Home / Browse projects / Nashik, Maharashtra / BHAGIRATH PARK
BHAGIRATH PARK
RG-MH-52531 · RERA P51600049007 · Last updated on MahaRERA portal: 8 May 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 15 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BHAGIRATH PARK is a Residential / Group Housing project by SHREE CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600049007 on 24 Jan 2023. Possession is promised by 31 Oct 2026. 71 of the 71 units on this registration are recorded sold or booked, and 7 of 77 construction stages are filed complete.
At a glance
Project
- NameBHAGIRATH PARK
- TypeResidential / Group Housing
- Location
- SATPUR AMBAD LINK ROAD
- SR CTS GAT NO 450/1/1 SATPUR
- Nashik (M Corp.)
- Nashik
- 422007
- Pincode422007
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600049007
- ReraGenie IDRG-MH-52531
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2023
- Promised completion31 Oct 2026
- Revised completionNone
- Buildings7 building records
- Documents filed86 files
Current status
Figures as on 8 May 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BHAGIRATH PARK TYPE A BUILDING | NA | 1 | 1 | 14 | 0 | 14 |
| BHAGIRATH PARK TYPE B BUILDING | NA | 1 | 1 | 13 | 0 | 13 |
| BHAGIRATH PARK C TYPE BUILDING | NA | 1 | 1 | 12 | 0 | 12 |
| BHAGIRATH PARK D TYPE BUILDING | NA | 1 | 1 | 15 | 0 | 15 |
| BHAGIRATH PARK E TYPE BUILDING | NA | 1 | 1 | 14 | 0 | 14 |
| BHAGIRATH PARK F TYPE BUILDING | NA | 1 | 1 | 3 | 0 | 3 |
| BHAGIRATH PARK G TYPE BUILDING | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 8 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Basement (if any), at 80%.
BHAGIRATH PARK TYPE A BUILDING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGIRATH PARK TYPE B BUILDING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGIRATH PARK C TYPE BUILDING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGIRATH PARK D TYPE BUILDING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGIRATH PARK E TYPE BUILDING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGIRATH PARK F TYPE BUILDING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGIRATH PARK G TYPE BUILDING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 8 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANOJ GUPTA |
| Engineer | ANIL N YEOLA |
| Chartered Accountant | SANDEEP PATIL SHANKAR PATIL |
| Partner | Role in project |
|---|---|
| SHREE CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Sep 2023
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE AS ON 31-03-2024_11zon.pdf | 8 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE AS ON 31-03-2024_11zon.pdf | 8 May 2024 |
| Disclosure of sold/ booked inventoryFile: SHREE CONSTRUCTION SOLD INVENTORY _11zon.pdf | 8 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACertificate As On 31-12-2023_11zon.pdf | 8 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ANNUAL REPORTS STATEMENTS CA CERTIFICATE compress.pdf | 8 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 ARCHCERTIFICATE31122023_11zon.pdf | 14 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 ENGGCERTIFICATE31122023_11zon.pdf | 14 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 04 SOLDUNSOLDINVENTORY_11zon.pdf | 14 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 CACERTIFICATE31122023_11zon.pdf | 14 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New form3 29-12-2023_11zon.pdf | 4 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD BOOK INVENTORY_11zon.pdf | 29 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New form3 29-12-2023_11zon.pdf | 29 Dec 2023 |
| Declaration about Commencement CertificateFile: FORMAT D.pdf | 23 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2023.pdf | 23 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2023.pdf | 23 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-09-2023.pdf | 23 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf | 23 Dec 2023 |
| Status of ConveyanceFile: Declaration 1.pdf | 23 Dec 2023 |
| Status of ConveyanceFile: Declaration 2.pdf | 23 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 FORM 1 Architect Certificate March.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JUNE 2023 FORM 08-12-2023.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 SEPT 2023 NEW.pdf | 8 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE JUNE 2023_11zon.pdf | 8 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 FORM 2 Engineers_Certificate_MARCH_2023.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 2023_11zon.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 2023_11zon.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 FORM 3 CA CERTIFICATE.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2023_11zon.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2023_11zon.pdf | 25 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 01 FORM 5 MARCH 2023.pdf | 25 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 JUNE 2023.pdf | 25 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SEPT 2023.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - COMPRESS_11zon.pdf | 16 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE-16-11-2023.pdf | 16 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: CA CERTIFICATE_11zon.pdf | 16 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CA CERTIFICATE.pdf | 16 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 4 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 4 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: CA certificate_11zon.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_11zon.pdf | 4 Sep 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: occupancy certificate.pdf | 4 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate organisation.pdf | 4 Jan 2023 |
| Other - FinanceFile: No Encumbrance Declaration.pdf | 28 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Declaration.pdf | 22 Nov 2022 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Declaration.pdf | 22 Nov 2022 |
| Declaration about Commencement CertificateFile: Annexure D 08-11-2022.pdf | 14 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf | 10 Nov 2022 |
| Proforma of Allotment letterFile: ANNEXURE_compressed.pdf | 10 Nov 2022 |
| Proforma of Agreement for saleFile: 000 Maha RERA Agreement to Sale - Bhagirath park.pdf | 10 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report.pdf | 10 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: Dated Deviation letter.pdf | 10 Nov 2022 |
| Layout approvalFile: Layout.pdf | 8 Oct 2022 |
| Building plan approvalFile: Commencement CERTIFICATE.pdf | 8 Oct 2022 |
| Building plan approvalFile: Building Plan 1.pdf | 8 Oct 2022 |
| Building plan approvalFile: Building Plan 2.pdf | 8 Oct 2022 |
| Building plan approvalFile: Building Plan 3.pdf | 8 Oct 2022 |
| Building plan approvalFile: Building Plan 4.pdf | 8 Oct 2022 |
| Building plan approvalFile: Building Plan 6.pdf | 8 Oct 2022 |
| Building plan approvalFile: Building Plan 7.pdf | 8 Oct 2022 |
| Building plan approvalFile: Building Plan 8.pdf | 8 Oct 2022 |
| PAN CardFile: PAN Firm.pdf | 8 Oct 2022 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 8 Oct 2022 |
| Copy of the legal title reportFile: Sale Deed Set 01.pdf | 8 Oct 2022 |
| Copy of the legal title reportFile: Sale Deed Set 02.pdf | 8 Oct 2022 |
| Copy of the legal title reportFile: Sale Deed Set 03.pdf | 8 Oct 2022 |
| Copy of the legal title reportFile: Sale Deed Set 04.pdf | 8 Oct 2022 |
| Copy of the legal title reportFile: Sale Deed Set 05.pdf | 8 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: LETTER FOR ENCUMBRANCES.pdf | 8 Oct 2022 |
| Details of encumbrances concerned to LegalFile: LETTER FOR ENCUMBRANCES.pdf | 8 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 8 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Commencement CERTIFICATE.pdf | 8 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf | 8 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf | 8 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf | 8 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4.pdf | 8 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 6.pdf | 8 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 7.pdf | 8 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 8.pdf | 8 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 8 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Tax Pavti.pdf | 8 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 15 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep BHAGIRATH PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SR CTS GAT NO 450/1/1 SATPUR4,100+ in Nashik
SHREE GANESH SRUSHTI
JYK NIRMITI INFRA LLP
BOLKAR MAJESTIC
GANESH TUKARAM BOLKAR
PALM TOWN
VAKRATUNDA PROPERTIES
Swaraj 1 and 2 BHK Homes
Kothawale Patil Builders And Developers Pv
HAPPY LIFE AT APNA GHAR PHASE V
M/S Shweta Infrastructure & Housing (I) Pv
Balaji Heights
Geeta Developers
See every Nashik project, with the district possession charts
Builder: SHREE CONSTRUCTION
SHREE CONSTRUCTION has 16 registrations on MahaRERA, including SHREE SEVAGIR BABA COMPLEX and SHREE PRATHAMESH PARK. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if BHAGIRATH PARK is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BHAGIRATH PARK?
The registered promoter entity is SHREE CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BHAGIRATH PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BHAGIRATH PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BHAGIRATH PARK?
The professionals named in the filing: Architect: MANOJ GUPTA; Engineer: ANIL N YEOLA; Chartered Accountant: SANDEEP PATIL SHANKAR PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BHAGIRATH PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback