Home / Browse projects / Pune, Maharashtra / Avalon City - Wing A

De-registered Litigation declared Commercial project

Avalon City - Wing A

By Classic Promoters and Builders Private Limited

RG-MH-27560 · RERA P52100033953 · Last updated on MahaRERA portal: 22 Sep 2025

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 19 months past the filed date
  • Litigation declared, 6 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
1 of 11Construction stages donefurthest along: Basement (if any), 62%
7 of 7Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Avalon City - Wing A is a Commercial project by Classic Promoters and Builders Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100033953 on 14 Mar 2022. Possession was promised by 31 Mar 2025 and is now 19 months past that date. 0 of the 7 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameAvalon City - Wing A
  • TypeCommercial
  • Location
    • Pune
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • 411012
  • Pincode411012
  • RERA no.P52100033953
  • ReraGenie IDRG-MH-27560

Builder

  • NameClassic Promoters and Builders Private Limited
  • Entity typeCompany
  • CINU70101MH1988PTC047131
  • GSTIN27AABCC1200C1ZN
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorAshok Dhanraj Chordia
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

19 months past promisethis monthRegisteredMar 2022PromisedMar 2025

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on14 Mar 2022
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

0%0 of 7 units booked
25.8%Work done, per cost certificate

Figures as on 22 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA64077

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 62%.

Wing A: 20% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)62%
Podiums (if any)0%
Plinth62%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Open Space19

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area409 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Mrs Shobhadevi Narsinha ShindePune (M Corp.)Pune
Shri Deepak Narsinha ShindePune (M Corp.)Pune
Shri Chetan Narsinha ShindePune (M Corp.)Pune
Shri Ajit Gunajirao GhulePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI1370.65
Proposed, not sanctioned1,371 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAUNDH
Estimated costRs 6.43 cr
Cost incurredRs 1.66 cr
Work done25.79%
BuildingWingEstimatedIncurred
Wing ANARs 5.91 crRs 1.64 cr
-NARs 52.17 lakhRs 1.95 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash Nawathe Architects
ArchitectANA Consortium Pvt Ltd
EngineerSunil Mutalik & Associates
EngineerSwapnil Sonawane
Chartered AccountantSPAK & CO
PartnerRole in project
Classic Promoters and Builders Private Limited-

Litigation declared6

CaseCourtStatus
586/2013/2013DISTRICT COURT PUNEMATTER IS POSTED FOR FINAL ARGUMENTS
628/2013/2013DISTRICT COURT PUNEOngoing
56/2019/2019DISTRICT COURT PUNEOngoing
RCA/100586/2013/2013D R ShettyOngoing
(STAMP NO. CRAST/27533/2019 ) OF 2019/2019Shri S R Agarwal Registrar(JUDL II)Ongoing
RCA/100628/2013/201378 D R ShettyOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Avalon City Wing A -Form 5-FY 24-25.pdf22 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avalon Wing A - Mar 25.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avalon Wing A - Mar 25.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Mar 25.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Disclosure - Avalon Wing A - Mar 25.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Avalon City Wing A - Mar 25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Avalon Wing A - Jun 22.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Avalon Wing A - Sept 22.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Avalon Wing A - Dec 22.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avalon Wing A March-2023.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Avalon City - Wing A - Jun 2024.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _Wing A- Mar 22.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avalon City Wing A - Mar 24.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avalon Wing A- Sept 24.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Wing A - Jun 24.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avalon City Wing A - Dec 23.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Wing A - Sept 23.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Avalon City - Wing A - Jun 23.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avalon Wing A - Mar 23.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Wing A - Dec 22.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Wing A- Sept -22.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Avalon City Wing A - Jun 22.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Mar 22.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Avalon Wing A Jun-2022.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Sept 22.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Dec 22.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avalon Wing A - Mar 23.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Jun 2023.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Sept 23.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Avalon Wing A - Dec 23.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Mar 24.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avalon City - Wing A - Jun 2024.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avalon Wing A - Sept 24.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avalon Wing A - Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avalon Wing A - Dec 24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Disclosure - Avalon city Wing A - Dec 24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avalon Wing A - Dec 24.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Avalon Wing A - Form 5 - FY 23-24.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avalon Wing A - Sept 24.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Discloure - Wing A- Sept 2024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Disclosure - Avalon Wing A - Mar 24.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Disclosure - Wing A - Jun 24.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 - Mar 24- Avalon City Wing A.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A - Mar 24 - Avalon City Wing A.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Wing A - Sept 23.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Avalon City Wing A- Dec 23 Sold Disclosure.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Avalon City Wing A - Dec 23.pdf8 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A - Avalon Wing - A- Dec 23.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: Avalon wing A Sept 23 Sold Disclosure.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Wing A FY 22-23.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Avalon Wing A - Sept 2023.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avalon City Wing A Jun 23.pdf28 Jul 2023
Disclosure of sold/ booked inventoryFile: Avalon City Wing A.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CPABPL Form 2A Avalon City A.pdf11 Jul 2023
Disclosure of sold/ booked inventoryFile: Avalon_City_WingA_March2023.pdf11 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Avalon City Wing A March 2023.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avalon Wing A March-2023.pdf5 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold_Disclosure_Avalon_City_WingA_Dec_22.pdf27 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Avalon Wing A Dec-22.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: AvalonCity_A_Sep_22.pdf21 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Avalon Wing A.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: Avalon City Wing A Jun 2022 Sold Summary.pdf10 Aug 2022
Declaration about Commencement CertificateFile: Avalon City Wing A.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A - Avalon city A wing - Mar 22.pdf7 Apr 2022
PAN CardFile: PAN Card CLASSIC PROMOTER.pdf4 Mar 2022
Layout approvalFile: 1 LAYOUT PLAN.pdf28 Feb 2022
Building plan approvalFile: 2 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 3 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 4 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 5 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 6 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 7 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 8 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 9 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 10 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 11 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 12 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 13 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 14 BUILING PLAN.pdf28 Feb 2022
Building plan approvalFile: 15 BUILING PLAN.pdf28 Feb 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Avalon C-3Pimpri Chinchwad Pune 41101247CompletedDec 2019Late, Feb 2020

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Avalon City - Wing A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: Classic Promoters and Builders Private Limited

Classic Promoters and Builders Private Limited has 15 registrations on MahaRERA, including AVALON CITY C-3 and MUDRA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Avalon City - Wing A shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Avalon City - Wing A is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Avalon City - Wing A?

The registered promoter entity is Classic Promoters and Builders Private Limited, a company as per the filing. Its CIN U70101MH1988PTC047131 and GSTIN 27AABCC1200C1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Avalon City - Wing A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Avalon City - Wing A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Avalon City - Wing A?

The professionals named in the filing: Architect: Avinash Nawathe Architects; Architect: ANA Consortium Pvt Ltd; Engineer: Sunil Mutalik & Associates; Engineer: Swapnil Sonawane; Chartered Accountant: SPAK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Avalon City - Wing A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Avalon City - Wing A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Avalon City - Wing A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.