Home / Browse projects / Pune, Maharashtra / BASANT BAHAR

Registered No litigation declared Residential / Group Housing project

BASANT BAHAR

By ICON PROPERTIES

RG-MH-46154 · RERA P52100051530 · Last updated on MahaRERA portal: 26 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

BASANT BAHAR is a Residential / Group Housing project by ICON PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100051530 on 23 Jun 2023. Possession is promised by 31 Jul 2027.

At a glance

Project

  • NameBASANT BAHAR
  • TypeResidential / Group Housing
  • Location
    • PRABHAT ROAD
    • ERANDWANE
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411004
  • Pincode411004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051530
  • ReraGenie IDRG-MH-46154

Builder

  • NameICON PROPERTIES
  • Entity typePartnership
  • GSTIN27AAEFI6693P1ZI
  • PartnersPARAG TEPAN, MILIND SAKUNDE, PARAG SANE
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects5 →

Key dates

this monthRegisteredJun 2023PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2023
  • Promised completion31 Jul 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BASANT BAHARNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

BASANT BAHAR: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,098 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024
LandownerVillageDistrict
ICON PROPERTIESPune (M Corp.)Pune
BASANT BAHAR APARTMENTPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI4340.01
Proposed, not sanctioned3,198 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW DP ROAD OPP JANASEVA BANK

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP HARDIKAR AND ASSOCIATES ARCHITECT AND INTERIOR DESIGNERS
EngineerNIRANJAN JOG
Chartered AccountantS S SMART & ASSOCIATES CHARTERED ACCOUNTANTS
Chartered AccountantDIPAK MEKHALE
PartnerRole in project
ICON PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM-1 Q4 FY 2526 BB.pdf26 Apr 2026
Form 2File: FORM-2 Q4 FY 2526 BB.pdf26 Apr 2026
Form 3File: FORM-3 Q4 FY 2526 BB.pdf26 Apr 2026
Disclosure of Sold and Booked InventoryFile: FORM-SOLD UNSOLD INVENTORY Q4 FY 2526 BB.pdf26 Apr 2026
Form 1File: FORM 1 Q3 FY 2526 BB.pdf26 Jan 2026
Form 2File: FORM 2 Q3 FY 2526 BB.pdf26 Jan 2026
Form 3File: FORM 3 BASANT BAHAR Q3 2526 SIGNED.pdf26 Jan 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY 31122025.pdf26 Jan 2026
Form 1File: FORM 1 Q2.pdf25 Jan 2026
Form 2File: Form 2 Q2.pdf25 Jan 2026
Form 3File: Form 3 Q2.pdf25 Jan 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY 30092025.pdf25 Jan 2026
Form 1File: FORM 1 BASANT BAHAR Q4 FY2425.pdf21 Jul 2025
Form 2File: FORM 2 BASANT BAHAR Q1 2526.pdf21 Jul 2025
Form 3File: FORM 3 Q1 2526 BB (1).pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold BB Q1 2526.pdf21 Jul 2025
Disclosure of sold/ booked inventoryFile: Basant Bahar Sold Unsold 31032025.pdf29 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: BASANT BAHAR FORM 2A FY 2425.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BASANT BAHAR Q4 2425.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR 31032025.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Basant Bahar Q4 FY2425.pdf5 Apr 2025
Building plan approvalFile: 1 B.PDF3 Apr 2025
Building plan approvalFile: 2 B.PDF3 Apr 2025
Building plan approvalFile: 3 B.PDF3 Apr 2025
Building plan approvalFile: 4 B.PDF3 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: BB -Commencement Date 24-03-2025.pdf3 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 B.PDF3 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 B.PDF3 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 B.PDF3 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 B.PDF3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BASANT BAHAR 31122024_compressed.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR Q3 FY2425.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 2425 BB.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold BB Q3 2425.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM NO 5 BASAN BHAR.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ICON PROPERTIES MARCH 2024.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR Q2 FY2425.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR Q2 FY2425.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR Q1 FY2425.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHEETAL KUNJ Q1 FY 2425.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BASANT BAHAR 30062024.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BASANT BAHAR 30092024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Basant Bahar Q1 FY2425.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Basant Bahar Q2 FY2425.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Basant Bahar Sold Unsold 30062024.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Basant Bahar Sold Unsold 30092024.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A- ICON PROPERTIES (MARCH 2024).pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Basant Bahar Sold Unsold Inventory.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Basant Bahar Q4 FY2324.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BASANT BAHAR - Q4 2324.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR Q4 FY2324.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Basant Bahar Q4 FY2324.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 2324 BB.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Q3 2324 BASANT BAHAR SOLD UNSOLD.pdf30 Jan 2024
Building plan approvalFile: 1 compressed.pdf27 Jan 2024
Building plan approvalFile: 2.pdf27 Jan 2024
Building plan approvalFile: 3 compressed.pdf27 Jan 2024
Building plan approvalFile: 4.pdf27 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 compressed.pdf27 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf27 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 compressed.pdf27 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf27 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 11012024.pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR Q3 FY2324.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 FY 2324 - BASANT BAHAR.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: Basant Bahar sold unsold 30062023.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Basant Bahar sold unsold 30092023.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR Q1 FY2324.pdf11 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BASANT BAHAR Q2 FY2324.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Basant Bahar Q2 FY2324.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BASANT BAHAR 30062023.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BASANT BAHAR 30092023.pdf10 Oct 2023
Layout approvalFile: 1c.pdf5 Oct 2023
Building plan approvalFile: 2c.pdf5 Oct 2023
Building plan approvalFile: 3c.pdf5 Oct 2023
Building plan approvalFile: 4c.pdf5 Oct 2023
Copy of Layout Approval (in case of layout)File: 1c.pdf5 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 2c.pdf5 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 3c.pdf5 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 4c.pdf5 Oct 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ASHWINIKUNJ SAHAKARI GRUSHARACHANA SANSTHA MARYADITKOTHRUD PUNE18CompletedOct 2016Oct 2016
CHAITANYAPURI CO OPERATIVE HOUSING SOCIETY LIMITEDDHANUKAR COLONY KOTHRUD PUNE22CompletedSep 2016Sep 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BASANT BAHAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ERANDWANE13,700+ in Pune

2 kmBASANT BAHARCompleted 89Lapsed / revoked 32Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 276 registered projects within 2 km.

Builder: ICON PROPERTIES

ICON PROPERTIES has 4 registrations on MahaRERA, including SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT and BASANT BAHAR. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BASANT BAHAR is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BASANT BAHAR?

The registered promoter entity is ICON PROPERTIES, a partnership as per the filing. Its GSTIN 27AAEFI6693P1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BASANT BAHAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BASANT BAHAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BASANT BAHAR?

The professionals named in the filing: Architect: SANDEEP HARDIKAR AND ASSOCIATES ARCHITECT AND INTERIOR DESIGNERS; Engineer: NIRANJAN JOG; Chartered Accountant: S S SMART & ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: DIPAK MEKHALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BASANT BAHAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BASANT BAHAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BASANT BAHAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.