Home / Browse projects / Pune, Maharashtra / AVONVISTAPROJECT4

Registration lapsed No litigation declared Residential / Group Housing project

AVONVISTAPROJECT4

By NAIKNAVAREPROFILECONSTRUCTIONSPVTLTD

RG-MH-21517 · RERA P52100029724 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
11 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 86%
1Complaints at MahaRERAon this registration
Jump to the 174 documents Report an error

AVONVISTAPROJECT4 is a Residential / Group Housing project by NAIKNAVAREPROFILECONSTRUCTIONSPVTLTD in Pune, Maharashtra, registered with MahaRERA as P52100029724 on 26 Jun 2021. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAVONVISTAPROJECT4
  • TypeResidential / Group Housing
  • Location
    • PUNE
    • Mahalunge
    • Mulshi
    • 410501
  • Pincode410501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029724
  • ReraGenie IDRG-MH-21517

Builder

  • NameNAIKNAVAREPROFILECONSTRUCTIONSPVTLTD
  • Entity typeCompany
  • CINU45309PN2017PTC173686
  • GSTIN27AAFCN8704N1ZY
  • DirectorANAND HEMANT NAIKNAVARE
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredJun 2021First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Jun 2021
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed174 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A3 BUILDINGNA240000
B3 BUILDINGNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 86%.

A3 BUILDING63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure86%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B3 BUILDING70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed313

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots313
Closed/Covered306
Open Space7
BuildingClosed/CoveredOpen SpaceTotal
A3 BUILDING1463149
B3 BUILDING1604164

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,316 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14800.11
Proposed, not sanctioned12,794 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFC ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURI H NAIKNAVARE
EngineerKRUPALI KADAM
Chartered AccountantKK SS AND ASSOCIATES
PartnerRole in project
NAIKNAVAREPROFILECONSTRUCTIONSPVTLTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024979Dec 2024 → Dec 2025

Reason as filed by the promoterDear Sir/Madam, We, Naiknavare Profile Constructions Pvt. Ltd., the promoters of Avon Vista Project 4 (RERA No. P52100029724), hereby submit this application for an extension under Section 6 of the Real Estate (Regulation and Development) Act, 2016. The project was registered on 6th May 2021 with an original completion date of 31st December 2024. Due to unavoidable challenges beyond our control, we request an extension to complete the project as per the required standards. Challenges Faced: Impact of COVID-19: Workforce shortages due to labor migration during lockdowns. Delays in procuring and

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504567NAIKNAVAREPROFILECONSTRUCTIONSPVTLTDSamadhan Dattu Nikam22/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Apr 2025

Documents filed174

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 174 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Avon Vista 4 - A3 B3 Sold Booked Inventory.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avon Project 4.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avon Pro4.pdf11 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion B3,A3.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avon Vista Pro4.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avon Vista Pro4.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 - Oct to Dec 24.pdf18 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AVON PRO 4 2A.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 01 25 RERA ARCH CERTIFICATE A3 B3.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: avon vista pro 4.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVON VISTA PRO 4.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: avon vista pro 4.pdf8 Jan 2025
Declaration in FORM BFile: P52100029724_FileName_1.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Avon Vista P4 - FY 23-24.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AVON PRO 4.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AVON PRO 4.pdf24 Oct 2024
Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent (12).pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent (12).pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avon Vista Pro4.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AV pro 4.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: AVON VISTA PROJECT 4.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVON PRO 4-merged.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVON PRO 4.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: AVON VISTA PROJECT 4.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24 06 24 AV FORM 1 A3 B3.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avon Vista pro 4 A3 B3.pdf3 Jul 2024
OtherFile: Final Judgement copy.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avon P4.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: avon pro 4.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avon Vista pro 4.pdf5 Apr 2024
Disclosure of sold/ booked inventoryFile: AVON VISTA PRO 4.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 04 24 RERA ARCH CERTIFICATE A3 B3 25 03 24.pdf2 Apr 2024
OtherFile: Avon Vista Project 4 Bldg A3 B3.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avon 4 Dec 23.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avon Vista A3 B3.pdf6 Jan 2024
OtherFile: Avon Vista B3 A3.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: AVON PRO 4 B3.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: AVON PRO 4.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVON PRO 4.pdf2 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: avon pro4 form 2.pdf2 Jan 2024
OtherFile: AV B3 A3.pdf16 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avon -4 FORM 3 Sept 23.pdf17 Oct 2023
OtherFile: AVON VISTA PRO 3 AREA STATEMENT131023.pdf13 Oct 2023
OtherFile: AVON VISTA PRO 4 AREA STATEMENT B3 131023.pdf13 Oct 2023
Building plan approvalFile: AVON PRO 4 3-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 4-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 5-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 6-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 7-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 8-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 9-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 10-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 11 -17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 12-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 12-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 13-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 14-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 15-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 16-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 17-17 11 10 23.pdf12 Oct 2023
Layout approvalFile: AVON PRO 4 LAYOUT 1-17 11 10 23.pdf12 Oct 2023
Building plan approvalFile: AVON PRO 4 2-17 11 10 23.pdf12 Oct 2023
Copy of Layout Approval (in case of layout)File: AVON PRO 4 LAYOUT 1-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 2-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 3-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 4-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 5-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 6-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 7-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 8-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 9-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 10-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 11 -17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 12-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 12-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 13-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 14-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 15-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 16-17 11 10 23.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AVON PRO 4 17-17 11 10 23.pdf12 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
AVON VISTA PROJECT 2P52100017914PUNE, PuneSep 2018CompletedJun 2022Jan 1970

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVONVISTAPROJECT4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmAVONVISTAPROJECT4Completed 125Lapsed / revoked 45Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 267 registered projects within 2 km.

Builder: NAIKNAVAREPROFILECONSTRUCTIONSPVTLTD

NAIKNAVAREPROFILECONSTRUCTIONSPVTLTD has 2 registrations on MahaRERA, including AVON VISTA PROJECT 2 and AVONVISTAPROJECT4. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that AVONVISTAPROJECT4 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AVONVISTAPROJECT4 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVONVISTAPROJECT4?

The registered promoter entity is NAIKNAVAREPROFILECONSTRUCTIONSPVTLTD, a company as per the filing. Its CIN U45309PN2017PTC173686 and GSTIN 27AAFCN8704N1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVONVISTAPROJECT4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AVONVISTAPROJECT4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AVONVISTAPROJECT4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVONVISTAPROJECT4?

The professionals named in the filing: Architect: GAURI H NAIKNAVARE; Engineer: KRUPALI KADAM; Chartered Accountant: KK SS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVONVISTAPROJECT4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVONVISTAPROJECT4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVONVISTAPROJECT4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.