ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Avaneesh

Registered No litigation declared Residential / Group Housing project

Avaneesh

By Ambika Nawu Buildcon

RG-MH-82659 · RERA P52100051029 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 24 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 50%
30 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 137 documents Report an error

Avaneesh is a Residential / Group Housing project by Ambika Nawu Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100051029 on 22 May 2023. Possession is promised by 30 Apr 2027. The completion date has moved by 24 months from the original filing. 0 of the 30 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameAvaneesh
  • TypeResidential / Group Housing
  • Location
    • Colony Road
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051029
  • ReraGenie IDRG-MH-82659

Builder

  • NameAmbika Nawu Buildcon
  • Entity typePartnership
  • PartnersAtit Deven Shah, Vilas Dhaku Anivase, Nikhil Kishor Bhoje, Chinmay Vijay Gore

Key dates

this monthRegisteredMay 2023First promiseApr 2025Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2023
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Apr 2025)
  • Buildings1 building record
  • Documents filed137 files

Current status

0%0 of 30 units booked

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AvaneeshNA4430030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

Avaneesh: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Open Space7

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area550 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI885.32
Proposed, not sanctioned885 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar Road

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIcons Associates Mr Rajendra Gaikwad Rajendra Gaikwad
EngineerAjay Bhilare & Associates
EngineerYASH SERVICES
Chartered AccountantSPAK & CO
Chartered AccountantBogati & Co.
PartnerRole in project
Ambika Nawu Buildcon-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028196Apr 2025 → Apr 2027

Reason as filed by the promoterI was planning to expand the project, but there was a delay in receiving the sanction plan from the local authority. This setback has postponed our project timeline as we need the official approval to proceed with the expansion

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed137

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A 2024 2025.pdf15 Jun 2026
Form 1File: Avaneesh Form 1 June 2023.pdf9 Oct 2025
Form 2File: June 2023.pdf9 Oct 2025
Form 3File: June 2023.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: June 2023 Sold disclosure.pdf9 Oct 2025
Form 1File: Avaneesh Form 1 Sep 2023.pdf9 Oct 2025
Form 2File: Form 2 Sep 2023.pdf9 Oct 2025
Form 3File: Ambika Form 3 Sep 2023.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sep 2023 Sold disclosure.pdf9 Oct 2025
Form 1File: Avaneesh Form 1 Dec 2023.pdf9 Oct 2025
Form 2File: Form 2 Dec 2023.pdf9 Oct 2025
Form 3File: Ambika Form 3 Dec 2023.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Dec 2023 Sold disclosure.pdf9 Oct 2025
Form 1File: Avaneesh Form 1 Mar 2024.pdf9 Oct 2025
Form 2File: Form 2 Mar 2024.pdf9 Oct 2025
Form 3File: Ambika Form 3 Mar 2024.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Mar 2024 Sold disclosure.pdf9 Oct 2025
Form 1File: Avaneesh Form 1 June 2024.pdf9 Oct 2025
Form 2File: Form 2 June 2024.pdf9 Oct 2025
Form 3File: Ambika Form 3 June 2024.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Jun 2024 Sold disclosure.pdf9 Oct 2025
Form 1File: Avaneesh Form 1 Sep 2024.pdf9 Oct 2025
Form 2File: Form 2 Sep 2024.pdf9 Oct 2025
Form 3File: Ambika Form 3 Sep 2024.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sep 2024 Sold disclosure.pdf9 Oct 2025
Form 1File: Avaneesh Form 1 Dec 2024.pdf9 Oct 2025
Form 2File: Form 2 Dec 2024.pdf9 Oct 2025
Form 3File: Ambika Form 3 Dec 2024.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Dec 2024 Sold disclosure.pdf9 Oct 2025
Form 1File: Avaneesh Form 1 March 2025.pdf9 Oct 2025
Form 2File: Form 2 March 2025.pdf9 Oct 2025
Form 3File: Ambika Form 3 March 2025.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: March 2025 Sold Disclosure.pdf9 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_Avaneesh Ambika_FY 2024-25.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avaneesh Form 1 Dec 2024.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 March 25.pdf13 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambika Form 3 Dec 2024.pdf13 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambika Form 3 March 2025.pdf13 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC.pdf13 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2025.pdf13 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold disclosure DEC 2024.pdf13 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold disclosure March 25.pdf13 Jun 2025
Declaration in FORM BFile: FORM B Avaneesh.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avaneesh F3 Sep 2024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avaneesh F3 June 2024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avaneesh F3 Mar 2024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avaneesh F3 Dec 2023.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avaneesh F3 Sep 2023.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avaneesh F3 June 2023.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambika Form 3 Sep 2024.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambika Form 3 June 2024.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambika Form 3 Dec 2023.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambika Form 3 Sep 2023.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambika Form 3 Mar 2024.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2024.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2023.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ambika 2A 2022-23.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ambika 2A 2023-24.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avaneesh Form 1 Sep 2024.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avaneesh Form 1 June 2024.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avaneesh Form 1 Mar 2024.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avaneesh Form 1 Dec 2023.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avaneesh Form 1 Sep 2023.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep 2023.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: Mar 2024 Sold disclosure.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Sep 2024 Sold disclosure.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Jun 2024 Sold disclosure.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Dec 2023 Sold disclosure.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Sep 2023 Sold disclosure.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: June 2023 Sold disclosure.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sep 23.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun 23.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 24.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun 24.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 24.pdf2 Dec 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Avaneesh on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

2 kmAvaneeshCompleted 127Lapsed / revoked 37Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 244 registered projects within 2 km.

Builder: Ambika Nawu Buildcon

Ambika Nawu Buildcon has 1 registration on MahaRERA, including Avaneesh. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Avaneesh is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Avaneesh?

The registered promoter entity is Ambika Nawu Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Avaneesh?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Avaneesh?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Avaneesh?

The professionals named in the filing: Architect: Icons Associates Mr Rajendra Gaikwad Rajendra Gaikwad; Engineer: Ajay Bhilare & Associates; Engineer: YASH SERVICES; Chartered Accountant: SPAK & CO; Chartered Accountant: Bogati & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Avaneesh?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Avaneesh. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Avaneesh to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.