Home / Browse projects / Mumbai Suburban, Maharashtra / AVANT HERITAGE - III

Registered No litigation declared Residential / Group Housing project

AVANT HERITAGE - III

By Avant Heritage III Realty LLP

RG-MH-30081 · RERA P51800029940 · Last updated on MahaRERA portal: 27 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Basement (if any), 98%
31 of 244Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 205 documents Report an error

AVANT HERITAGE - III is a Residential / Group Housing project by Avant Heritage III Realty LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029940 on 15 Jul 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 213 of the 244 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameAVANT HERITAGE - III
  • TypeResidential / Group Housing
  • Location
    • Kashinath Gawkar Road
    • Jogeshwari East
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • RERA no.P51800029940
  • ReraGenie IDRG-MH-30081

Builder

  • NameAvant Heritage III Realty LLP
  • Entity typeOthers
  • Named personAvant Heritage III Realty LLP

Key dates

this monthRegisteredJul 2021First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jul 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed205 files

Current status

87%213 of 244 units booked
92.6%Work done, per cost certificate

Figures as on 27 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVANT HERITAGE - IIINA27232440244

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 98%.

AVANT HERITAGE - III: 93% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)98%
Podiums (if any)95%
Plinth100%
Stilt Floor97%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.68%

Progress on shared amenities15

As on 27 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered112

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,634 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jan 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilation Authority
Permissible FSI18645.0
Proposed, not sanctioned7,739 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAhura Center, Ground Floor, mahakali Caves Road, Andheri East, Mumbai 400093
Estimated costRs 94.60 cr
Cost incurredRs 87.57 cr
Work done92.58%
BuildingWingEstimatedIncurred
AVANT HERITAGE - IIINARs 94.60 crRs 87.57 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDaddy and Associates
ArchitectAbdul Qadir Architect
EngineerShailendra Yadav
EngineerAssociated Consultant
EngineerConstruxo
Chartered AccountantSudheendra Kumar
Chartered AccountantAtul Poddar
Chartered AccountantSEN & RAY
PartnerRole in project
Avant Heritage III Realty Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07012619336Dec 2025 → Dec 2026

Reason as filed by the promoterOngoing MOEF issue

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed205

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 205 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate_ AH3 - Quater ended 31032026.pdf27 Aug 2026
Withdrawal Update Form 1File: Form 1 - AH - 03 Quater Ending 30th June 2026.pdf27 Aug 2026
Withdrawal Update Form 2File: AH-III Form 2 Quater ended 31st March 2026.pdf27 Aug 2026
Withdrawal Update Form 2File: Form 2 AH - III Ending 30th June 2026.pdf27 Aug 2026
Withdrawal Update Form 3File: Form 3 AH-III Q4 31-03-26 PDF Copy.pdf27 Aug 2026
Withdrawal Update Form 3File: Form 3 AH-III Q1 3062026.pdf27 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A Engineer Certifcate for Quality Assurance AH 03 year end march 2025.pdf6 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A AH III 2024_2025.pdf2 Feb 2026
Withdrawal Update Form 1File: Architect Certificate AHIII 21-04-2023.pdf30 Jan 2026
Withdrawal Update Form 2File: AH III Engineer Certificate.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 AH-III Q3 31_12_25.pdf30 Jan 2026
Form 1File: AHIII Form 1 Q2 30_09_2025.pdf24 Nov 2025
Form 2File: AHIII Form 2 Q2 30_09_2025.pdf24 Nov 2025
Form 3File: AHIII Form 3 Q2 30_09_2025.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: AHIII SOLD UNSOLD Q2 30_09_2025.pdf24 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AH III 31032025.pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AH III 30062025.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AH-III 31032025.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AH-III 30062025.pdf28 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AH III 31032025.pdf28 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AH III 30062025.pdf28 Jul 2025
Form 1File: Form 1 AH III 30062025.pdf28 Jul 2025
Form 2File: Form 2 AH III 30062025.pdf28 Jul 2025
Form 3File: Form 3 AH-III 30062025 pdf.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: AH-III dt 30062025.pdf28 Jul 2025
Form 1File: Form 1 AH III 31032025.pdf28 Jul 2025
Form 2File: Form 2 AH III 31032025.pdf28 Jul 2025
Form 3File: Form 3 AH-III 31032025.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: AH-III dt 31032025.pdf28 Jul 2025
Form 1File: Form 1 AH III 31032025.pdf28 Jul 2025
Form 2File: Form 2 AH III 31032025.pdf28 Jul 2025
Form 3File: Form 3 AH-III 31032025.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: AH-III dt 31032025.pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form1_30_6_2024.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form1_30_09_2024.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form1_AH3 - Quater ended 31_12_2024.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form1_ AH3 - Quater ended 31032025.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 AH3_Quarter Ended_31-12-2023.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 AH3_Quarter Ended_31-03-2024.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 AH3_Quarter Ended_30-09-2024.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 AH3_Quarter Ended_31-12-2024.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 AH3_Quarter Ended_31-03-2025.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 AH-III as on 30062024.pdf12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 AH-III as on 31032025.pdf12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 AH-III as on 31122024.pdf12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 AH-III as on 30092024.pdf12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 AH-III as on 31032024.pdf12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 AH-III as on 31122023.pdf12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 AH-III as on 30092023.pdf12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 AH3_Quarter Ended_30-09-2023.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 AH3_Quarter Ended_30-09-2023.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 AH3_Quarter Ended_31-12-2023.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 AH3_Quarter Ended_31-03-2024.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 AH3_Quarter Ended_30-06-2024.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 AH3_Quarter Ended_30-09-2024.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 AH3_Quarter Ended_31-12-2024.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 AH3_Quarter Ended_31-03-2025.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 AH3_Quarter Ended_30-06-2024.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 AH3_Quarter Ended_30-09-2024.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 AH3_Quarter Ended_31-12-2024.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 AH3_Quarter Ended_31-03-2025.pdf12 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Form 3 AH-III as on 31032024.pdf12 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: CC of AH3.pdf18 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf28 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf29 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf14 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 AH-IIIRPL_31032023 (2) Dtd 31-05-2023- final.pdf14 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: AH III Account Change.pdf5 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate AHIII 21-04-2023.pdf22 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AH III Engineer Certificate.pdf22 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form-3_AH-III 11-04-2023.pdf13 Apr 2023
Details of encumbrancesFile: Self Declaration For Encumbrance.pdf24 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf24 Mar 2023
Building plan approvalFile: IOD.pdf25 Jan 2023
Building plan approvalFile: plan1.pdf25 Jan 2023
Building plan approvalFile: plan2.pdf25 Jan 2023
Building plan approvalFile: plan3.pdf25 Jan 2023

How this compares with Mumbai Suburban

87%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVANT HERITAGE - III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jogeshwari East6,700+ in Mumbai Suburban

Builder: Avant Heritage III Realty LLP

Avant Heritage III Realty LLP has 1 registration on MahaRERA, including AVANT HERITAGE - III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AVANT HERITAGE - III is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVANT HERITAGE - III?

The registered promoter entity is Avant Heritage III Realty LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVANT HERITAGE - III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVANT HERITAGE - III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVANT HERITAGE - III?

The professionals named in the filing: Architect: Daddy and Associates; Architect: Abdul Qadir Architect; Engineer: Shailendra Yadav; Engineer: Associated Consultant; Engineer: Construxo; Chartered Accountant: Sudheendra Kumar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVANT HERITAGE - III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVANT HERITAGE - III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVANT HERITAGE - III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.