ReraGenieLog inGet a buyer report

Home / Browse projects / AZAD RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

AZAD RESIDENCY

By DUDHWALA CONSTRUCTION

RG-MH-21008 · RERA P51900011568 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2026Possession promised4 months past this date
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 99%
0Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

AZAD RESIDENCY is a Residential / Group Housing project by DUDHWALA CONSTRUCTION in 400008, registered with MahaRERA as P51900011568 on 31 Aug 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameAZAD RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • MEGHRAJ SETHI MARG
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900011568
  • ReraGenie IDRG-MH-21008

Builder

  • NameDUDHWALA CONSTRUCTION
  • Entity typePartnership
  • PartnersFARHAN IQBAL PATEL, FAIZ IQBAL PATEL, MEHBOOB AHMED PATEL

Key dates

4 months past promisethis monthRegisteredAug 2017First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed143 files

Current status

93.4%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AZAD RESIDENCYNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.

AZAD RESIDENCY: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises99%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered29

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area478 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Dec 2025

Approvals and building plan

Permissible FSI3579.01
Proposed, not sanctioned3,031 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, APSARA MULTIPLEX, DR BD MARG GRANT RD EAST MUMBAI
Estimated costRs 16.73 cr
Cost incurredRs 15.62 cr
Work done93.37%
BuildingWingEstimatedIncurred
AZAD RESIDENCYNARs 9.12 crRs 9.12 cr
-NARs 7.61 crRs 6.50 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s Aman & Associates
ArchitectABDUL SATTAR ABDUL GANI SHAIKH
EngineerM/s J+W Consultants
EngineerSHAHID HUSAIN SHAIKH
Chartered AccountantAFTAB ALAM
PartnerRole in project
DUDHWALA CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30122519155Dec 2025 → Jun 2026

