ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Avighna Building No 4

Registered Litigation declared Residential / Group Housing project

Avighna Building No 4

By Chheda Developments

RG-MH-06620 · RERA P51700053193 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 30%
2 of 204Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Avighna Building No 4 is a Residential / Group Housing project by Chheda Developments in Thane, Maharashtra, registered with MahaRERA as P51700053193 on 17 Oct 2023. Possession is promised by 31 Dec 2027. 202 of the 204 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAvighna Building No 4
  • TypeResidential / Group Housing
  • Location
    • Ramdev Park Road
    • Chheda Greens
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053193
  • ReraGenie IDRG-MH-06620

Builder

  • NameChheda Developments
  • Entity typePartnership
  • GSTIN27AAFFC2547P1Z2
  • PartnersDilip Chheda, Manoj Chheda, Amish Chheda, Vishal Chheda, Deep Chheda, Chintan Chheda, Raj Chheda, Vatsal Chheda
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects3 →

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Current status

99%202 of 204 units booked
52.0%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Avighna Building No 4 Wing C and DNA27262040204

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 30%.

Avighna Building No 4 Wing C and D: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered1
Open Space24

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area631 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024

Approvals and building plan

Sanctioning authorityMBMC
Permissible FSI14406.26
Proposed, not sanctioned14,303 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShreeram Trade Centre, SVP Road, Chamunda Circle, Borivali West
Estimated costRs 78.51 cr
Cost incurredRs 40.84 cr
Work done52.01%
BuildingWingEstimatedIncurred
Avighna Building No 4 Wing C and DNARs 72.18 crRs 36.09 cr
-NARs 6.33 crRs 4.75 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD N Patel & Associates
ArchitectD.N.PATEL & ASSOCIATES
EngineerSangam Patel
EngineerNarendrasingh Gosain
Chartered AccountantShivratan Agarwal
Chartered AccountantP R GANDHI & CO LLP
PartnerRole in project
Chheda Developments-

