Home / Browse projects / Pune, Maharashtra / AVASA MEADOWS TALEGAON

Registration lapsed No litigation declared Plotted project

AVASA MEADOWS TALEGAON

By NAIKNAVARE TOWNSHIP LLP

RG-MH-44421 · RERA P52100047658 · Last updated on MahaRERA portal: 20 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
61 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

AVASA MEADOWS TALEGAON is a Plotted project by NAIKNAVARE TOWNSHIP LLP in Pune, Maharashtra, registered with MahaRERA as P52100047658 on 17 Nov 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 1 of the 62 units on this registration are recorded sold or booked.

At a glance

Project

  • NameAVASA MEADOWS TALEGAON
  • TypePlotted
  • Location
    • WADGAON
    • Wadagaon (CT)
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047658
  • ReraGenie IDRG-MH-44421

Builder

  • NameNAIKNAVARE TOWNSHIP LLP
  • Entity typeCompany
  • DirectorRANJIT DATTAJI NAIKNAVARE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredNov 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Nov 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed121 files

Current status

2%1 of 62 units booked

Figures as on 20 Jan 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes25%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,859 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RANJIT DATTAJI NAIKNAVAREPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityWADGAON NAGARPANCHAYAT
Permissible FSI17645.38
Proposed, not sanctioned12,939 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWRANGLER PARANJAPE ROAD, JM ROAD PUNE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantKKSS AND ASSOCIATES
PartnerRole in project
NAIKNAVARE TOWNSHIP LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AVASA MEADOWS FORM 1.pdf20 Jan 2026
Form 2File: AVASA MEADOWS FORM 2.pdf20 Jan 2026
Form 3File: AVSA TALEGAON.PDF20 Jan 2026
Disclosure of Sold and Booked InventoryFile: AVASA MEADOWS SOLD UNSOLD.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Certificate_avasa meadows (1).pdf29 Dec 2025
Form 1File: AVASA MEADOWS FORM 1.pdf15 Oct 2025
Form 2File: AVASA MEADOWS FORM 2.pdf15 Oct 2025
Form 3File: AVASA TALEGAON FORM 3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: AVASA MEADOWS SOLD UNSOLD.pdf15 Oct 2025
Form 1File: AVASA MEADOWS FORM 1_compressed (1).pdf20 Jul 2025
Form 2File: AVASA MEADOWS FORM 2.pdf20 Jul 2025
Form 3File: Avasa Talegaon Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Avasa Meadows Talegaon.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: AVASA MEADOWS SELF DECLARATION.pdf20 Jul 2025
Disclosure of sold/ booked inventoryFile: Avasa Meadows Talegaon Plot - Disclosure Sold Booked.pdf23 Apr 2025
Building plan approval or NA orderFile: 1compressed.pdf14 Apr 2025
Building plan approval or NA orderFile: 2compressed.pdf14 Apr 2025
Building plan approval or NA orderFile: 3compressed.pdf14 Apr 2025
Building plan approval or NA orderFile: 4compressed.pdf14 Apr 2025
Building plan approval or NA orderFile: 5compressed.pdf14 Apr 2025
Building plan approval or NA orderFile: 6compressed.pdf14 Apr 2025
Building plan approval or NA orderFile: 7 EDIT NALA compressed print.pdf14 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 1compressed.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2compressed.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3compressed.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4compressed.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5compressed.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 6compressed.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 7 EDIT NALA compressed print.pdf14 Apr 2025
Declaration about Commencement CertificateFile: CC.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA TALEGOAN -MEADOWS.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa Meadows.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Talegaon.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA TALEGAON MERGED_compressed (1) (1).pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AVASA MEADOWS 2A.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA MEADOWS.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA TALEGAON.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: AVASA MEADOWS.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 10 24 RERA ARCH CERTIFICATE AVASA MEADOWS.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 10 24 RERA ARCH CERTIFICATE AVASA MEADOWS.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certificate avasa meadows.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: avasa talegaonm5_compressed.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Talegaon.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa Meadows.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: 7 Disclosure of sold_ booked inventory (1).pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa talegaon.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA TALEGAON.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA MEADOWS.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: AVASA MEADOWS.pdf10 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: AVASA MEADOWS.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa Meadows.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa talegaon.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA TALEGAON.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: AVASA TALEGAON.pdf6 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avasa Meadows.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA MEADOWS.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA TALEGAON (1)_compressed.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA TALEGOAN.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avasa Meadows.pdf6 Jan 2024
Other - TechnicalFile: AVASA.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: AVASA MEADOWS.pdf5 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA GROVELAND.pdf4 Jan 2024
Disclosure of sold/ booked inventoryFile: AVASA GROVELAND.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA MEADOWS.pdf2 Jan 2024
Other - TechnicalFile: Avasa.pdf16 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Talegaon_compressed (3).pdf7 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avasa Meadows.pdf10 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AVASA MEADOWS FORM 5 2022 23.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: AVASA MEADOWS SOLD UNSOLD JUL SEP 23.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA MEADOWS FORM 1 JUL SEP 23 (2).pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA MEADOWS FORM 1 JUL SEP 23.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA MEADOWS FORM 1 APR JUN 23.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avasa Talegaon.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Talegaon FORM 3 APR JUN 23.pdf1 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avasa.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Avasa Meadows.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA-ARCH CERTIFICATE JAN TO MAR 2023.pdf10 Apr 2023
Disclosure of sold/ booked inventoryFile: Avasa Meadows_compressed.pdf10 Apr 2023

How this compares with Pune

2%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVASA MEADOWS TALEGAON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADGAON13,700+ in Pune

2 kmAVASA MEADOWS TALEGAONCompleted 163Lapsed / revoked 118Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: NAIKNAVARE TOWNSHIP LLP

NAIKNAVARE TOWNSHIP LLP has 2 registrations on MahaRERA, including AVASA MEADOWS TALEGAON and Aranya. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that AVASA MEADOWS TALEGAON shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AVASA MEADOWS TALEGAON is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVASA MEADOWS TALEGAON?

The registered promoter entity is NAIKNAVARE TOWNSHIP LLP, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVASA MEADOWS TALEGAON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVASA MEADOWS TALEGAON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVASA MEADOWS TALEGAON?

The professionals named in the filing: Chartered Accountant: KKSS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVASA MEADOWS TALEGAON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVASA MEADOWS TALEGAON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVASA MEADOWS TALEGAON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.