KATE RAMDARA
RG-MH-50501 · RERA P52100049127 · Last updated on MahaRERA portal: 22 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KATE RAMDARA is a Residential / Group Housing project by KATE RAMDARA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100049127 on 1 Feb 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 19 of the 41 units on this registration are recorded sold or booked, and 9 of 9 construction stages are filed complete.
At a glance
Project
- NameKATE RAMDARA
- TypeResidential / Group Housing
- Location
- DAPODI
- -
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411012
- Pincode411012
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049127
- ReraGenie IDRG-MH-50501
Builder
- NameKATE RAMDARA DEVELOPERS
- Entity typePartnership
- PartnersPRANAV PRAMOD DHUMKE, VIRAJ PRAMOD DHUMKE, SATYAWAN BHALCHANDRA KATE, RAHUL SURESH PHUGE, RANJIT DILIPRAO BANKAR
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Feb 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed104 files
Current status
Figures as on 22 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KATE RAMDARA | NA | 7 | 7 | 35 | 6 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 9 construction stages are filed complete.
KATE RAMDARA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BALASAHEB DHONDIBA NAVASKAR AND OTHERS | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| KATE RAMDARA | NA | Rs 8.03 cr | Rs 8.03 cr |
| - | NA | Rs 83.00 lakh | Rs 83.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANIK BUCHADE |
| Engineer | R D BANKAR AND CO R |
| Engineer | Ganesh Ishwar Ghogre |
| Chartered Accountant | B D S P AND ASSOCIATES |
| Chartered Accountant | Deepak Patil |
| Chartered Accountant | Ashok Uttam Mojad |
| Partner | Role in project |
|---|---|
| KATE RAMDARA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Certificate Sept- 25.pdf | 22 May 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 22 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 22 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 22 May 2026 |
| Withdrawal Update Form 3File: FORM 3 Final.pdf | 22 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 22 May 2026 |
| Form 1File: Form 1- 31-12-2024.pdf | 23 Dec 2025 |
| Form 2File: Form 2- 31-12-2024.pdf | 23 Dec 2025 |
| Form 3File: form 3- 3-12-2024.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - 31-12-2024.pdf | 23 Dec 2025 |
| Form 1File: Form 1 30-06-2024.pdf | 23 Dec 2025 |
| Form 2File: Form 2 - 30-06-2024.pdf | 23 Dec 2025 |
| Form 3File: Form 3 31-06-24.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-06-2024.pdf | 23 Dec 2025 |
| Form 1File: Architect Form 1 -15-10-2024.pdf | 23 Dec 2025 |
| Form 2File: Engineer Certificate Form 2 - 30-09- 2024.pdf | 23 Dec 2025 |
| Form 3File: Form 3 30-09-2024.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-09-2024.pdf | 23 Dec 2025 |
| Form 1File: Form 1 30-09-2023.pdf | 23 Dec 2025 |
| Form 2File: FORM 2- 30-09-2023.pdf | 23 Dec 2025 |
| Form 3File: Form 3 30-10-2023.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 30-09-2023.pdf | 23 Dec 2025 |
| Form 1File: Architect Form 1 -31-03-2025.pdf | 23 Dec 2025 |
| Form 2File: Eng Certi FORM-2 31-03-2025.pdf | 23 Dec 2025 |
| Form 3File: Form 3 31-03-25.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD MARCH 2025.pdf | 23 Dec 2025 |
| Form 1File: FORM 1- 30-12-2023.pdf | 23 Dec 2025 |
| Form 2File: FORM-2 30-12-2023.pdf | 23 Dec 2025 |
| Form 3File: Form 3 30-12-2023.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-12-2023.pdf | 23 Dec 2025 |
| Form 1File: Architect Form 1 31-03-2024.pdf | 23 Dec 2025 |
| Form 2File: Form 2 - 30-03-2024.pdf | 23 Dec 2025 |
| Form 3File: Form 3- 31-03-2024.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-03-2024.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate-June 25.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate JUNE 2025.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 June 2025.pdf | 6 Nov 2025 |
| Form 2A (FY 2023-2024)File: Form 2A QA -23-24.pdf | 31 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A QA -24-25 (1).pdf | 31 Jul 2025 |
| Architect Form 1 03-07-2023 | 29 Apr 2025 |
| Architect Form 1 -18-09-2023 | 29 Apr 2025 |
| Architect Form 1 31-03-2024 done | 29 Apr 2025 |
| Architect Form 1 -15-10-2024 uploaded | 29 Apr 2025 |
| Architect Form 1 -31-12-2024 | 29 Apr 2025 |
| Architect Form 1 -31-03-2025 | 29 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Inventory Sold Unsold (1).pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Sold Unsold (1).pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec-24.pdf | 24 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - QTY -Dec-24.pdf | 24 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 ssep done.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cer June 24.pdf | 21 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory June 24.pdf | 21 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form A1 Architect Certificate.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory (1).pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf | 20 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cer form 2.pdf | 19 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 19 Feb 2024 |
| Copy of the legal title reportFile: Search.pdf | 13 Dec 2023 |
| Layout approvalFile: 1-3 (1)_compressed.pdf | 7 Dec 2023 |
| Building plan approvalFile: 2-3 (2) (1)_compressed.pdf | 7 Dec 2023 |
| Building plan approvalFile: 3-3 (1).pdf | 7 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 1-3 (1)_compressed.pdf | 7 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-3 (2) (1)_compressed.pdf | 7 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-3 (1).pdf | 7 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement 19 10 2023 (1).pdf | 7 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT FORM 2 30 09 2023.pdf | 25 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sept 2023.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Sept 2023.pdf | 14 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 - Sept 2023.pdf | 9 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventory for Aug 2023 Upadate.pdf | 18 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A qlty Asuurance Ramdara 2022-23.pdf | 10 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER CERTIFICATE kate Ramdara 30-06-2023.pdf | 8 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fomr 3 CA Certificate Kate Ramdara 30-06-2023.pdf | 8 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1 Architect Certificate Rera Update 30-06-2023.pdf | 6 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 6 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 26-04-2023 March 23.pdf | 2 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect A1.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Ramdara Sold Unsold Quarterly Updation RERA.pdf | 19 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Pranav Dhumke.pdf | 19 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KATE RAMDARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -13,700+ in Pune
Filed coordinates, straight-line distance. 227 registered projects within 2 km.
GREEN PARK
SANTOSH MHADEO ATOLE
AVALON CITY - C5 and C6
Classic Promoters and Builders Private Lim
MAYUR SKYLIFE
BUNTY HOMES
Avalon City - C2
Classic Promoters and Builders Private Lim
HORIZON HARMONY
RAMGEET DEVELOPERS
SAI TOWER
OM SAI CONSTRUCTIONS
Builder: KATE RAMDARA DEVELOPERS
KATE RAMDARA DEVELOPERS has 1 registration on MahaRERA, including KATE RAMDARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that KATE RAMDARA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KATE RAMDARA is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KATE RAMDARA?
The registered promoter entity is KATE RAMDARA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KATE RAMDARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KATE RAMDARA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KATE RAMDARA?
The professionals named in the filing: Architect: MANIK BUCHADE; Engineer: R D BANKAR AND CO R; Engineer: Ganesh Ishwar Ghogre; Chartered Accountant: B D S P AND ASSOCIATES; Chartered Accountant: Deepak Patil; Chartered Accountant: Ashok Uttam Mojad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KATE RAMDARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback