AVIGHNA KARAN WING C

By AVIGHNA KARAN

RG-MH-28322 · RERA P51700030327 · Last updated on MahaRERA portal: 14 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 2 months past the filed date
  • Completion date moved by 20 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
18 of 142Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 207 documents Report an error

AVIGHNA KARAN WING C is a Residential / Group Housing project by AVIGHNA KARAN in Thane, Maharashtra, registered with MahaRERA as P51700030327 on 15 Aug 2021. Possession was promised by 31 Aug 2026 and is now 2 months past that date. The completion date has moved by 20 months from the original filing. 124 of the 142 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameAVIGHNA KARAN WING C
  • TypeResidential / Group Housing
  • Location
    • Pandurang Pawshe nagar
    • Pune Link Rd
    • Kalyan east
    • Kalyan east
    • KATEMANEVALI
    • Kalyan
    • Thane
    • 421306
  • Pincode421306
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700030327
  • ReraGenie IDRG-MH-28322

Builder

  • NameAVIGHNA KARAN
  • Entity typePartnership
  • PartnersPAWAN GOKUL POTDAR, BAKELAL PULLURAM SAROJ, SURAJ ARVIND GOSWAMI, VIKRAM ARVIND GOSWAMI, PUNEET GANESH INGLE, TRUPTI SAWAN POTDAR, SANDIP RAVINDRANATH PARAB, ROHIT SHARAD GAMBHIRRAO
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

2 months past promisethis monthRegisteredAug 2021First promiseDec 2024Revised toAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Aug 2021
  • Promised completion31 Aug 2026
  • Revised completionRevised to 31 Aug 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed207 files

Current status

87%124 of 142 units booked
85.7%Work done, per cost certificate

Figures as on 14 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVIGHNA KARAN WING CNA141413012142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

AVIGHNA KARAN WING C: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed146

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots146
Closed/Covered31
Open Space115

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,770 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Feb 2026
LandownerVillageDistrict
Baliram Padu PawsheKATEMANEVALIThane
MATHURABAI BALIRAM PAWSHEKATEMANEVALIThane
madan baliram pawsheKATEMANEVALIThane
pawshe sanjaybaliramKATEMANEVALIThane
VILAS MOTIRAM PAWSHEKATEMANEVALIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI9057.28
Proposed, not sanctioned5,863 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYAN WEST
Estimated costRs 24.30 cr
Cost incurredRs 20.82 cr
Work done85.69%
BuildingWingEstimatedIncurred
AVIGHNA KARAN WING CNARs 24.30 crRs 20.82 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDilipTambday & Assocites
EngineerNEEV ENGINEERING CONSULTANCY
EngineerDivesh Archarya
Chartered AccountantANKUR SANGOI
Chartered AccountantNikita Vishal Lapshia
Chartered AccountantAnkur Sangoi & Associates
PartnerRole in project
AVIGHNA KARAN-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700025802Dec 2024 → Dec 2025

Reason as filed by the promoterThe delay in the Avighnakaran C Wing project is attributed to several factors, primarily the introduction of the new UDCR, which required time for understanding and led to delays in submitting the revised sanctioned plan. Additionally, the emergence of COVID variants in 2021 caused widespread lockdowns, resulting in labor shortages and decreased construction speed due to health concerns. The pandemic also affected customer engagement, leading to a significant drop in bookings and restricted cash flow, as many customers faced financial difficulties. This financial strain resulted in a crisis in

EA14022619842Dec 2024 → Aug 2026

Reason as filed by the promoterJUSTIFICATION FOR EXRTENSION REQUIRED FOR PROJECT TILL 31.08.2026 Time line for Avighna Karan - C Wing Construction Work to be completed ➤ Till 31st December 2025, 100% of the construction work is completed. ➤ Occupancy Certificate process was started on dt. 15 ^ (th) Jan.2026 and will end by 31st Aug. 2026. but RERA got expired on 31 ^ (st) December 2025, for project closing purpose RERA extension required for upto 31 ^ (st) August 2026. So we request to allow us extension for project "Avighna Karan - C Wing" at Maharera till 31 ^ (st) August 2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed207

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 207 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2A site supervisor - engineer letter.pdf14 Aug 2026
Withdrawal Update Form 1File: form 1 -Architech letter.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 (Engineering certificate).pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - CA letter with promotor signed.pdf11 Aug 2026
Withdrawal Update Form 1File: Form 1 Architect certificate.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf10 Aug 2026
Withdrawal Update Form 1File: Form 1_Dec 2025.pdf12 Mar 2026
Withdrawal Update Form 2File: Form 2_Dec 2025.pdf12 Mar 2026
Withdrawal Update Form 3File: Avighna Karan C Wing_Form 3_Dec 2025_Final_Signed.pdf12 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 Avighna karan FY 2024-25_Signed and Stamp.pdf27 Feb 2026
Withdrawal Update Form 1File: Form 1_Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1_Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1_Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2_Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2_Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2_Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 3File: Avighna Karan C Wing_Form 3_Dec 2025_Final_Signed.pdf14 Feb 2026
Withdrawal Update Form 3File: Avighna Karan C Wing_Form 3_Dec 2025_Final_Signed.pdf14 Feb 2026
Withdrawal Update Form 3File: Avighna Karan C Wing_Form 3_Dec 2025_Final_Signed.pdf14 Feb 2026
Form 1File: Form 1 Sep 2023.pdf13 Feb 2026
Form 2File: Form 2_Sep 2023.pdf13 Feb 2026
Form 3File: Form 3 Sep 2023.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and Booked Inventory 30th Sept 2023.pdf13 Feb 2026
Form 1File: Form 1 June 2023.pdf13 Feb 2026
Form 2File: Form 2_June 2023.pdf13 Feb 2026
Form 3File: Form 3.pdf13 Feb 2026
Self-declaration of Quarterly ProgressFile: Self Declaration Regarding Form 3.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory (30th Jun 2023).pdf13 Feb 2026
Form 1File: Form 1_June 2022.pdf12 Feb 2026
Form 2File: Form 2_June 22.pdf12 Feb 2026
Form 3File: Form 3_June 2022_Self Declaration by Promoter.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate June 2022.pdf12 Feb 2026
Form 1File: Form 1_Sep 2022.pdf12 Feb 2026
Form 2File: Form 2_Sep 2022.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate Sep 2022.pdf12 Feb 2026
Self-declaration of Quarterly ProgressFile: Form 3_Sep 2022_Self Declaration by Promoter.pdf12 Feb 2026
Form 3File: Form 3_Sep 2022_Self Declaration by Promoter.pdf12 Feb 2026
Form 1File: Form 1_Dec 2022.pdf12 Feb 2026
Form 2File: Form 2_Dec 2022.pdf12 Feb 2026
Form 3File: Form 3_Dec 2022_Self Declaration by Promotor.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate Dec 2022.pdf12 Feb 2026
Self-declaration of Quarterly ProgressFile: Form 3_Dec 2022_Self Declaration by Promotor.pdf12 Feb 2026
Form 1File: Form 1_March 2023.pdf12 Feb 2026
Form 2File: Form 2_March 2023.pdf12 Feb 2026
Form 3File: Form 3 March 2023 Self Declaration By Promotor.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate March 2023.pdf12 Feb 2026
Self-declaration of Quarterly ProgressFile: Form 3 March 2023 Self Declaration By Promotor.pdf12 Feb 2026
Form 1File: Form 1 (Architect) 2023-24 Q4.pdf12 Feb 2026
Form 2File: Form 2 (Engineer) 2023-24 Q4.pdf12 Feb 2026
Form 3File: Form 3_March 2024_Declaration by promotors.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of inventory Q4_March 2024.pdf12 Feb 2026
Self-declaration of Quarterly ProgressFile: Form 3_March 2024_Declaration by promotors.pdf12 Feb 2026
Form 2A (FY 2021-2022)File: Form 2A FY 2021-22.pdf12 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A FY 2022-23.pdf12 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A (Supervisor) 2023-24 Q4.pdf12 Feb 2026
Form 2A (FY 2024-2025)File: (Form 2A)_FY 2024-25.pdf12 Feb 2026
Form 1File: (Form 1)_Architect Certificate 2023-24 Q3.pdf2 Feb 2026
Form 2File: (Form 2)_Engineer Certificate 2023-24 Q3.pdf2 Feb 2026
Form 3File: (Form 3)_CA Certificate_Avighna Karan C Wing_Q3_Dec 2023.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory_Q3_31st Dec 2023.pdf2 Feb 2026
Form 1File: (Form 1)_Architect Cetificate_Avighna Karan C_Wing_30th June 2024.pdf2 Feb 2026
Form 2File: (Form 2)_Engineers Certificate_Avighna Karan C Wing_30th June 2024.pdf2 Feb 2026
Form 3File: (Form 3)_CA Certificate_Avighna Karan C wing_30th June 2024.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory_Q1_30th June 2024.pdf2 Feb 2026
Form 1File: (Form 1)_Architect Certificate_Avighna Karan C Wing_30th Sep 2024.pdf2 Feb 2026
Form 2File: (Form 2)_Engineers Certificate Avighna Karan C Wing_30th Sep 2024.pdf2 Feb 2026
Form 3File: (Form 3)_CA Certificate_Avighna Karan C Wing_30th Sept 2024.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory_30th Sep 2024.pdf2 Feb 2026
Form 1File: (Form 1_Architect Certificate_Avighna Karan C Wing_31 Dec 2024.pdf2 Feb 2026
Form 2File: (Form 2)_Engineers Certificate Avighna Karan C Wing_31 Dec 2024.pdf2 Feb 2026
Form 3File: (Form 3)_CA Certificate_Avighna Karan C Wing_31 Dec 2024.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory_Q3_31 Dec 2024.pdf2 Feb 2026
Form 1File: (Form 1)_Architect Certificate_Avighna Karan C Wing_31st March 2025.pdf2 Feb 2026
Form 2File: (Form 2)_Engineers Certificate_Avighna Karan_31st March 2025.pdf2 Feb 2026
Form 3File: (Form 3)_CA Certificate_Avighna Karan C Wing_31st March 2025_Signed.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Sold and Booked Certificate_31st March 2025_Corrected.pdf2 Feb 2026
Form 1File: (Form 1)_Architect Certificate_Avighna Karan C wing_30th June 2025.pdf2 Feb 2026
Form 2File: (Form 2)_Engineers Certificate_Avighna Karan C Wing_30th June 2025.pdf2 Feb 2026
Form 3File: (Form 3)_CA Certificate_Avighna Karan C Wing_30th June 2025_Signed.pdf2 Feb 2026

How this compares with Thane

87%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 20 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVIGHNA KARAN WING C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan east7,600+ in Thane

Builder: AVIGHNA KARAN

AVIGHNA KARAN has 4 registrations on MahaRERA, including AVIGHNA KARAN WING A and AVIGHNA KARAN WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AVIGHNA KARAN WING C is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVIGHNA KARAN WING C?

The registered promoter entity is AVIGHNA KARAN, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVIGHNA KARAN WING C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVIGHNA KARAN WING C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVIGHNA KARAN WING C?

The professionals named in the filing: Architect: DilipTambday & Assocites; Engineer: NEEV ENGINEERING CONSULTANCY; Engineer: Divesh Archarya; Chartered Accountant: ANKUR SANGOI; Chartered Accountant: Nikita Vishal Lapshia; Chartered Accountant: Ankur Sangoi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVIGHNA KARAN WING C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVIGHNA KARAN WING C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVIGHNA KARAN WING C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.