Home / Browse projects / Pune, Maharashtra / BALAJI VISHWA PHASE - II
BALAJI VISHWA PHASE - II
RG-MH-16398 · RERA P52100025830 · Last updated on MahaRERA portal: 13 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 13 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BALAJI VISHWA PHASE - II is a Residential / Group Housing project by JAY BALAJI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100025830 on 18 Jul 2020. Possession was promised by 30 Sep 2025 and is now 13 months past that date.
At a glance
Project
- NameBALAJI VISHWA PHASE - II
- TypeResidential / Group Housing
- Location
- NARHE
- Haveli
- Pune
- 411041
- Pincode411041
- RERA no.P52100025830
- ReraGenie IDRG-MH-16398
Builder
- NameJAY BALAJI DEVELOPERS
- Entity typePartnership
- PartnersVIJAY SAHEBRAO PATIL, RAJENDRA SAWANTRAO MALI, YASHWANT MAHADEO GUNWANT
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Jul 2020
- Promised completion30 Sep 2025
- Revised completionNone
- Buildings1 building record
- Documents filed101 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BALAJI VISHWA PHASE - II | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.
BALAJI VISHWA PHASE - II: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | S D WALHEKAR |
| Engineer | DNYANESHWAR SHIVAJI SONTAKKE |
| Chartered Accountant | Amit D Pise |
| Partner | Role in project |
|---|---|
| JAY BALAJI DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jul 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Feb 2025
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| OtherFile: FORM 4_ARCHITECT CERTIFICATE Revised.pdf | 13 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4_ARCHITECT CERTIFICATE Revised.pdf | 13 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4_ARCHITECT CERTIFICATE.pdf | 10 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 10 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4_ARCHITECT CERTIFICATE.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_CA CERTIFICATE.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGINEERS CERTIFICATE.pdf | 3 Feb 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE.pdf | 3 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf | 3 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM_5_ANNUAL REPORT_FY 2022-23.pdf | 3 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_QUALITY ASSURANCE.pdf | 3 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM_5_ANNUAL REPORT_FY 2023-24.pdf | 3 Feb 2025 |
| Layout approvalFile: PLAN LAYOUT_1.pdf | 1 Dec 2023 |
| Layout approvalFile: PLAN LAYOUT_2.pdf | 1 Dec 2023 |
| Building plan approvalFile: BUILDING PLAN_4.pdf | 1 Dec 2023 |
| Building plan approvalFile: BUILDING PLAN_5.pdf | 1 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT_1.pdf | 1 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT_2.pdf | 1 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_4.pdf | 1 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_5.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29_Sold_Booked Inventory.pdf | 1 Dec 2023 |
| Layout approvalFile: PLAN LAYOUT.pdf | 28 Nov 2023 |
| Building plan approvalFile: BUILDING PLAN_1.pdf | 28 Nov 2023 |
| Building plan approvalFile: BUILDING PLAN_2.pdf | 28 Nov 2023 |
| Building plan approvalFile: BUILDING PLAN_3.pdf | 28 Nov 2023 |
| Building plan approvalFile: BUILDING PLAN_4.pdf | 28 Nov 2023 |
| Building plan approvalFile: BUILDING PLAN_5.pdf | 28 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT.pdf | 28 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_1.pdf | 28 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_2.pdf | 28 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_3.pdf | 28 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_4.pdf | 28 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_5.pdf | 28 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_Compressed.pdf | 28 Nov 2023 |
| Declaration about Commencement CertificateFile: Form_Declaration About commencement Certificate.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECH CERTIFICATE.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGINEERS CERTIFICATE.pdf | 28 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_SITE SUPERVISOR CERTIFICATE.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_CA CERTIFICATE_Compressed.pdf | 28 Nov 2023 |
| Building plan approvalFile: Building_Plan.pdf | 21 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan.pdf | 21 Feb 2023 |
| Layout approvalFile: Plan_Layout_1.pdf | 10 Feb 2023 |
| Layout approvalFile: Plan_Layout_2.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_1.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_2.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_3.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_4.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_5.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_6.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_7.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_8.pdf | 10 Feb 2023 |
| Building plan approvalFile: Building_Plan_9.pdf | 10 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Plan_Layout_1.pdf | 10 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Plan_Layout_2.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_1.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_2.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_3.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_4.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_5.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_6.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_7.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_8.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building_Plan_9.pdf | 10 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NEW_COMMENCEMENT CERTIFICATE_Compressed.pdf | 10 Feb 2023 |
| Declaration about Commencement CertificateFile: FORM_D_Declaration about Commencement Certificate_Circular 32_2021.pdf | 10 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_ARCHITECH CERTIFICATE.pdf | 10 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_ENGINEERS CERTIFICARE.pdf | 10 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM_2A_QUALITY ASSURANCE.pdf | 10 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29_Sold_Booked Inventory.pdf | 10 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3_CA CERTIFICATE_Compressed.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM_5_ANNUAL REPORT.pdf | 10 Feb 2023 |
| OtherFile: FORMAT_C_Consent of Allottes_Circular 28.pdf | 10 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CERTIFICATE_ARCHITECH_compressed.pdf | 30 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CERTIFICATE_ENGINEER.pdf | 30 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CERTIFICATE_SITE SUPERISOR.pdf | 30 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFICATE_CA_compressed.pdf | 30 Jun 2022 |
| Declaration about Commencement CertificateFile: FORM_D_Circular 32_2021.pdf | 18 Oct 2021 |
| Declaration about Commencement CertificateFile: FORM_D_Circular 32_2021.pdf | 16 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: FORM_D_Circular 32_2021.pdf | 11 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CERTIFICATE_QUALITY ASSURANCE_compressed.pdf | 11 Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep BALAJI VISHWA PHASE - II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NARHE13,700+ in Pune
VYANA PHASE-I -T5, T6, T7
KOLTE-PATIL DEVELOPERS LIMITED
Pratham Vihar Phase I
LJR Constructions LLP
VYANA PHASE-I-T2,T3 AT THE RESERVE
KOLTE-PATIL DEVELOPERS LIMITED
MAITREE MEGA CITY
MAITREE INFRA
RAMANA MYRA
SAI AND SHANTISHOBHA VENTURE
Apple Regency
Sri Sidhievinayak associetes
Builder: JAY BALAJI DEVELOPERS
JAY BALAJI DEVELOPERS has 1 registration on MahaRERA, including BALAJI VISHWA PHASE - II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that BALAJI VISHWA PHASE - II shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BALAJI VISHWA PHASE - II is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BALAJI VISHWA PHASE - II?
The registered promoter entity is JAY BALAJI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BALAJI VISHWA PHASE - II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BALAJI VISHWA PHASE - II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BALAJI VISHWA PHASE - II?
The professionals named in the filing: Architect: S D WALHEKAR; Engineer: DNYANESHWAR SHIVAJI SONTAKKE; Chartered Accountant: Amit D Pise. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BALAJI VISHWA PHASE - II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback