Home / Browse projects / Thane, Maharashtra / AVANTIKA

Registered No litigation declared Residential / Group Housing project

AVANTIKA

By SIYARA REALTY PRIVATE LIMITED

RG-MH-18519 · RERA P51700077257 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 63%
124 of 200Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

AVANTIKA is a Residential / Group Housing project by SIYARA REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700077257 on 31 Jul 2024. Possession is promised by 31 Dec 2028. 76 of the 200 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameAVANTIKA
  • TypeResidential / Group Housing
  • Location
    • TEMGHAR
    • Bhiwandi (M Corp.)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700077257
  • ReraGenie IDRG-MH-18519

Builder

  • NameSIYARA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU41001MH2023PTC404661
  • GSTIN27ABLCS0457Q1ZL
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsKAPIL PUNJALAL PATEL, RAJESH PUNJALAL PATEL
  • Other registrations3 more →

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed56 files

Current status

38%76 of 200 units booked
41.9%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVANTIKANA27252000200

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 63%.

AVANTIKA: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure63%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered53
Open Space40

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,791 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
Sajid Moinuddin KharbeBhiwandi (M Corp.)Thane
Vijaykumar Bhawarlal jainBhiwandi (M Corp.)Thane
Rajendrakumar Bhawarlal JainBhiwandi (M Corp.)Thane
Bharat Bhawarlal JainBhiwandi (M Corp.)Thane
Bhamini Ram BhoiBhiwandi (M Corp.)Thane
Chaitanya Ram BhoiBhiwandi (M Corp.)Thane
Babita Chandrashekhar GuptaBhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityBhiwandi-Nizampur Municipal Corporation
Permissible FSI13848.24
Proposed, not sanctioned13,848 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 11, 12, Gr Floor, Lodha Amara, Kolshet Rd, opposite Sandozbaug Post Office, Samata Nagar, Sainath Nagar, Majiwada, Thane, Maharashtra 400607
Estimated costRs 41.93 cr
Cost incurredRs 17.56 cr
Work done41.88%
BuildingWingEstimatedIncurred
AVANTIKANARs 41.86 crRs 17.56 cr
-NARs 7.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR K ASSOCIATES
EngineerASCON AARNA STRUCTURAL CONSULTANTS
EngineerS K STRUCTURAL ENGINEERING
Chartered AccountantN D CHHEDA and Associates
Chartered AccountantNakrani and Co
PartnerRole in project
SIYARA REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM_1_Avantika_Q4_FY 2025-26_Signed.pdf20 May 2026
Withdrawal Update Form 2File: FORM_2_Avantika_Q4_FY 2025-26_Signed.pdf20 May 2026
Withdrawal Update Form 3File: Form3_Avantika_Q4_Fy2025-26_Signed.pdf20 May 2026
Withdrawal Update Form 1File: FORM_1_AVANTIKA_Q3_FY 2025-26_signed.pdf24 Jan 2026
Withdrawal Update Form 2File: FORM_2_AVANTIKA_Q3_FY 2025-26_signed.pdf24 Jan 2026
Withdrawal Update Form 3File: FORM 3 AVANTIKA Q3 FY 2025-26 signed.pdf24 Jan 2026
Form 2A (FY 2024-2025)File: FORM_2A_AVANTIKA_FY 2024-25-Signed.pdf17 Dec 2025
Withdrawal Update Form 1File: FORM_1_Avantika_Q2_FY_2025-26_signed.pdf27 Nov 2025
Withdrawal Update Form 2File: FORM_2_Avantika_Q2_FY_2025-26_signed.pdf27 Nov 2025
Withdrawal Update Form 3File: FORM_3_AVANTIKA_Q2_FY_2025-26_Signed.pdf27 Nov 2025
Form 1File: AVANTIKA_FORM1_Q4_2024-25.pdf13 Aug 2025
Form 2File: AVANTIKA_FORM2_Q4_2024-25.pdf13 Aug 2025
Form 3File: Form 3_Avantika_Siyara Realty_Q4_Signed.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory_Mar 25_Avantika.pdf13 Aug 2025
Withdrawal Update Form 1File: Form 1_Avantika_Q1_FY 2025-26_signed.pdf13 Aug 2025
Withdrawal Update Form 2File: Form 2_Avantika_Q1_FY 2025-26_signed.pdf13 Aug 2025
Withdrawal Update Form 3File: Form_3_Avantika_Q1_2025-26-Signed.pdf13 Aug 2025
Form 5 (FY 2024-2025)File: Form 5_Avantika_FY 24-25_System genearated_Signed.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVANTIKA_FORM1_Q4_2024-25.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Avantika_Siyara Realty_Q4_Signed.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVANTIKA_FORM2_Q4_2024-25.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory_Mar 25_Avantika.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Avantika-Dec 24.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Avantika_Siyara Realty_Dec 24_Signed.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II_AVANTIKA_Dec 24.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I_Architect Certiifcate_Q2_FY 2024-2025.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Avantika_Siyara Realty_Q2_FY 24-25_Signed.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Engineer Certificate Q2_FY 2024-2025.pdf23 Nov 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbarance_Avantika_Siyara Realty Pvt Ltd.pdf14 Oct 2024
Details of encumbrances concerned to LegalFile: Finance Encumbarance_Avantika_Siyara Realty Pvt Ltd.pdf14 Oct 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbarance_Avantika_Siyara Realty Pvt Ltd.pdf14 Oct 2024
Details of encumbrances concerned to LegalFile: Finance Encumbarance_Avantika_Siyara Realty Pvt Ltd.pdf14 Oct 2024
Copy of the legal title reportFile: Legal Title Report_Avantika 04-07-2024.pdf17 Jul 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER_AVANTIKA.pdf17 Jul 2024
Proforma of Allotment letterFile: 04072024 Allotment letter Avantika.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Avantika_Siyara Realty.pdf27 Jun 2024
Proforma of Agreement for saleFile: Draft_AFS_AVANTIKA_Final.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Architect Certificate_Avantika.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II_Engineer Certificate_Avantika.pdf21 Jun 2024
Other - LegalFile: Annx A_Order 50_Avantika.pdf21 Jun 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE_Avantika.pdf20 Jun 2024
Declaration in FORM BFile: FORM B_Developers_Avantika Project.pdf20 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to Model Cpoy of Agreement_Avantika.pdf20 Jun 2024
Details of encumbrances concerned to FinanceFile: Declaration Of No Finance Encumbrances_Avantika.pdf19 Jun 2024
Details of encumbrances concerned to FinanceFile: Declaration Of No Legal Encumbrances_Avantika.pdf19 Jun 2024
Details of encumbrances concerned to LegalFile: Declaration Of No Finance Encumbrances_Avantika.pdf19 Jun 2024
Details of encumbrances concerned to LegalFile: Declaration Of No Legal Encumbrances_Avantika.pdf19 Jun 2024
CERSAI detailsFile: Declaration Of Non Applicability Of report Form Cersai_Avantika.pdf19 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST IN OTHER ORGANIZATION_Avantika.pdf19 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Seperate Bank Ac For real estate Project_Avantika.pdf19 Jun 2024
Layout approvalFile: Builidng Plan B Plot_A building.pdf13 Jun 2024
Building plan approvalFile: Project Layout Plan B Plot_A Building.pdf13 Jun 2024
Copy of Layout Approval (in case of layout)File: Builidng Plan B Plot_A building.pdf13 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Project Layout Plan B Plot_A Building.pdf13 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_Avantika_Siyara Realty.pdf13 Jun 2024
PAN CardFile: Pan Card_Siyara Realty Pvt Ltd.pdf12 Jun 2024

How this compares with Thane

38%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVANTIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TEMGHAR7,600+ in Thane

Builder: SIYARA REALTY PRIVATE LIMITED

SIYARA REALTY PRIVATE LIMITED has 4 registrations on MahaRERA, including SIYARA AVENUE and AVANTIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AVANTIKA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVANTIKA?

The registered promoter entity is SIYARA REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U41001MH2023PTC404661 and GSTIN 27ABLCS0457Q1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVANTIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVANTIKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVANTIKA?

The professionals named in the filing: Architect: R K ASSOCIATES; Engineer: ASCON AARNA STRUCTURAL CONSULTANTS; Engineer: S K STRUCTURAL ENGINEERING; Chartered Accountant: N D CHHEDA and Associates; Chartered Accountant: Nakrani and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVANTIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVANTIKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVANTIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.