Home / Browse projects / Pune, Maharashtra / AVON VISTA PROJECT 3
AVON VISTA PROJECT 3
By NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD
RG-MH-14710 · RERA P52100023133 · Last updated on MahaRERA portal: 23 Apr 2025
Source: official MahaRERA filing
Red flags
- 3 complaints at MahaRERA
- 1 extension taken
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AVON VISTA PROJECT 3 is a Residential / Group Housing project by NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100023133 on 2 Dec 2019. The registration is recorded completed; possession was promised by 30 Jun 2023. 3 complaints are on record with the regulator.
At a glance
Project
- NameAVON VISTA PROJECT 3
- TypeResidential / Group Housing
- Location
- PUNE
- Mahalunge
- Mulshi
- 410501
- Pincode410501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100023133
- ReraGenie IDRG-MH-14710
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Dec 2019
- Promised completion30 Jun 2023
- Revised completionNone
- Buildings1 building record
- Documents filed138 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B2 BUILDING | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
B2 BUILDING: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed132
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAURI H NAIKNAVARE |
| Engineer | KRUPALI KADAM |
| Chartered Accountant | SHRISHRIMAL AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDate:-29th June 2023 To The Chief Engineer, RERA OFFICE, MUMBAI. Subject : Application for the Extension of "Avon Vista Project-3" under RERA clause No. Section 6 of Real Estate Act 2016. Referance : Project Registration No. - P52100023133 Dear Sir, We have registered our " Avon Vista Project-3" vide P52100023133 as per RERA provisions. The completion date for the project is 30th June 2023. But we are unable to complete our project due to various reasons mentioned as under. As you are aware, due to Post Covid-19 effect, the labour strength on site reduced drastically and we are struggling to b
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000198120 | Shashil Kose | Anand Hemant Naiknavare | 15/01/2023 |
| CC005000000350899 | ANKIT RAWAT | ANAND HEMANT NAIKNAVARE | 08/05/2024 |
| CC12502001 | Vinayak Laxman Yedage | NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD | 19/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Nov 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Jan 2024
Documents filed138
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Avon Vista 3 - B2 Sold_Booked Inventory.pdf | 23 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avon Pro3.pdf | 11 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Avon Vista P3 - FY 23-24.pdf | 7 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AV pro 3.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24 06 24 AV FORM 4 B2 DEV FORM 4.pdf | 3 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avon Vista pro 3 B2.pdf | 3 Jul 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: 10 06 24 FORM 4 -RERA ARCH CERTIFICATEB DEV.pdf | 10 Jun 2024 |
| Layout approvalFile: PMRDA Sanction Revised LAYOUT 1-17 Dated 11-10-2023_11zon.pdf | 3 Jun 2024 |
| Building plan approvalFile: PMRDA Sanction Revised LAYOUT 1-17 Dated 11-10-2023_11zon.pdf | 3 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: PMRDA Sanction Revised LAYOUT 1-17 Dated 11-10-2023_11zon.pdf | 3 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PMRDA Sanction Revised LAYOUT 1-17 Dated 11-10-2023_11zon.pdf | 3 Jun 2024 |
| OtherFile: Final Judgement copy.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avon P3.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avon pro 3.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avon Vista pro 3.pdf | 5 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: AVON VISTA PRO 3.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 04 24 RERA ARCH CERTIFICATE B2 DEVELOPMENT 25 03 24.pdf | 2 Apr 2024 |
| OtherFile: Avon Vista Project 3 Bldg B2.pdf | 2 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avon 3 Dec 23.pdf | 11 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B2 COMPLETION PART - 10-01-2024.pdf | 11 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avon Vista B2.pdf | 6 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avon Vista B2.pdf | 6 Jan 2024 |
| OtherFile: Avon Vista B2.pdf | 6 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: AVON PRO 3 A3.pdf | 5 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: AVON PRO 3 B2.pdf | 5 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVON PRO3.pdf | 2 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 avon pro3.pdf | 2 Jan 2024 |
| OtherFile: AV B2.pdf | 16 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avon 3- FORM 3 Sept 23.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avon 3- FORM 3 Sept 23.pdf | 16 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avon vista B2 bilg pro 3.pdf | 10 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avon Vista Pro3.pdf | 4 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Avon Project 3 Form 5 22-23.pdf | 4 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avon Vista Pro3.pdf | 3 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVON PRO 3 Form 2 Avon Pro 3 Apr June 2023.pdf | 4 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avon Pro3 June 2023.pdf | 21 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avon Pro3 RERA ARCH CERTIFICATE.pdf | 18 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avon Vista Pro3 B2.pdf | 18 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Avon Vista Pro3 -B2.pdf | 18 Jul 2023 |