Reason as filed by the promoterThe OC for the 22nd and 23rd floors is currently pending due to certain approvals that are still under process.Therefore, we kindly request additional time to complete the pending approval formalities and obtain the remaining OC.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1.pdf29 Jul 2026
Withdrawal Update Form 2File: FORM 2 Final DC.pdf29 Jul 2026
Withdrawal Update Form 3File: Form 3 Final.pdf29 Jul 2026
Withdrawal Update Form 1File: Q-4 FY 2025-26 Signed.pdf1 Jun 2026
Withdrawal Update Form 2File: 31-03-26 Form 2 Eng DC PENDING.pdf1 Jun 2026
Withdrawal Update Form 3File: Q-4 FY 25-26 Signed.pdf1 Jun 2026
Form 2A (FY 2025-2026)File: 31-03-26 Form 2A Eng.pdf1 Jun 2026
Withdrawal Update Form 1File: 31-12-25 Form 1 Arc DC.pdf27 May 2026
Withdrawal Update Form 2File: 31-12-25 Form 2 Eng DC.pdf27 May 2026
Withdrawal Update Form 3File: 31-12-25 Form 3 DC.pdf27 May 2026
Withdrawal Update Form 1File: 31-12-25 Form 1 Arc DC.pdf2 Mar 2026
Withdrawal Update Form 2File: 31-12-25 Form 2 Eng DC.pdf2 Mar 2026
Withdrawal Update Form 3File: 31-12-25 Form 3 DC.pdf2 Mar 2026
Building plan approvalFile: Drawing_Covering_merged.pdf21 Jan 2026
Commencement certificateFile: 2023-08-08 FurtherCC.pdf21 Jan 2026
Layout approvalFile: Drawing_Covering_merged.pdf21 Jan 2026
Withdrawal Update Form 1File: 31-12-25 Form 1 Arc DC.pdf21 Jan 2026
Withdrawal Update Form 2File: 31-12-25 Form 2 Eng DC.pdf21 Jan 2026
Withdrawal Update Form 3File: 31-12-25 Form 3 DC.pdf21 Jan 2026
Withdrawal Update Form 1File: Q-2 Architect FY 25-26 Signed.pdf20 Jan 2026
Withdrawal Update Form 1File: Q-2 Architect FY 25-26 Signed.pdf20 Jan 2026
Withdrawal Update Form 2File: Q-2 ENGINEER FY 25-26 Signed.pdf20 Jan 2026
Withdrawal Update Form 2File: Q-2 ENGINEER FY 25-26 Signed.pdf20 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 25-26 Signed.pdf20 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 25-26 Signed.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: 31-03-25 Form 2A Eng Pending.pdf12 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25 Signed.pdf12 Jan 2026
Withdrawal Update Form 1File: Q-2 Architect FY 25-26 Signed.pdf9 Jan 2026
Withdrawal Update Form 2File: Q-2 ENGINEER FY 25-26 Signed.pdf9 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 25-26 Signed.pdf9 Jan 2026
Withdrawal Update Form 1File: Q-1 ARCHITECT FY 2025-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 1File: Q-2 Architect FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 1File: Q-2 Architect FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 1File: Q-2 Architect FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 2File: 30-06-25 Form 2 Eng DC PENDING.pdf11 Dec 2025
Withdrawal Update Form 2File: Q-2 ENGINEER FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 2File: Q-2 ENGINEER FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 2File: Q-2 ENGINEER FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 3File: Q-1 FORM 3 FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 3File: Q-2 FORM 3 FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 3File: Q-2 FY 25-26 Signed.pdf11 Dec 2025
Withdrawal Update Form 3File: Q-2 FY 25-26 Signed.pdf11 Dec 2025
Form 1File: Q-1 FY 2022-23 Signed.pdf9 Dec 2025
Form 2File: 30-06-22 Form 2 Eng DC.pdf9 Dec 2025
Form 3File: Q-1 FY 2022-23 Signed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-1 FY 2022-23 Sold.pdf9 Dec 2025
Form 1File: Q-2 FY 2022-23 Signed.pdf9 Dec 2025
Form 2File: 30-09-22 Form 2 Eng DC.pdf9 Dec 2025
Form 3File: Q-2 FY 22-23 SOLD.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-2 FY 22-23 SOLD.pdf9 Dec 2025
Form 1File: Q-3 FY 2022-23 Signed.pdf9 Dec 2025
Form 3File: Q-3 FY 22-23 Signed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-3 FY 22-23 SOLD.pdf9 Dec 2025
Form 2File: 31-12-22 Form 2 Eng DC.pdf9 Dec 2025
Form 1File: Q-4 FY 2022-23 Signed.pdf9 Dec 2025
Form 2File: 31-03-23 Form 2 Eng DC.pdf9 Dec 2025
Form 3File: Q-4 FY 22-23 Signed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-4 FY 22-23 SOLD.pdf9 Dec 2025
Form 1File: Q-1 FY 2023-24 Signed.pdf9 Dec 2025
Form 2File: 30-06-23 Form 2 Eng DC.pdf9 Dec 2025
Form 3File: Q-1 FY 23-24 Signed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-1 FY 23-24 SOLD.pdf9 Dec 2025
Form 1File: Q-2 FY 2023-24 Signed.pdf9 Dec 2025
Form 2File: 30-09-23 Form 2 Eng DC.pdf9 Dec 2025
Form 3File: Q-2 FY 23-24 Signed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-2 FY 23-24 SOLD.pdf9 Dec 2025
Form 1File: Q-3 FY 2023-24 Signed.pdf9 Dec 2025
Form 2File: 31-12-23 Form 2 Eng DC.pdf9 Dec 2025
Form 3File: Q-3 FY 23-24 Signed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-3 FY 23-24 SOLD.pdf9 Dec 2025
Form 1File: Q-4 FY 2023-24 Signed.pdf9 Dec 2025
Form 2File: 31-03-24 Form 2 Eng DC.pdf9 Dec 2025
Form 3File: Q-4 FY 23-24 Signed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-4 FY 23-24 SOLD.pdf9 Dec 2025
Form 1File: Q-1 FY 2024-25 Signed.pdf9 Dec 2025
Form 2File: 30-06-24 Form 2 Eng DC.pdf9 Dec 2025
Form 3File: Q-1 FY 24-25 Signed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-1 FY 24-25 SOLD.pdf9 Dec 2025
Form 1File: Q-2 FY 2024-25 Signed.pdf9 Dec 2025
Form 2File: 30-09-24 Form 2 Eng DC.pdf9 Dec 2025

Keep AZAD RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmAZAD RESIDENCYCompleted 12Lapsed / revoked 18Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: DUDHWALA CONSTRUCTION

DUDHWALA CONSTRUCTION has 1 registration on MahaRERA, including AZAD RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that AZAD RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AZAD RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AZAD RESIDENCY?

The registered promoter entity is DUDHWALA CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AZAD RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AZAD RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AZAD RESIDENCY?

The professionals named in the filing: Architect: M/s Aman & Associates; Architect: ABDUL SATTAR ABDUL GANI SHAIKH; Engineer: M/s J+W Consultants; Engineer: SHAHID HUSAIN SHAIKH; Chartered Accountant: AFTAB ALAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AZAD RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AZAD RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AZAD RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.