Home / Browse projects / Pune, Maharashtra / Bhakti Shrinidhi

Completed No litigation declared Residential / Group Housing project

Bhakti Shrinidhi

By BHAKTI BUILDERS

RG-MH-73907 · RERA P52100051298 · Last updated on MahaRERA portal: 10 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 8 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
11 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Bhakti Shrinidhi is a Residential / Group Housing project by BHAKTI BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100051298 on 8 Jun 2023. The registration is recorded completed; possession was promised by 30 Sep 2025. 8 of the 19 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameBhakti Shrinidhi
  • TypeResidential / Group Housing
  • Location
    • Shridhar nagar
    • Chinchwad
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051298
  • ReraGenie IDRG-MH-73907

Builder

  • NameBHAKTI BUILDERS
  • Entity typePartnership
  • PartnersYash Kishor Firodiya, Sangita Kishor Firodiya
  • Other registrations6 more →
  • Completed4 of 7
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredJun 2023PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Jun 2023
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

42%8 of 19 units booked
90.0%Work done, per cost certificate

Figures as on 10 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bhakti ShrinidhiNA8619019

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Bhakti Shrinidhi: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area511 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025
LandownerVillageDistrict
Komal Apartment CondominiumPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI1653.66
Proposed, not sanctioned1,634 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPPOSITE RAMKRISHNA SABHAGRUH CHINCHWAD PUNE 411033
Estimated costRs 4.75 cr
Cost incurredRs 4.28 cr
Work done90.0%
BuildingWingEstimatedIncurred
Bhakti ShrinidhiNARs 4.50 crRs 4.05 cr
-NARs 25.00 lakhRs 22.50 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectI P ASSOCIATES
EngineerRAHUL DAKH
Chartered AccountantBang & Associates
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
BHAKTI BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Verification of O.C..pdf10 Dec 2025
Withdrawal Update Form 1File: Form 1 BS 20082025 .pdf14 Oct 2025
Withdrawal Update Form 2File: FORM-2-BS-30092025.pdf14 Oct 2025
Withdrawal Update Form 3File: FORM-3-BS-09102025.pdf14 Oct 2025
Withdrawal Update Form 1File: BS-FORM1-12072025_0001.pdf11 Oct 2025
Withdrawal Update Form 2File: Form 2 Final.pdf11 Oct 2025
Withdrawal Update Form 3File: Form 3 Final.pdf11 Oct 2025
Occupational CertificateFile: Bhakti Shrinidhi Completion Certificate Scan_.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 Final.pdf25 Sep 2025
Form 2A (FY 2024-2025)File: BS Form 2A.pdf15 Sep 2025
Form 2A (FY 2023-2024)File: BS-Form 2A-2023-24.pdf15 Sep 2025
Form 2A (FY 2025-2026)File: BS-Form-2A-2025-26.pdf15 Sep 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Final Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Bhakti Shrinidhi - Sold Booked Inventory -31-03-2025-Scan_0001.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (1).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Bhakti Shrinidhi - Sold Booked Inventory -31-03-2025-Scan_0001.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Upload.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-BS-300924_0001.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q2 24-25)-Bhakti Shrinidhi.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form2-BS-300924_0001.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: BS-SC-300924_0001.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: BS Sold Circular.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final PS signed_compressed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BS Form 2 as on 30062023.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BS Form 2 as on 30092023.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BS Form 2 as on 31122023.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BS Form 2 as on 31032024.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final form 1.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final form 1.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf7 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: BHAKTI SHRINIDHI ENGINEERS CERTIFICATE Scan_0001.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Bhakti Shrinidhi.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 bhakti shrinidhi.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bhakti Shrinidhi.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Bhakti shrinidhi.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 bhaktishrinidhi300623.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 bhakshishrinidhi300923.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 bhaktishrinidhi311223.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 bhakti shrinidhi31324.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q1 23-24).pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q2 23-24).pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q3 23-24).pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q4 23-24).pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bhakti Shrinidhi Architect certificate Form 1 31-12-2024.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bhakti Shrinidhi Engineer certificate Form 2 - 31-12-2024.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhakti Shrinidhi CA Certificate Form 3 - 31-12-2024.pdf25 Apr 2024
Layout approvalFile: Bhakti Shrinidhi Sanction plan 1.pdf2 Apr 2024
Building plan approvalFile: Bhakti Shrinidhi Sanction plan 2.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Bhakti Shrinidhi Sanction plan 1.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Bhakti Shrinidhi Sanction plan 2.pdf2 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Bhakti Shrinidhi Commencement Certificate.pdf2 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: new scan copy declaration about separate bank.pdf25 May 2023
Copy of the legal title reportFile: komal legal title report.pdf20 May 2023
Details of encumbrances concerned to FinanceFile: encumbrance financial - shrinidhi.pdf20 May 2023
Details of encumbrances concerned to FinanceFile: encumbrance legal-shrinidhi.pdf20 May 2023
Details of encumbrances concerned to LegalFile: encumbrance financial - shrinidhi.pdf20 May 2023
Details of encumbrances concerned to LegalFile: encumbrance legal-shrinidhi.pdf20 May 2023
Declaration about Commencement CertificateFile: declaration about CC shrinidhi.pdf20 May 2023
CERSAI detailsFile: undertaking for CERSAI- shrinidhi.pdf20 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclouser of interest - shrinidhi.pdf20 May 2023
Proforma of Allotment letterFile: model form of allotment - shrinidhi_compressed.pdf20 May 2023

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Harmony HomesAkurdi1CompletedMar 2022Apr 2021
Arihant HeightsMohannagar1CompletedDec 2019Oct 2019
Anand HeritageJeevan nagar Chinchwad1CompletedSep 2017Jul 2017
High BlissAkurdi1CompletedDec 2014Jun 2014
Sangam HeritageBhoir Colony Chinchwad1CompletedDec 2012Oct 2012
Atharva HeritageChinchwad1CompletedFeb 2012Jan 2012
Heramb HeightsTanajinagar1CompletedDec 2011Nov 2011
Prime VillaPradikaran1CompletedJan 2011Jan 2011

How this compares with Pune

42%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhakti Shrinidhi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chinchwad13,700+ in Pune

2 kmBhakti ShrinidhiCompleted 48Lapsed / revoked 35Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 130 registered projects within 2 km.

Builder: BHAKTI BUILDERS

BHAKTI BUILDERS has 7 registrations on MahaRERA, including Alok Heritage and ELYSIA TOWERS. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Bhakti Shrinidhi is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhakti Shrinidhi?

The registered promoter entity is BHAKTI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhakti Shrinidhi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bhakti Shrinidhi?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bhakti Shrinidhi?

The professionals named in the filing: Architect: I P ASSOCIATES; Engineer: RAHUL DAKH; Chartered Accountant: Bang & Associates; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bhakti Shrinidhi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhakti Shrinidhi. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhakti Shrinidhi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.