| Declaration about Commencement CertificateFile: Form D.pdf | 7 Jul 2023 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 7 Jul 2023 |
| Declaration in FORM BFile: AVON VISTA FORM B RERA.pdf | 7 Jul 2023 |
| OtherFile: Area Statement B2 21 Floors.pdf | 6 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avon 3 June 21 -updated.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Avon 3 Sept 21 - updated.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3_Avon 3 Dec 21- uploaded.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avon 3 Mar 22 - Uploaded.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avon 3 Jun 22 - uploaded.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avon 3 Sept 22 - Uploaded.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avon 3 Mar 23.pdf | 5 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AVON PRO 3 FORM 5 YR 21-22Annual Audit Report of Statutory CA Form 5FY 2021-22.pdf | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avon Vista Pro 3 - Form 2 Jan To March 2023.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avon Vista Pro 3 - Form 2 Jan To March 2023.pdf | 14 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avon Vista Pro3 ARCH CERTI Jan To March 2023 B2 DEV.pdf | 10 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Avon Vista B2_compressed.pdf | 10 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROJ 03 ENGG CERT 31072022.pdf | 4 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Avon vista project 3 form 2A JAN MAR 23.pdf | 4 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Avon Vista 3 FY 2021-22.pdf | 4 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avon Pro 3 RERA Form 3 oct Dec 22.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avon Pro 3 RERA Form 3 Oct Dec 22 (2).pdf | 8 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Avon Vista 3 Dated 31-03-2020.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Avon Vista 3 FY 31-03-2021.pdf | 13 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form 5 - Avon Vista 3 FY 31-03-2022.pdf | 13 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Avon Vista PRO 3 B2 Sold Unsold DEC 22.pdf | 9 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Avon Vista Pro3-B2.pdf | 18 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AVON PRO 3 FORM 2A OCT DEC 22.pdf | 10 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVON PRO 3 020123 RERA ARCH CERTI B2.pdf | 6 Jan 2023 |
| Layout approvalFile: Avon Vista Sanction 01112022 (1).pdf | 11 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Avon Vista Sanction 01112022 (1).pdf | 11 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: AVON VISTA CC dated 01112022.pdf | 11 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVON PRO 3 FORM 1 JUN SEPT 22.pdf | 14 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVON PRO 3 FORM 2 JUN SEPT22.pdf | 14 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certi for Quality Assurance - Form 2A Avon Pro 3.pdf | 7 Oct 2022 |
| OtherFile: AVON DISCLOSURE NGT 071022.pdf | 7 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Avon Vista PRO 3 B2 Sold Unsold 041022.pdf | 6 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVON PRO 3 FORM 1 JUN 22 ARCH CERTI (2).pdf | 6 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT EAGLE NEST PRO 3.pdf | 4 May 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Avon Vista Society Formation Certificate.pdf | 3 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROJ 03 ENGG CERT 15042022.pdf | 18 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PROJ 03 ARCH CERT 03012022.pdf | 6 Jan 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| AVON VISTA PROJECT 2P52100017914 | PUNE, Pune | Sep 2018 | Completed | Jun 2022 | Jan 1970 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 138 filed documents as one ZIP, foldered, with a manifest
Keep AVON VISTA PROJECT 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Filed coordinates, straight-line distance. 284 registered projects within 2 km.
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD
NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD has 2 registrations on MahaRERA, including AVON VISTA PROJECT -1 and AVON VISTA PROJECT 3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AVON VISTA PROJECT 3 is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AVON VISTA PROJECT 3?
The registered promoter entity is NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AVON VISTA PROJECT 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AVON VISTA PROJECT 3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AVON VISTA PROJECT 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AVON VISTA PROJECT 3?
The professionals named in the filing: Architect: GAURI H NAIKNAVARE; Engineer: KRUPALI KADAM; Chartered Accountant: SHRISHRIMAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AVON VISTA PROJECT 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback