ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors

Completed No litigation declared Residential / Group Housing project

Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors

By Aishwarya Avant Builders LLP

RG-MH-44654 · RERA P51800015537 · Last updated on MahaRERA portal: 10 Mar 2023

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Podiums (if any), 95%
5Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors is a Residential / Group Housing project by Aishwarya Avant Builders LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800015537 on 7 Mar 2018. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 18 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NameAvant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors
  • TypeResidential / Group Housing
  • Location
    • Digambar Mhaskar Marg
    • Majas Village
    • Near Jain Temple
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800015537
  • ReraGenie IDRG-MH-44654

Builder

  • NameAishwarya Avant Builders LLP
  • Entity typeOthers
  • PartnersSudeep Kumar Saha, Harsh Rajnikant Shah
  • Named personSudeep Saha
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMar 2018First promiseJun 2021Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Mar 2018
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Avant Heritage II - Basement plus Stilt plus 3 Podium plus 8 Habitable floors - Part BuildingNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 95%.

Avant Heritage II - Basement plus Stilt plus 3 Podium plus 8 Habitable floors - Part Building: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor95%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 10 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes50%
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered112

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,294 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Samruddhi Infrastructure and Developers Pvt. Ltd.BorivaliMumbai Suburban

Approvals and building plan

Permissible FSI5242.84
Proposed, not sanctioned5,243 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAhura centre Mahakali caves Raod Andheri east Mumbai400093

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshutosh A Kane
ArchitectM/s Daddy & Associates
EngineerPedanekar & Associates
EngineerSukanta Biswas
PartnerRole in project
Aishwarya Avant Builders LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009255Jun 2021 → Jun 2022

Reason as filed by the promoter3 SRA Engineers Executive Engineer PralhadMahisi, Assistant Engineer DhananjaySuryavanshi, Sub-Engineer ChandrashekharDhigavkar, being the concerned Engineers, were booked by the Anti-Corruption Bureau for demanding bribe and the said news was reported in Times of India on 31-05-2019, the LokSabha elections held in the year 2019 also contributed to the non-availability of the concerned officers of SRA, the boundary wall of adjoining residential building Paras Nagar CHS Ltd. collapsed on 31st January 2018and the members of the Society lodged Police complaint FIR with Meghwadi Police station res

Litigation declared3

CaseCourtStatus
1308/2019High Court MumbaiOngoing
482/2022High Court MumbaiPre Admission
482/2022High Court Mumbaipre Admission

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC006000000171648Rajeshwari Ramesh PillaiAishwarya Avant Builders LLP23/11/2019
CC006000000192629Sonal Vijay NirwanAishwarya Avant Builders LLP15/02/2020
CC006000000220900Amit MehtaMr. Sudeep Saha27/05/2022
CC006000000397507Patricia VincentAishwarya Avant Builders LLP19/09/2023
CC12401207Radheshyam MandoraAishwarya Avant Builders LLP23/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Feb 2023

