ReraGenieLog inGet a buyer report

Home / Browse projects / BAY VIEW APARTMENTS

Registered No litigation declared Others project

BAY VIEW APARTMENTS

By CHANDULAL JORAVARMALJI MEHTA

RG-MH-06723 · RERA P51900053863 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: .
Aug 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 55%
125 of 150Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

BAY VIEW APARTMENTS is a Others project by CHANDULAL JORAVARMALJI MEHTA in GIRGAUM, 400004, registered with MahaRERA as P51900053863 on 5 Dec 2023. Possession is promised by 31 Aug 2028. 25 of the 150 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameBAY VIEW APARTMENTS
  • TypeOthers
  • Location
    • RAJA RAM MOHAN ROY ROAD
    • GIRGAUM
    • 400004
  • Pincode400004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900053863
  • ReraGenie IDRG-MH-06723

Builder

  • NameCHANDULAL JORAVARMALJI MEHTA
  • Entity typeIndividual
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2023PromisedAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Dec 2023
  • Promised completion31 Aug 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

17%25 of 150 units booked
25.2%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BAY VIEW APARTMENTSNA373413020150

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 55%.

BAY VIEW APARTMENTS: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises41%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered112

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,264 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024
LandownerVillageDistrict
SURESHCHANDRA SHYAMLAL AGRAWALMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityBMC
Permissible FSI20649.49
Proposed, not sanctioned10,649 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo 2 B, Vaswani Chambers , Dr Annie Bezzant Road, Worli, Opp Old Passport Office , Mumbai 400030
Estimated costRs 114.21 cr
Cost incurredRs 28.77 cr
Work done25.19%
BuildingWingEstimatedIncurred
BAY VIEW APARTMENTSNARs 66.91 crRs 27.98 cr
-NARs 47.30 crRs 78.84 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHUDAWALA AND ASSOCIATES CHUDAWALA
EngineerSAMIULLAH KHAN
EngineerAPARNA DABAK
Chartered AccountantVAIBHAV PATIL
Chartered Accountantyashes Mehta
PartnerRole in project
CHANDULAL JORAVARMALJI MEHTA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2028

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: AMENDED IOD PLAN _compressed.pdf29 Jun 2026
Commencement certificateFile: AMENDED IOD LETTER .pdf29 Jun 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE - Q1 FY 25-26.pdf29 Jun 2026
Withdrawal Update Form 1File: ARCHITECTURE CERTIFICATE Q2 FY 25-26.pdf29 Jun 2026
Withdrawal Update Form 1File: Bay VIew DOC.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf29 Jun 2026
Withdrawal Update Form 2File: Engineers Certificate -Bay View Aprt-Q-1 FY 25-26.pdf29 Jun 2026
Withdrawal Update Form 2File: engg.PDF29 Jun 2026
Withdrawal Update Form 2File: engg.PDF29 Jun 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.pdf29 Jun 2026
Withdrawal Update Form 3File: Form3_Q1_FY2526_SHYAMSADAN_.pdf29 Jun 2026
Withdrawal Update Form 3File: FINAL CA CERTFICATE FORM 3 Q2 FY 25-26 BAY VIEW.pdf29 Jun 2026
Withdrawal Update Form 3File: CA CERTIFICATE RERA -Q-3 FY 25-26 BAY VIEW APARTMENT.pdf29 Jun 2026
Withdrawal Update Form 3File: CA RERA CERTIFICATE.pdf29 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA CERTIFICATE BAY VIEW APRTS Q-4 FY 24-25_compressed.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE Q-4 FY 24-25 BAY VIEW APTS.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM_2 Q-4 FY 24-25 Shyam_Sadan.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate form 3 Bay View Apartment .pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architecture certificate bay view.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS FORM.pdf27 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A DECLARATION ABOUT RERA REGISTERED BANK AC FOR REAL ESTATE.pdf9 Jan 2025
Other - FinanceFile: declaration of ca certify loan.pdf9 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B AU BANK Mehta.pdf9 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE RERA.pdf9 Jan 2025
Proforma of Agreement for saleFile: draft RESIDENTIAL SALE AGREEMENT MERGE FILE - Copy.pdf6 Jan 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER TO RERA BAY VIEW PROJECT.pdf26 Dec 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER TO RERA BAY VIEW PROJECT.pdf26 Dec 2024
Proforma of Agreement for saleFile: NEW AOS RESIDENTIAL.pdf26 Dec 2024
Proforma of Agreement for saleFile: NEW AOS COMMERCIAL.pdf26 Dec 2024
Details of encumbrances concerned to FinanceFile: REG MORTGAGE DEED SHYAM SADAN_compressed-31-60.pdf18 Dec 2024
Details of encumbrances concerned to FinanceFile: REG MORTGAGE DEED SHYAM SADAN_compressed-61-103.pdf18 Dec 2024
Details of encumbrances concerned to FinanceFile: REG MORTGAGE DEED SHYAM SADAN_compressed-1-30.pdf18 Dec 2024
Details of encumbrances concerned to LegalFile: REG MORTGAGE DEED SHYAM SADAN_compressed-1-30.pdf18 Dec 2024
Details of encumbrances concerned to LegalFile: REG MORTGAGE DEED SHYAM SADAN_compressed-31-60.pdf18 Dec 2024
Details of encumbrances concerned to LegalFile: REG MORTGAGE DEED SHYAM SADAN_compressed-61-103.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BAY VIEW ARCHITECTURE CERTIFICATE FORM 1 Q 2 FY 24-25.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BAY VIEW ENGINEER CERTIFICATE FORM 2 Q-2 FY 24-25.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 CA CERTIFIED MD SHYAM SADAN Q-1 FY 24-25.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE BAY VIEW Q-1 FY 24-25.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BAY VIEW APTS ENGINEER CERTIFICATE FORM 2 Q-1 FY 23-24.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE Q4 FY 23-24 SHYAM SADAN.pdf10 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 CA CERTIFICATE bay view apartments FY 23-24.pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BAY VIEW APTS ARCHITECTURE CERTIFICATE .pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BAY VIEW APTS - ENGINEERS CERTIFICATE.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE SHYAM SADAN.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BAY VIEW APARTMENT.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RERA CA CERTIFICATE Q-3 fy 23-24 SHYAM SADAN.pdf4 Mar 2024
Details of encumbrances concerned to FinanceFile: non financial encumbrances declaration - final.pdf11 Oct 2023
Details of encumbrances concerned to LegalFile: non financial encumbrances declaration - final.pdf11 Oct 2023
CERSAI detailsFile: cersai declarations.pdf11 Oct 2023
Other - LegalFile: FORM -B SURESH AGRWAL SHYAM SADAN.pdf11 Oct 2023
Other - FinanceFile: non financial encumbrances declaration - final.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca form 3 F.pdf2 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank Ac declaration FORMAT A.pdf2 Oct 2023
Copy of the legal title reportFile: TITLE.pdf22 Sep 2023
Details of encumbrances concerned to FinanceFile: non encumbrances declaration - final.pdf22 Sep 2023
Details of encumbrances concerned to LegalFile: non encumbrances declaration - final.pdf22 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure.pdf22 Sep 2023
Proforma of Agreement for saleFile: 16 Sale Agreement draft (New).pdf22 Sep 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER SHYAM SADAN .pdf22 Sep 2023
Deviation Report with respect to Allotment letterFile: no Deviation Allotment letter.pdf22 Sep 2023
Deviation Report with respect to model copy of AgreementFile: no Deviation AOS PHASE 3.pdf22 Sep 2023
Layout approvalFile: page 1.pdf20 Sep 2023
Building plan approvalFile: page 1.pdf20 Sep 2023
Building plan approvalFile: page 2.pdf20 Sep 2023
Building plan approvalFile: page 3.pdf20 Sep 2023
Building plan approvalFile: page 4.pdf20 Sep 2023
Building plan approvalFile: page 5.pdf20 Sep 2023
PAN CardFile: NEW PAN CARD CHANDULAL MEHTA.pdf20 Sep 2023
Copy of Layout Approval (in case of layout)File: page 1.pdf20 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: page 1.pdf20 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: page 2.pdf20 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: page 3.pdf20 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: page 4.pdf20 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: page 5.pdf20 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: 2382015_FirstCC_signed - COMMENCEMENT CERTIFICATE.pdf20 Sep 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf20 Sep 2023
Declaration in FORM BFile: FORM B CJM NOTRISE.pdf20 Sep 2023

Keep BAY VIEW APARTMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GIRGAUM

2 kmBAY VIEW APARTMENTSCompleted 13Lapsed / revoked 24Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: CHANDULAL JORAVARMALJI MEHTA

CHANDULAL JORAVARMALJI MEHTA has 2 registrations on MahaRERA, including NAKODA MEHTA SUNSHINE HEIGHTS A AND C WINGS and BAY VIEW APARTMENTS. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if BAY VIEW APARTMENTS is delayed beyond 31 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BAY VIEW APARTMENTS?

The registered promoter entity is CHANDULAL JORAVARMALJI MEHTA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BAY VIEW APARTMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BAY VIEW APARTMENTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BAY VIEW APARTMENTS?

The professionals named in the filing: Architect: CHUDAWALA AND ASSOCIATES CHUDAWALA; Engineer: SAMIULLAH KHAN; Engineer: APARNA DABAK; Chartered Accountant: VAIBHAV PATIL; Chartered Accountant: yashes Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BAY VIEW APARTMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BAY VIEW APARTMENTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BAY VIEW APARTMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.