Red flags

  • Rs 50.00 crore secured on the land, in favour of ADITYA BIRLA CAPITAL LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 65%
76 of 199Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

AVENTIS is a Residential / Group Housing project by DEVSIA INFRACON LLP in Pune, Maharashtra, registered with MahaRERA as P52100080336 on 22 May 2025. Possession is promised by 21 Jun 2030. 123 of the 199 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameAVENTIS
  • TypeResidential / Group Housing
  • Location
    • PUNE BANGLORE EXPRESSWAY
    • PAWAR NAGAR DATTAWADI
    • Tathwade
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080336
  • ReraGenie IDRG-MH-32441

Builder

  • NameDEVSIA INFRACON LLP
  • Entity typePartnership
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2025PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2025
  • Promised completion21 Jun 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Current status

62%123 of 199 units booked
39.3%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING BNA31261990199

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 65%.

WING B: 9% average across the applicable activities

ActivityProgress
Excavation65%
Basement (if any)30%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed182

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots182
Closed/Covered182

Land and ownership13

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area12,745 sq m
Land owned byNot the promoter
Named landowners13
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA CAPITAL LIMITED
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on16 Oct 2025
LandownerVillageDistrict
GORAKHNATH BAPU PAWARWakadPune
SANJEEVANI GORAKHNATH PAWARWakadPune
YOGESH GORAKHNATH PAWARWakadPune
POONAM DYANESHWAR YELWANDEWakadPune
NARESH SURESH GARADEWakadPune
KISAN BABURAO GARADEWakadPune
MANISHA MUKUND GARADEWakadPune
RUSHIKESH MUKUND GARADEWakadPune
VRUSHALI NITIN OZARKARWakadPune
KIRAN NATHU PAWARWakadPune
DURVA ASSOCIATESWakadPune
KRISALA ELITE LLPWakadPune
Malan Kisan GaradeWakadPune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI23401.29
Proposed, not sanctioned23,401 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 12,13,14, SUKHWANI PACIFIC PHASE2, S NO 31 OPP ADITYA BIRLA HOSPITAL,PUNE 411033
Estimated costRs 14.89 cr
Cost incurredRs 5.85 cr
Work done39.28%
BuildingWingEstimatedIncurred
WING BNARs 14.31 crRs 5.85 cr
-NARs 58.39 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK A ARCHITECTURE
EngineerHrushikesh Vilas Mindhe
Chartered AccountantS O SHARMA AND CO
PartnerRole in project
DEVSIA INFRACON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 21 Jun 2030

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 01-10 - Highlighted Layout.pdf30 Apr 2026
Building plan approvalFile: 02-10 - Wing B.pdf30 Apr 2026
Building plan approvalFile: 03-10 - Wing B.pdf30 Apr 2026
Building plan approvalFile: 04-10 - Wing B.pdf30 Apr 2026
Building plan approvalFile: 05-10 - Wing B.pdf30 Apr 2026
Building plan approvalFile: 06-10 - Wing B.pdf30 Apr 2026
Building plan approvalFile: 07-10 - Wing B.pdf30 Apr 2026
Building plan approvalFile: 08-10 - Wing B.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 - Aventis as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 - Aventis as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 - Aventis as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 AVENTIS 31122025.pdf14 Apr 2026
Withdrawal Update Form 3File: Form 3 - Aventis as on Dec 2025.pdf14 Apr 2026
Withdrawal Update Form 1File: Form 1 - Aventis as on Sep 2025.pdf13 Apr 2026
Withdrawal Update Form 2File: Form 2 AVENTIS 30092025.pdf13 Apr 2026
Withdrawal Update Form 3File: Form 3 AVENTIS 27102025.pdf13 Apr 2026
Layout approvalFile: 01-14.pdf12 Sep 2025
Building plan approvalFile: 02-14.pdf12 Sep 2025
Building plan approvalFile: 03-14.pdf12 Sep 2025
Building plan approvalFile: 04-14.pdf12 Sep 2025
Building plan approvalFile: 05-14.pdf12 Sep 2025
Building plan approvalFile: 06-14.pdf12 Sep 2025
Building plan approvalFile: 07-14.pdf12 Sep 2025
Building plan approvalFile: 08-14.pdf12 Sep 2025
Building plan approvalFile: 09-14.pdf12 Sep 2025
Building plan approvalFile: 10-14.pdf12 Sep 2025
Building plan approvalFile: 11-14.pdf12 Sep 2025
Building plan approvalFile: 12-14.pdf12 Sep 2025
Building plan approvalFile: 13-14.pdf12 Sep 2025
Building plan approvalFile: 14-14.pdf12 Sep 2025
Form 1File: Form 1 - Aventis as on June 2025.pdf12 Aug 2025
Form 2File: Form 2 - Aventis as on June 2025.pdf12 Aug 2025
Form 3File: Form 3 - Aventis as on June 2025.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Aventis as on June 2025.pdf12 Aug 2025
Other - LegalFile: Exchang Deed01943820250517123033-38-74_11zon.pdf19 May 2025
Other - LegalFile: Exchang Deed01943820250517123033-1-37_11zon_rotated.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASR DECLARATION.pdf16 Apr 2025
Other - FinanceFile: ASR DECLARATION.pdf16 Apr 2025
Copy of the legal title reportFile: TSR - Aventies - Adv Parvesh 190525_11zon.pdf7 Apr 2025
Other - FinanceFile: ALLOTMENT DECLARATION.pdf6 Apr 2025
Other - LegalFile: 7 12.pdf20 Mar 2025
Other - LegalFile: EXCHANGE DEED 2.pdf20 Mar 2025
Other - LegalFile: EXCHANGE DEED 1.pdf20 Mar 2025
Other - LegalFile: SD VEDEPATIL.pdf20 Mar 2025
Other - LegalFile: SD 16.pdf20 Mar 2025
Other - LegalFile: SD 10.pdf20 Mar 2025
Other - LegalFile: SD 9.pdf20 Mar 2025
Other - LegalFile: SD 4.pdf20 Mar 2025
Other - LegalFile: SD 3.pdf20 Mar 2025
Other - LegalFile: SD 2.pdf20 Mar 2025
Other - LegalFile: SD 1.pdf20 Mar 2025
Other - LegalFile: SD 15.pdf20 Mar 2025
Other - FinanceFile: BANK DECLARATION LANDOWNER.pdf20 Mar 2025
Other - TechnicalFile: ALLOTMENT DECLARATION.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INETREST MAHESH.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INETREST SAGAR.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST AKASH.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST ANUP.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST GOYAL 1.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST GOYAL 2.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST OMPRAKASH.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST ROHIT.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST SANTOSH.pdf20 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST VISHAL.pdf20 Mar 2025
Layout approvalFile: LAYOUT.pdf11 Mar 2025
Building plan approvalFile: PLAN 1_compressed.pdf11 Mar 2025
Building plan approvalFile: PLAN 2_compressed.pdf11 Mar 2025
Building plan approvalFile: PLAN 3_compressed.pdf11 Mar 2025
Building plan approvalFile: PLAN 4_compressed.pdf11 Mar 2025
Building plan approvalFile: PLAN 5_compressed.pdf11 Mar 2025
Building plan approvalFile: PLAN 6_compressed.pdf11 Mar 2025
Building plan approvalFile: PLAN 7.pdf11 Mar 2025
Building plan approvalFile: PLAN 8.pdf11 Mar 2025
Building plan approvalFile: PLAN 9.pdf11 Mar 2025
Building plan approvalFile: PLAN 10_compressed.pdf11 Mar 2025
PAN CardFile: PAN CARD.pdf11 Mar 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES DETAILS.pdf11 Mar 2025
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf11 Mar 2025

How this compares with Pune

62%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVENTIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PAWAR NAGAR DATTAWADI13,700+ in Pune

2 kmAVENTISCompleted 86Lapsed / revoked 33Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 228 registered projects within 2 km.

Builder: DEVSIA INFRACON LLP

DEVSIA INFRACON LLP has 3 registrations on MahaRERA, including AVENTIS and Aventis - Tower A. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AVENTIS is delayed beyond 21 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVENTIS?

The registered promoter entity is DEVSIA INFRACON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVENTIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVENTIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVENTIS?

The professionals named in the filing: Architect: VK A ARCHITECTURE; Engineer: Hrushikesh Vilas Mindhe; Chartered Accountant: S O SHARMA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVENTIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVENTIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVENTIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.