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 _ AH2.pdf10 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC Letter.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan 1.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan 2.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan 3.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan 4.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan 5.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan 6.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan 7.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan 8.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5 AABPL Heritage II.pdf17 Nov 2022
Other - TechnicalFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for22 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC.pdf21 Sep 2022
Building plan approvalFile: Amended IOA.pdf13 Jul 2022
Building plan approvalFile: Amended IOA PLAN 1.pdf13 Jul 2022
Building plan approvalFile: Amended IOA PLAN 2.pdf13 Jul 2022
Building plan approvalFile: Amended IOA PLAN 3.pdf13 Jul 2022
Building plan approvalFile: Amended IOA PLAN 4.pdf13 Jul 2022
Building plan approvalFile: Amended IOA PLAN 5.pdf13 Jul 2022
Building plan approvalFile: Amended IOA PLAN 6.pdf13 Jul 2022
Building plan approvalFile: Amended IOA PLAN 7.pdf13 Jul 2022
Building plan approvalFile: Amended IOA PLAN 8.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA PLAN 1.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA PLAN 2.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA PLAN 3.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA PLAN 4.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA PLAN 5.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA PLAN 6.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA PLAN 7.pdf13 Jul 2022
Building Plan Approval (IOD)File: Amended IOA PLAN 8.pdf13 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Amended commencement certificate.pdf13 Jul 2022
Certificates of CA (Form 3)File: Form 3 AABPLtd.pdf2 Mar 2022
Building plan approvalFile: Revised IOA.pdf26 Feb 2022
Building plan approvalFile: Revised IOA_1.pdf26 Feb 2022
Building plan approvalFile: Revised IOA_2.pdf26 Feb 2022
Building plan approvalFile: Revised IOA_3.pdf26 Feb 2022
Building plan approvalFile: Revised IOA_4.pdf26 Feb 2022
Building Plan Approval (IOD)File: Revised IOA.pdf26 Feb 2022
Building Plan Approval (IOD)File: Revised IOA_1.pdf26 Feb 2022
Building Plan Approval (IOD)File: Revised IOA_2.pdf26 Feb 2022
Building Plan Approval (IOD)File: Revised IOA_3.pdf26 Feb 2022
Building Plan Approval (IOD)File: Revised IOA_4.pdf26 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf26 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AAB LLP II.pdf21 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AAB LLP II.pdf21 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_2018-2019.pdf14 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-2020.pdf14 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: AH2_CC.pdf1 Apr 2021
Building plan approvalFile: Amended IOA Letter.pdf22 Sep 2020
Building plan approvalFile: Amended IOA PLan.pdf22 Sep 2020
Building Plan Approval (IOD)File: Amended IOA Letter.pdf22 Sep 2020
Building Plan Approval (IOD)File: Amended IOA PLan.pdf22 Sep 2020
Details of encumbrancesFile: Non encumbarance _Revised.pdf5 Apr 2019
Declaration in FORM BFile: Form B_Revised.pdf5 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Revised.pdf5 Apr 2019
Certificates of CA (Form 3)File: CA Certificate_Revised.pdf5 Apr 2019
Certificates of CA (Form 5)File: Form-5.pdf31 Oct 2018
Building plan approvalFile: AH2_IOA_ LETTER_15022018.pdf20 Feb 2018
Layout approvalFile: Layout Plan.pdf20 Feb 2018
PAN CardFile: Aishwarya Avant Builders LLP- Pan Card.pdf20 Feb 2018
Copy of the legal title reportFile: Title Certificate.pdf20 Feb 2018
Details of encumbrancesFile: Encumbrance certificate with Index II.pdf20 Feb 2018
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf20 Feb 2018
Building Plan Approval (IOD)File: AH2_IOA_ LETTER_15022018.pdf20 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: AH2_CC_ LETTER_15022018.pdf20 Feb 2018
Declaration in FORM BFile: Form B - Promoter.pdf20 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf20 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-ilovepdf-compressed.pdf20 Feb 2018
Certificates of CA (Form 3)File: Form 3.pdf20 Feb 2018
Proforma of Allotment letterFile: RERA Agreement and Allotment Letter.pdf20 Feb 2018

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Avant Heritage II-Basement plus stilt plus 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Majas Village, Near Jain Temple6,700+ in Mumbai Suburban

2 kmAvant Heritage II-BasemeCompleted 80Lapsed / revoked 37Abeyance 1Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 204 registered projects within 2 km.

Builder: Aishwarya Avant Builders LLP

Aishwarya Avant Builders LLP has 2 registrations on MahaRERA, including Avant Heritage I and Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors?

The registered promoter entity is Aishwarya Avant Builders LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors?

The professionals named in the filing: Architect: Ashutosh A Kane; Architect: M/s Daddy & Associates; Engineer: Pedanekar & Associates; Engineer: Sukanta Biswas. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Avant Heritage II-Basement plus stilt plus 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.