Home / Browse projects / Raigarh, Maharashtra / AVANTIKA AURA
AVANTIKA AURA
RG-MH-07520 · RERA P52000055495 · Last updated on MahaRERA portal: 14 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AVANTIKA AURA is a Residential / Group Housing project by RIDDHI DEVELOPER in Raigarh, Maharashtra, registered with MahaRERA as P52000055495 on 2 Apr 2024. Possession is promised by 31 Dec 2026. 3 of the 65 units on this registration are recorded sold or booked, and 2 of 8 construction stages are filed complete.
At a glance
Project
- NameAVANTIKA AURA
- TypeResidential / Group Housing
- Location
- PLOT NO 97B 97C 98
- DRONAGIRI
- Uran
- Raigarh
- 400702
- Pincode400702
- RERA no.P52000055495
- ReraGenie IDRG-MH-07520
Builder
- NameRIDDHI DEVELOPER
- Entity typePartnership
- PartnersPRAKASH NANJI PATEL, SHANTILAL SHIVGAN PATEL, KARTIK SHANKARLAL BHADRA, RAJESH HANSRAJ PATEL, CHANDULAL SHIVGAN PATEL, CHHAYA RAJESH PATEL, JIGNA PRAKASH PATEL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Apr 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 14 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AVANTIKA AURA | AVANTIKA AURA | 8 | 8 | 52 | 13 | 65 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 8 construction stages are filed complete. The stage furthest along is Staircases, at 76%.
AVANTIKA AURA · wing AVANTIKA AURA: 58% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 76% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 68% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 8% |
Progress on shared amenities15
As on 14 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AVANTIKA AURA | AVANTIKA AURA | Rs 4.63 cr | Rs 2.97 cr |
| - | NA | Rs 46.40 lakh | Rs 2.40 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL |
| Engineer | SAMARTH AGRAWAL |
| Chartered Accountant | L K Dedhia & Co |
| Chartered Accountant | RAVI THAKKAR |
| Partner | Role in project |
|---|---|
| RIDDHI DEVELOPER | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Jun 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jun 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 DEC 25.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 DEC 25.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 25.pdf | 14 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 SEPT 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 SEPT 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 SEPT 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 SEPT 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 SEPT 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 SEPT 25.pdf | 13 Feb 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 JUN 25.pdf | 26 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 JUN 25.pdf | 26 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3 JUN 25.pdf | 26 Sep 2025 |
| Layout approvalFile: REVISED PLAN 1.pdf | 5 Jun 2025 |
| Building plan approvalFile: REVISED PLAN 1.pdf | 5 Jun 2025 |
| Withdrawal Update Form 1File: FORM 1 MAR 25.pdf | 5 Jun 2025 |
| Withdrawal Update Form 2File: FORM 2 MAR 25.pdf | 5 Jun 2025 |
| Withdrawal Update Form 3File: FORM 3 MAR 25.pdf | 5 Jun 2025 |
| Form 1File: FORM 1 JUN 24.pdf | 29 May 2025 |
| Form 2File: FORM 2 JUN 24.pdf | 29 May 2025 |
| Form 3File: FORM 3 JUN 24.pdf | 29 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 24.pdf | 29 May 2025 |
| Form 1File: FORM 1 SEPT 24.pdf | 29 May 2025 |
| Form 2File: FORM 2 SEPT 24.pdf | 29 May 2025 |
| Form 3File: FORM 3 SEPT 24.pdf | 29 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 24.pdf | 29 May 2025 |
| Form 1File: FORM 1 DEC 24.pdf | 29 May 2025 |
| Form 2File: FORM 2 DEC 24.pdf | 29 May 2025 |
| Form 3File: FORM 3 DEC 24.pdf | 29 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 24.pdf | 29 May 2025 |
| Building plan approvalFile: REVISED PLAN 1.pdf | 27 May 2025 |
| Form 1File: FORM 1 MAR 25.pdf | 22 May 2025 |
| Form 2File: FORM 2 MAR 25.pdf | 22 May 2025 |
| Form 3File: FORM 3 MAR 25.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNOLD MAR 25.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MAR 24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUN 24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 24.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUN 24.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 24.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MAR 24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUN 24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 24.pdf | 20 Feb 2025 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 20 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AFS.pdf | 4 Mar 2024 |
| Copy of the legal title reportFile: TITLE.pdf | 13 Feb 2024 |
| Other - LegalFile: Lease Agreement PLOT NO 97B.pdf | 13 Feb 2024 |
| Other - LegalFile: Lease Agreement PLOT NO 98.pdf | 13 Feb 2024 |
| Other - LegalFile: Lease Deed PLOT NO 97C.pdf | 13 Feb 2024 |
| Other - TechnicalFile: Declaration cum Undertaking.pdf | 13 Feb 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 1 Feb 2024 |
| Other - LegalFile: TP PLOT 97C.pdf | 1 Feb 2024 |
| Other - LegalFile: TP Plot no 97B.pdf | 1 Feb 2024 |
| Other - LegalFile: TP PLOT NO 98.pdf | 1 Feb 2024 |
| Other - LegalFile: AMALGAMATION.pdf | 1 Feb 2024 |
| Other - TechnicalFile: CC EMAIL FROM CIDCO TO MAHARERA.pdf | 1 Feb 2024 |
| Layout approvalFile: BUILDING PLAN.pdf | 9 Jan 2024 |
| Building plan approvalFile: BUILDING PLAN.pdf | 9 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: NO Encumbrance Finance.pdf | 9 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Legal.pdf | 9 Jan 2024 |
| Details of encumbrances concerned to LegalFile: NO Encumbrance Finance.pdf | 9 Jan 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Legal.pdf | 9 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: BUILDING PLAN.pdf | 9 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf | 9 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf | 9 Jan 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf | 9 Jan 2024 |
| CERSAI detailsFile: CERSAI.pdf | 9 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 9 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Firm CHANDULAL.pdf | 9 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Firm chhaya.pdf | 9 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Firm Jigna.pdf | 9 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other firm kartik.pdf | 9 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Firm prakash.pdf | 9 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Firm Rajesh.pdf | 9 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AVANTIKA AURA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DRONAGIRI5,900+ in Raigarh
VILLA ONE
Khodiyar Realtech LLP
Gami Bianca
LAL GEBI INFRA PRIVATE LIMITED
MAHAAVIR LABDHI PHASE 1
MAHAAVIR BUILDCON LLP
Siddhivinayak- Anaya
DIVYADRISHTI BUILDCON PRIVATE LIMITED
Horizon Landmark
GREENSCAPE KALPANA STRUCT CON
Grand Uran Central
Tycoons Altofin Realty
See every Raigarh project, with the district possession charts
Builder: RIDDHI DEVELOPER
RIDDHI DEVELOPER has 1 registration on MahaRERA, including AVANTIKA AURA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if AVANTIKA AURA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AVANTIKA AURA?
The registered promoter entity is RIDDHI DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AVANTIKA AURA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AVANTIKA AURA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AVANTIKA AURA?
The professionals named in the filing: Architect: ATUL PATEL; Engineer: SAMARTH AGRAWAL; Chartered Accountant: L K Dedhia & Co; Chartered Accountant: RAVI THAKKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AVANTIKA AURA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback