidhi.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 bhaktishrinidhi300623.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 bhakshishrinidhi300923.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 bhaktishrinidhi311223.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 bhakti shrinidhi31324.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular.pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q1 23-24).pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q2 23-24).pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q3 23-24).pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q4 23-24).pdf | 17 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bhakti Shrinidhi Architect certificate Form 1 31-12-2024.pdf | 25 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bhakti Shrinidhi Engineer certificate Form 2 - 31-12-2024.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhakti Shrinidhi CA Certificate Form 3 - 31-12-2024.pdf | 25 Apr 2024 |
| Layout approvalFile: Bhakti Shrinidhi Sanction plan 1.pdf | 2 Apr 2024 |
| Building plan approvalFile: Bhakti Shrinidhi Sanction plan 2.pdf | 2 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Bhakti Shrinidhi Sanction plan 1.pdf | 2 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Bhakti Shrinidhi Sanction plan 2.pdf | 2 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Bhakti Shrinidhi Commencement Certificate.pdf | 2 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: new scan copy declaration about separate bank.pdf | 25 May 2023 |
| Copy of the legal title reportFile: komal legal title report.pdf | 20 May 2023 |
| Details of encumbrances concerned to FinanceFile: encumbrance financial - shrinidhi.pdf | 20 May 2023 |
| Details of encumbrances concerned to FinanceFile: encumbrance legal-shrinidhi.pdf | 20 May 2023 |
| Details of encumbrances concerned to LegalFile: encumbrance financial - shrinidhi.pdf | 20 May 2023 |
| Details of encumbrances concerned to LegalFile: encumbrance legal-shrinidhi.pdf | 20 May 2023 |
| Declaration about Commencement CertificateFile: declaration about CC shrinidhi.pdf | 20 May 2023 |
| CERSAI detailsFile: undertaking for CERSAI- shrinidhi.pdf | 20 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclouser of interest - shrinidhi.pdf | 20 May 2023 |
| Proforma of Allotment letterFile: model form of allotment - shrinidhi_compressed.pdf | 20 May 2023 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Harmony Homes | Akurdi | 1 | Completed | Mar 2022 | Apr 2021 |
| Arihant Heights | Mohannagar | 1 | Completed | Dec 2019 | Oct 2019 |
| Anand Heritage | Jeevan nagar Chinchwad | 1 | Completed | Sep 2017 | Jul 2017 |
| High Bliss | Akurdi | 1 | Completed | Dec 2014 | Jun 2014 |
| Sangam Heritage | Bhoir Colony Chinchwad | 1 | Completed | Dec 2012 | Oct 2012 |
| Atharva Heritage | Chinchwad | 1 | Completed | Feb 2012 | Jan 2012 |
| Heramb Heights | Tanajinagar | 1 | Completed | Dec 2011 | Nov 2011 |
| Prime Villa | Pradikaran | 1 | Completed | Jan 2011 | Jan 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
Keep Bhakti Shrinidhi on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chinchwad13,700+ in Pune
Filed coordinates, straight-line distance. 130 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: BHAKTI BUILDERS
BHAKTI BUILDERS has 7 registrations on MahaRERA, including Alok Heritage and ELYSIA TOWERS. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Bhakti Shrinidhi is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Bhakti Shrinidhi?
The registered promoter entity is BHAKTI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Bhakti Shrinidhi?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Bhakti Shrinidhi?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Bhakti Shrinidhi?
The professionals named in the filing: Architect: I P ASSOCIATES; Engineer: RAHUL DAKH; Chartered Accountant: Bang & Associates; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bhakti Shrinidhi?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback