Bellissimo Mulund T2

By Lodha Developers Limited

RG-MH-51601 · RERA P51800018893 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 6 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 60%
191 of 249Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Bellissimo Mulund T2 is a Residential / Group Housing project by Lodha Developers Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018893 on 11 Dec 2018. Possession is promised by 30 Jun 2027. The completion date has moved by 6 months from the original filing. 58 of the 249 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBellissimo Mulund T2
  • TypeResidential / Group Housing
  • Location
    • Gopal Krishna Gokhale Road
    • Mulund East
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800018893
  • ReraGenie IDRG-MH-51601

Builder

  • NameLodha Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • WtdRaunika Malhotra
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredDec 2018First promiseDec 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2018
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Dec 2026)
  • Buildings1 building record
  • Documents filed105 files

Current status

23%58 of 249 units booked
100.0%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T 2NA41412490249

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

T 2: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed354

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots354
Closed/Covered354

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area650 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI20000.3
Proposed, not sanctioned11,370 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNehru Centre, 9th Floor, Discovery of India, Dr A B Road, Worli Mumbai - 400018
Estimated costRs 172.87 cr
Cost incurredRs 172.87 cr
Work done100.0%
BuildingWingEstimatedIncurred
T 2NARs 112.36 crRs 112.36 cr
-NARs 60.50 crRs 60.50 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectPradeep M Kamble
EngineerK C Shah Consultants
EngineerShailendra Chauhan
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A & Associates
PartnerRole in project
Lodha Developers Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26062501740Dec 2026 → Jun 2027

Reason as filed by the promoterThe original planned timelines for completion of project increased due to delay in excavation. This delay was a result of discovery of hard rock and rising ground water level once the excavation crossed a depth of approx. 1.5 m thereby increasing the original timelines and efforts. Identification of source of rising ground water level and stopping it resulted in further delay of foundation works.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503391SANJAY ARUN PRABHULodha Developers Limited22/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Bellissimo Mulund T2 - P51800018893.pdf23 Jun 2026
Withdrawal Update Form 1File: Mulund T-2 Form-1 Mar-26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Lodha Regalia Tower 2 - Mar26.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 - Lodha Regalia Tower 2 - Mar26.pdf20 Apr 2026
Withdrawal Update Form 1File: Form-1 Mulunf T2 Dec-25.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 - Lodha Mulund Tower 2 - Dec 25.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 - Lodha Mulund Tower 2 - Dec 25.pdf23 Jan 2026
Withdrawal Update Form 1File: Form1 - P51800018893 - Bellissimo Mulund T2.pdf25 Oct 2025
Withdrawal Update Form 2File: Form 2 - Mulund Tower 2 - Sept 25.pdf25 Oct 2025
Withdrawal Update Form 3File: Form 3 - Mulund Tower 2 - Sept 25.pdf25 Oct 2025
Form 5 (FY 2024-2025)File: Bellissimo Mulund T2.pdf30 Sep 2025
Form 2A (FY 2024-2025)File: Bellissimo Mulund T2 - P51800018893 - Form 2A.pdf25 Jul 2025
Layout approvalFile: Layout.pdf19 Jul 2025
Commencement certificateFile: Details of Sold Unsold -Tower 2 - Jun-25.pdf19 Jul 2025
Commencement certificateFile: Updated CC.pdf19 Jul 2025
Form 1File: Form 1 Bellissimo Mulund T2 Mar-25.pdf28 May 2025
Form 2File: Form 2 - Mulund Tower 2 - Mar 25.pdf28 May 2025
Form 3File: Form 3 - Mulund Tower 2 - Mar 25.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Mulund Tower 2 - Mar 25.pdf28 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bellissimo Mulund T2.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Mulund Tower 2 - Mar 25.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mulund Tower 2 - Mar 25.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold - Mulund Tower 2 - Mar 25.pdf2 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Bellissimo Mulund T2.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bellissimo Mulund T2 - form 2.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Bellissimo Mulund T2 - Sold Unsold.pdf20 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: FCC 23-01-2025.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bellissimo Mulund T2.pdf24 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Bellissimo Mulund T2 - sep24.pdf13 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 3 - Bellissimo Mulund T2 - sep24.pdf13 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Bellissimo Mulund T2 - sep24.pdf13 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mulund T2.pdf4 Nov 2024
Building plan approvalFile: Ground Floor-rotated-1 - converted (2).pdf24 Oct 2024
Building plan approvalFile: Ground Floor-rotated-2 - converted (1).pdf24 Oct 2024
Building plan approvalFile: Ground Floor-rotated-3 - converted.pdf24 Oct 2024
Building plan approvalFile: Ground Floor-rotated-5 - converted.pdf24 Oct 2024
Building plan approvalFile: Ground Floor-rotated-6 - converted.pdf24 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bellissimo Mulund T2 - P51800018893 - June24.pdf24 Oct 2024
Building Plan Approval (IOD)File: Ground Floor-rotated-1 - converted (2).pdf24 Oct 2024
Building Plan Approval (IOD)File: Ground Floor-rotated-6 - converted.pdf24 Oct 2024
Building Plan Approval (IOD)File: Ground Floor-rotated-5 - converted.pdf24 Oct 2024
Building Plan Approval (IOD)File: Ground Floor-rotated-3 - converted.pdf24 Oct 2024
Building Plan Approval (IOD)File: Ground Floor-rotated-2 - converted (1).pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Bellissimo Mulund T2 (1).pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51800018893 - Bellissimo Mulund T2.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Bellissimo Mulund T2 - P51800018893.pdf17 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bellissimo Mulund T2 - P51800018893 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Bellissimo Mulund T2 - P51800018893 - June24.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Bellissimo Mulund T2 - P51800018893 - March 24.pdf6 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Bellissimo Mulund T2 - P51800018893 - March 24.pdf7 May 2024
Layout approvalFile: Mulund Layout.pdf30 Apr 2024
Copy of Layout Approval (in case of layout)File: Mulund Layout.pdf30 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Mulund - FCC - 26 Apr 2024.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 - Bellissimo Mulund T2 - P51800018893 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Bellissimo Mulund T2 - P51800018893 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Mulund t2_merged.pdf27 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bellissimo Mulund T2 - Form1 - Sep23.pdf21 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 2082_001.pdf25 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 RERA_Upper Nest P51800018893.pdf30 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Upper Nest-Tower A Sept 2021.pdf11 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Upper Nest-Tower A Sept 2021.pdf11 Nov 2021
Certificates of CA (Form 3)File: CA Cetificate Upper Nest Tower A Sept 2021.pdf11 Nov 2021
Certificates of CA (Form 3)File: CA Cetificate Upper Nest Tower A Sept 2021.pdf11 Nov 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory _ Upper Nest Tower A.pdf3 Nov 2021
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Upper Nest Tower A Sept 2021.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Upper Nest Tower A Sept 2021.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate Upper Nest Tower A Sept 2021.pdf9 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Upper Nest Tower A 30 June 2021.pdf25 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Upper Nest Tower A 30th June 2021.pdf25 Aug 2021
Form 2AFile: QA Certificate Upper Nest Tower A 30 June 2021.pdf25 Aug 2021
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Certificate Upper Nest Tower A 30 June 2021.pdf25 Aug 2021
Certificates of CA (Form 3)File: Form 3 RERA Arihant Construction Tower A.pdf25 Aug 2021
PAN CardFile: Arihant Construction Company_Pan Card (1).pdf24 Aug 2021
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Certificate Upper Nest Tower A.pdf24 Jul 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE - UPPER NEST TOWER A.pdf25 Jun 2021
Form 2AFile: QA Certificate - Upper Nest Tower A 2nd 30th June 2019.pdf27 Feb 2021
Form 2AFile: QA Certificate - Upper Nest Tower A 3rd 30th Sept 2019.pdf27 Feb 2021
Form 2AFile: QA Certificate - Upper Nest Tower A 4th 31st Dec 2019.pdf27 Feb 2021
Form 2AFile: QA Certificate - Upper Nest Tower A 5th 31st March 2020.pdf27 Feb 2021
Form 2AFile: QA Certificate - Upper Nest Tower A 6th 30th June 2020.pdf27 Feb 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, Thane140Mar 2022CompletedFeb 2026Jun 2024

How this compares with Mumbai Suburban

23%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bellissimo Mulund T2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund East6,700+ in Mumbai Suburban

2 kmBellissimo Mulund T2Completed 105Lapsed / revoked 92Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 330 registered projects within 2 km.

Builder: Lodha Developers Limited

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Bellissimo Mulund T2 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bellissimo Mulund T2?

The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bellissimo Mulund T2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Bellissimo Mulund T2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Bellissimo Mulund T2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bellissimo Mulund T2?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: Pradeep M Kamble; Engineer: K C Shah Consultants; Engineer: Shailendra Chauhan; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bellissimo Mulund T2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bellissimo Mulund T2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bellissimo Mulund T2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.