Litigation declared2

CaseCourtStatus
219/2024Civil Court S. D ThaneClosed
62/2025/2025District Judge 6, ThaneClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form-2A_Engineers Certificate for Quality Assurance.pdf7 May 2026
Withdrawal Update Form 1File: Form 1 april 26.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2 april 26.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3 (Signed with Stamped).pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1 (Annexure A).pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 Dtd 19-01-2026.pdf22 Jan 2026
Withdrawal Update Form 1File: Architects Certificate by D N Patel u0026 Associates, Dated 10-10-2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Engineers Certificate by Sangam Patel_Dated 10-10-2025_removed.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 (Cerfiticate of Financial Progress of Work) by Shivratan Agarwal u0026 Asso, Dated 17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Avighna C & D 2025.pdf29 Sep 2025
Withdrawal Update Form 1File: AV4-Form1-170725.pdf24 Jul 2025
Withdrawal Update Form 2File: AV4-Form2-170725.pdf24 Jul 2025
Withdrawal Update Form 3File: Form 3_Shivratan Agarwal u0026 Asso_19-07-2025_compressed.pdf24 Jul 2025
Form 1File: Architects Certificate (Form 1)_D N Patel_08-04-2025 .pdf9 Jul 2025
Form 2File: Engineers Certificate (Form 2)_Sangam D Patel_08-04-2025.pdf9 Jul 2025
Form 3File: Form-3_Rera Working_March 2025 Final (1-27 MB).pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Declaration_31-03-2025.pdf9 Jul 2025
Form 2A (FY 2024-2025)File: Form-2A_31-03-2025.pdf30 May 2025
Form 2A (FY 2023-2024)26 May 2025
Form 5 (FY 2023-2024)File: Form 5 Avighna C & D-2024.pdf26 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate (Form 1)_D N Patel_08-04-2025 .pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Rera Working_March 2025 Final (1-27 MB).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate (Form 2)_Sangam D Patel_08-04-2025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory Declaration_31-03-2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate (Form 1)_D N Patel_11-01-2025 .pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate (Form 2)_Sangam D Patel_11-01-2025.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Declaration_31-12-2024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (Form 1)_Percentage of Comp Work_23-10-2024.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AV4-Form - 3_ RERA -working- sep-24 (1).pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINERS CERTIFICATE (FORM2)-23102024.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Inventory Declaration Dt 30-9-2024.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Avighna CD-2024.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Certificate_(Sangam D Patel)_08-07-2024.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Inventory Declaration_Building No 4.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 av4 DINESH PATEL CERITICATE Q4.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 av4 SANGAM CERTIFICATE Q4.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory Declaration_31-03-2024.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3-310324-150-50.pdf19 Apr 2024
Building plan approvalFile: CC-Plan-1-dt-02022024.pdf3 Feb 2024
Building plan approvalFile: CC-Plan-2-dt-02022024.pdf3 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: CC-Plan-1-dt-02022024.pdf3 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: CC-Plan-2-dt-02022024.pdf3 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-Cert_dt-02022024.pdf3 Feb 2024
Declaration about Commencement CertificateFile: Declaration of CC dt03022024.pdf3 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: New declaration about bank account format A.pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avi 4 Form 2A jan2024.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Declaration_13-01-24.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca CERTIFICATE.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final rera.pdf5 Oct 2023
Proforma of Agreement for saleFile: 75Agreement marked with Deviation as per Rera 0510.pdf5 Oct 2023
Deviation Report with respect to model copy of AgreementFile: 75Agreement deviations 0510.pdf5 Oct 2023
Copy of the legal title reportFile: Title Certificate 27092023.pdf28 Sep 2023
Other - TechnicalFile: Layout-11112022.pdf15 Sep 2023
Details of encumbrances concerned to FinanceFile: No Financial Encumbrance.pdf11 Sep 2023
Details of encumbrances concerned to LegalFile: No Financial Encumbrance.pdf11 Sep 2023
CERSAI detailsFile: Declaration for Non CERSAI Report-11-09-23.pdf11 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interestLH.pdf6 Sep 2023
Details of encumbrances concerned to FinanceFile: No Financial Encumbrance_Dtd 30-08-23.pdf3 Sep 2023
Details of encumbrances concerned to LegalFile: No Financial Encumbrance_Dtd 30-08-23.pdf3 Sep 2023
Declaration about Commencement CertificateFile: Form D Declaration of CC_Dtd 30-08-23.pdf2 Sep 2023
Declaration in FORM BFile: Form B Affidavit cum Declaration.pdf2 Sep 2023
Proforma of Allotment letterFile: Draft Allotment Letter.pdf2 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration abt Seprt Bank Ac_Format A_Dt 30-08-23.pdf2 Sep 2023
Deviation Report with respect to Allotment letterFile: No Deviation to Allotment Letter.pdf2 Sep 2023
Layout approvalFile: 97-300-Layout approval plan 01-09-2021 - Copy.pdf30 Aug 2023
Building plan approvalFile: Avi 4 Approved plans 29-10-2021_compressed (1).pdf30 Aug 2023
Building plan approvalFile: Avi 4 approved plan 11-11-2022.pdf30 Aug 2023
Layout approvalFile: 303 Avighna layout approval MBMC 01-09-2021.pdf30 Aug 2023
PAN CardFile: Pan.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: 97-300-Layout approval plan 01-09-2021 - Copy.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: 303 Avighna layout approval MBMC 01-09-2021.pdf30 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Avi 4 Approved plans 29-10-2021_compressed (1).pdf30 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Avi 4 approved plan 11-11-2022.pdf30 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement Certificate (CC) dt 19032020.pdf30 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate 29102021.pdf30 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Jai DevkiDevidas Road Borivali West139CompletedMar 2017Mar 2017

How this compares with Thane

99%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Avighna Building No 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chheda Greens7,600+ in Thane

2 kmAvighna Building No 4Completed 80Lapsed / revoked 69Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 244 registered projects within 2 km.

Builder: Chheda Developments

CHHEDA DEVELOPMENTS has 2 registrations on MahaRERA, including AVIGHNA BUILDING NO 3 and Avighna Building No 4. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Avighna Building No 4 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Avighna Building No 4?

The registered promoter entity is Chheda Developments, a partnership as per the filing. Its GSTIN 27AAFFC2547P1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Avighna Building No 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Avighna Building No 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Avighna Building No 4?

The professionals named in the filing: Architect: D N Patel & Associates; Architect: D.N.PATEL & ASSOCIATES; Engineer: Sangam Patel; Engineer: Narendrasingh Gosain; Chartered Accountant: Shivratan Agarwal; Chartered Accountant: P R GANDHI & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Avighna Building No 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Avighna Building No 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Avighna Building No 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.