Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
4 of 11Construction stages donefurthest along: Stilt Floor, 90%
1Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

AVF GREENS is a Others project by A.V.F. REALTY in Palghar, Maharashtra, registered with MahaRERA as P99000035188 on 10 May 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAVF GREENS
  • TypeOthers
  • Location
    • JUCHANDRA
    • NAIGAON (EAST)
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401207
  • Pincode401207
  • RERA no.P99000035188
  • ReraGenie IDRG-MH-86434

Builder

  • NameA.V.F. REALTY
  • Entity typePartnership
  • PartnersHUSSAIN ABBAS BOXWALA, ARSHAD ASAD SAYED, MOHAMMED SHOAIB LLYAS JATU

Key dates

this monthRegisteredMay 2022First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVF GREENS, BUILDING NO 1, WING A,B,CNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

AVF GREENS, BUILDING NO 1, WING A,B,C: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,463 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DAYANAND DAMODAR PATILVasai-Virar City (M Corp)Palghar
NELSON SIMON REBELLOVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI7495.67
Proposed, not sanctioned7,496 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAPPLIED

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
A.V.F. REALTY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000019555Dec 2023 → Dec 2024

Reason as filed by the promoterAS OF NOW PART COMENCEMENT CERTIFICATE RECEIVED AND AS PER COMENCEMENT CERTIFICATE CONSTRUCTION OF THE BUILDING COMPLETED BUT SOME INTERNAL MODIFICATION IN THE BUILDING - FOR THAT COMENCEMENT CERTIFICATE FROM THE AUTHORITY IS AWAITING

EXT99000026024Dec 2023 → Dec 2026

Reason as filed by the promoterWe received the revised development permission from the competent authority on 11.03.2024 for the construction of an additional unit in the wing.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602182Ashish Jiledar ShuklaA.V.F. REALTY13/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory-2026.pdf8 Mar 2025
Declaration in FORM BFile: Form-B Letest.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form- 1 29-06-2024.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-30-09-2024 (1).pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-12-2024.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 oct to dec.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 july to sep.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - April-2024 to June-2024.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked Inventory-25-01-2025.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - 29-06-2024.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - 30-09-2024.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - 31-12-2024.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - July-2024 to September-2024.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - October-2024 to December-2024.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - April-2024 to June-2024.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - 26-08-2024.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - 30-09-2024.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - 31-12-2024.pdf5 Feb 2025
Building plan approvalFile: Ground Floor Plan.pdf13 Jul 2024
Building plan approvalFile: 1 st Floor Plan.pdf13 Jul 2024
Building plan approvalFile: 2nd to 7 th and 9th to 10 th floor plan.pdf13 Jul 2024
Building plan approvalFile: 8th Floor Plan.pdf13 Jul 2024
Building plan approvalFile: Terrace Floor Plan.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Ground Floor Plan.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 st Floor Plan.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 2nd to 7 th and 9th to 10 th floor plan.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 8th Floor Plan.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Terrace Floor Plan.pdf13 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A - 2022-23.pdf11 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A - 2023-24 final.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 April 22 to June 22 (3).pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 july 22 to September 22.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 October 22 to December 22 (1).pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 October 22 to December 22 (1).pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 January 23 to March 23.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 April 23 to June 23 (1).pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 July 23 to September 23.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 October 23 to December 23.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 January 24 to March 24.pdf11 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architect's Certificate.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer's Certificate.pdf7 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - (2023-2024).pdf7 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA - Form (5) - (2022-2023).pdf7 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA - Form (5) - (2023 -2024).pdf7 Jun 2024
Declaration in FORM BFile: Form-B.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate-Form 2 A (1).pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf6 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate-FORM 2.pdf6 Apr 2024
Disclosure of sold/ booked inventoryFile: Discoluser of Sold - Booked Inventory.pdf6 Apr 2024
Proforma of Agreement for saleFile: AGREEMENT BLANK PDF.pdf6 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MR ARSHAD ASAD SAYED.pdf10 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MR HUSSAIN ABBAS BOXWALA.pdf10 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MR MOHAMMED SHOAIB JATU.pdf10 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration about Finanace Encumbrances (1).pdf2 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration about Finanace Encumbrances (1).pdf2 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declartion about Saprate Bank (1).pdf2 Feb 2024
Deviation Report with respect to Allotment letterFile: Declaration of deviation of Allotment Letter (1).pdf2 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Declaration deviation of Agreement for Sale (2).pdf2 Feb 2024
Copy of the legal title reportFile: SEARCH TITLE REVISED.pdf29 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Revised_1.pdf23 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Revised_2.pdf23 Apr 2022
Layout approvalFile: Plan (5).pdf8 Apr 2022
Building plan approvalFile: Plan (5).pdf8 Apr 2022
PAN CardFile: avf realty pan card.pdf8 Apr 2022
Details of encumbrancesFile: AVF Encum Letter.pdf8 Apr 2022
Copy of Layout Approval (in case of layout)File: Plan (5).pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan (5).pdf8 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Apr 2022
Declaration about Commencement CertificateFile: Declaration certificate.pdf8 Apr 2022
Declaration in FORM BFile: AVF Javed Undertaking.pdf8 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200234852615_For_Asset_Based_Search_08_04_2022_17_57_56_132.pdf8 Apr 2022
CERSAI detailsFile: GENERAL DECLARATION LETTER.pdf8 Apr 2022
Proforma of Allotment letterFile: Agreement for Sale - RERA-1.pdf8 Apr 2022
Proforma of Allotment letterFile: allotment letter format.pdf8 Apr 2022

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 36 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVF GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAIGAON (EAST)3,200+ in Palghar

Builder: A.V.F. REALTY

A.V.F. REALTY has 1 registration on MahaRERA, including AVF GREENS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if AVF GREENS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVF GREENS?

The registered promoter entity is A.V.F. REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVF GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AVF GREENS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AVF GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in AVF GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVF GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVF GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.