Home / Browse projects / Pune, Maharashtra / Avalon City - Wing A
Avalon City - Wing A
By Classic Promoters and Builders Private Limited
RG-MH-27560 · RERA P52100033953 · Last updated on MahaRERA portal: 22 Sep 2025
Source: official MahaRERA filing
Red flags
- De-registered
- Possession 19 months past the filed date
- Litigation declared, 6 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Avalon City - Wing A is a Commercial project by Classic Promoters and Builders Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100033953 on 14 Mar 2022. Possession was promised by 31 Mar 2025 and is now 19 months past that date. 0 of the 7 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameAvalon City - Wing A
- TypeCommercial
- Location
- Pune
- Pimpri Chinchawad (M Corp.)
- Haveli
- 411012
- Pincode411012
- RERA no.P52100033953
- ReraGenie IDRG-MH-27560
Builder
- NameClassic Promoters and Builders Private Limited
- Entity typeCompany
- CINU70101MH1988PTC047131
- GSTIN27AABCC1200C1ZN
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorAshok Dhanraj Chordia
- Other registrations14 more →
- Completed4 of 15
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on14 Mar 2022
- Promised completion31 Mar 2025
- Revised completionNone
- Buildings1 building record
- Documents filed108 files
Current status
Figures as on 22 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 6 | 4 | 0 | 7 | 7 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 62%.
Wing A: 20% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 62% |
| Podiums (if any) | 0% |
| Plinth | 62% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mrs Shobhadevi Narsinha Shinde | Pune (M Corp.) | Pune |
| Shri Deepak Narsinha Shinde | Pune (M Corp.) | Pune |
| Shri Chetan Narsinha Shinde | Pune (M Corp.) | Pune |
| Shri Ajit Gunajirao Ghule | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 5.91 cr | Rs 1.64 cr |
| - | NA | Rs 52.17 lakh | Rs 1.95 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Avinash Nawathe Architects |
| Architect | ANA Consortium Pvt Ltd |
| Engineer | Sunil Mutalik & Associates |
| Engineer | Swapnil Sonawane |
| Chartered Accountant | SPAK & CO |
| Partner | Role in project |
|---|---|
| Classic Promoters and Builders Private Limited | - |
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 586/2013/2013 | DISTRICT COURT PUNE | MATTER IS POSTED FOR FINAL ARGUMENTS |
| 628/2013/2013 | DISTRICT COURT PUNE | Ongoing |
| 56/2019/2019 | DISTRICT COURT PUNE | Ongoing |
| RCA/100586/2013/2013 | D R Shetty | Ongoing |
| (STAMP NO. CRAST/27533/2019 ) OF 2019/2019 | Shri S R Agarwal Registrar(JUDL II) | Ongoing |
| RCA/100628/2013/2013 | 78 D R Shetty | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Avalon City Wing A -Form 5-FY 24-25.pdf | 22 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avalon Wing A - Mar 25.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avalon Wing A - Mar 25.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Mar 25.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - Avalon Wing A - Mar 25.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Avalon City Wing A - Mar 25.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Avalon Wing A - Jun 22.pdf | 15 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Avalon Wing A - Sept 22.pdf | 15 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Avalon Wing A - Dec 22.pdf | 15 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avalon Wing A March-2023.pdf | 15 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Avalon City - Wing A - Jun 2024.pdf | 15 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _Wing A- Mar 22.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avalon City Wing A - Mar 24.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avalon Wing A- Sept 24.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Wing A - Jun 24.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avalon City Wing A - Dec 23.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Wing A - Sept 23.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Avalon City - Wing A - Jun 23.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avalon Wing A - Mar 23.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Wing A - Dec 22.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Wing A- Sept -22.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Avalon City Wing A - Jun 22.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Mar 22.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Avalon Wing A Jun-2022.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Sept 22.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Dec 22.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avalon Wing A - Mar 23.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Jun 2023.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Sept 23.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Avalon Wing A - Dec 23.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Mar 24.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avalon City - Wing A - Jun 2024.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avalon Wing A - Sept 24.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avalon Wing A - Dec 24.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - Avalon city Wing A - Dec 24.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avalon Wing A - Dec 24.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Avalon Wing A - Form 5 - FY 23-24.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avalon Wing A - Sept 24.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Discloure - Wing A- Sept 2024.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - Avalon Wing A - Mar 24.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - Wing A - Jun 24.pdf | 8 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 - Mar 24- Avalon City Wing A.pdf | 18 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A - Mar 24 - Avalon City Wing A.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Wing A - Sept 23.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Avalon City Wing A- Dec 23 Sold Disclosure.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Avalon City Wing A - Dec 23.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A - Avalon Wing - A- Dec 23.pdf | 8 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Avalon wing A Sept 23 Sold Disclosure.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Wing A FY 22-23.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Avalon Wing A - Sept 2023.pdf | 6 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avalon City Wing A Jun 23.pdf | 28 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Avalon City Wing A.pdf | 20 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CPABPL Form 2A Avalon City A.pdf | 11 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Avalon_City_WingA_March2023.pdf | 11 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Avalon City Wing A March 2023.pdf | 12 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avalon Wing A March-2023.pdf | 5 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold_Disclosure_Avalon_City_WingA_Dec_22.pdf | 27 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Avalon Wing A Dec-22.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: AvalonCity_A_Sep_22.pdf | 21 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Avalon Wing A.pdf | 30 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Avalon City Wing A Jun 2022 Sold Summary.pdf | 10 Aug 2022 |
| Declaration about Commencement CertificateFile: Avalon City Wing A.pdf | 7 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A - Avalon city A wing - Mar 22.pdf | 7 Apr 2022 |
| PAN CardFile: PAN Card CLASSIC PROMOTER.pdf | 4 Mar 2022 |
| Layout approvalFile: 1 LAYOUT PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 2 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 3 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 4 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 5 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 6 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 7 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 8 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 9 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 10 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 11 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 12 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 13 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 14 BUILING PLAN.pdf | 28 Feb 2022 |
| Building plan approvalFile: 15 BUILING PLAN.pdf | 28 Feb 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Avalon C-3 | Pimpri Chinchwad Pune 411012 | 47 | Completed | Dec 2019 | Late, Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
Keep Avalon City - Wing A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune13,700+ in Pune
GREEN PARK
SANTOSH MHADEO ATOLE
AVALON CITY - C5 and C6
Classic Promoters and Builders Private Lim
MAYUR SKYLIFE
BUNTY HOMES
Avalon City - C2
Classic Promoters and Builders Private Lim
HORIZON HARMONY
RAMGEET DEVELOPERS
KATE RAMDARA
KATE RAMDARA DEVELOPERS
Builder: Classic Promoters and Builders Private Limited
Classic Promoters and Builders Private Limited has 15 registrations on MahaRERA, including AVALON CITY C-3 and MUDRA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Avalon City - Wing A shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Avalon City - Wing A is delayed beyond 31 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Avalon City - Wing A?
The registered promoter entity is Classic Promoters and Builders Private Limited, a company as per the filing. Its CIN U70101MH1988PTC047131 and GSTIN 27AABCC1200C1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Avalon City - Wing A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Avalon City - Wing A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Avalon City - Wing A?
The professionals named in the filing: Architect: Avinash Nawathe Architects; Architect: ANA Consortium Pvt Ltd; Engineer: Sunil Mutalik & Associates; Engineer: Swapnil Sonawane; Chartered Accountant: SPAK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Avalon City - Wing A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback