Completed No litigation declared Residential / Group Housing project

AURIS SERENITY TOWER 1

By TRANSCON-SHETH CREATORS PRIVATE LIMITED

RG-MH-12142 · RERA P51800001080 · Last updated on MahaRERA portal: 12 Jan 2023

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
4Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

AURIS SERENITY TOWER 1 is a Residential / Group Housing project by TRANSCON-SHETH CREATORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001080 on 26 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 4 complaints are on record with the regulator.

At a glance

Project

  • NameAURIS SERENITY TOWER 1
  • TypeResidential / Group Housing
  • Location
    • LINK ROAD
    • MALAD WEST
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001080
  • ReraGenie IDRG-MH-12142

Builder

  • NameTRANSCON-SHETH CREATORS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AAACT0197J1Z6
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsJitendra Natwarlal Sheth, Kirti Kediya
  • Other registrations7 more →
  • Completed2 of 8
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jul 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1NA690000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

TOWER 1: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities24

As on 12 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes60%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Swimming PoolYes0%
Senior Citizen CornerYes0%
Pool DeckYes0%
Podium RCC Structure for Tower 1Yes90%
Outdoor PavillionYes0%
Childrens Play AreaYes0%
Grill BarYes0%
Club House with Gymnasium Steam and SaunaYes50%
Counter for Refreshment BarYes0%

Parking filed562

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots562
Closed/Covered562

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area922 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
METROPOLITAN LIFESPACE REAL EST DEVELOPERS PVT LTDMumbai CityMumbai City

Approvals and building plan

Permissible FSI39681.29
Proposed, not sanctioned39,681 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2nd Floor The Arcade World Trade Centre Cuffe Parade Mumbai 400005

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArun Gurav
PartnerRole in project
TRANSCON-SHETH CREATORS PRIVATE LIMITED-

Litigation declared30

CaseCourtStatus
8640/1990CITY CIVILPENDING
1181/1996HIGH COURTPENDING
3849/2004CITY CIVILPENDING
353/2005CITY CIVILPENDING
545/2007CITY CIVILSTAYED
1908/2008CITY CIVILDISPOSED
8035/2009HIGH COURTPENDING
237/2010HIGH COURTPENDING
2847/2011HIGH COURTPENDING
15/2011SLUM TRIBUNAL MUMBAIPENDING
2484/2012CITY CIVILPENDING
5074/2013HIGH COURTPENDING
4/2012SLUM TRIBUNAL MUMBAIDISPOSED
261/2013HIGH POWER COMMITEEPENDING
193/2014HIGH COURTPENDING
846/2013CITY CIVILPENDING
141/2014SMALL CAUSES COURTDISPOSED
123/2014SMALL CAUSES COURTPENDING
124/2014SMALL CAUSES COURTPENDING
125/2014SMALL CAUSES COURTPENDING
126/2014SMALL CAUSES COURTPENDING
154/2014SMALL CAUSES COURTDISPOSED
466/2014SMALL CAUSES COURTPENDING
2239/2014CITY CIVILPENDING
2240/2014CITY CIVILPENDING
332/681/2014SMALL CAUSES COURTPENDING
192/2014HIGH COURTDISPOSED
211/2015HIGH COURTDISPOSED
2735/2014CITY CIVILPENDING
748/2015CITY CIVILPENDING

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000000805Mr Shailesh DudaniM/s. Transcon Properties Private Ltd.26/09/2017
CC006000000000806Ajay MulchandaniM/s Transcon Properties Pvt Ltd26/09/2017
CC006000000110621Himanshu SharmaTranscon - Sheth Creators Pvt Ltd23/08/2019
CC006000000192477KEITH BORTHWICK and PRIYA BORTHWICKTRANSCON SHETH CREATORS PRIVATE LIMITED17/02/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Nov 2022

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Auris Serenity Tower-01.pdf12 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Auris Serenity Tower-1.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Auris Serenity Tower-01.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Auris Serenity Tower-1.pdf12 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Orlem_Sale_1_Wing_D_Plinth_CC_Issue_10-Jun-2022.pdf6 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sale - 1 Wing A OC letter Auris Serenity 8 Novemebr 2019.pdf15 Nov 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Tower 1.pdf15 Nov 2022
Certificates of CA (Form 3)File: RERA - Tower-01 Auris Serenity Form 3 Nov 19.pdf3 Dec 2019
OtherFile: Auris RERA Additional disposed list of Matters - 2.pdf23 Sep 2019
OtherFile: Auris List of Disposed Matters - Litigation for RERA Aug 19.pdf11 Sep 2019
Certificates of CA (Form 5)File: Tower-01.pdf11 Oct 2018
Building plan approvalFile: IOD dated 01-06-2017 T1-T2.pdf21 Jul 2017
Layout approvalFile: layout compressed.pdf21 Jul 2017
PAN CardFile: TRANSCON SHETH CREATORS PAN.pdf21 Jul 2017
Copy of the legal title reportFile: Title Certificate-Auris Serenity-COMPRESSED.pdf21 Jul 2017
Details of encumbrancesFile: Index-II-1000 cr.pdf21 Jul 2017
Details of encumbrancesFile: Index-II-240 CR Tower-1.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: layout compressed.pdf21 Jul 2017
Building Plan Approval (IOD)File: IOD dated 01-06-2017 T1-T2.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 1-6-2017 UP TO 58 TH FLR A-BLetter cc-COMPRESSED.pdf21 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration-Tower-I C.pdf21 Jul 2017
Declaration in FORM BFile: Orlem Conveyance -I C.pdf21 Jul 2017
Declaration in FORM BFile: Orlem Conveyance -II C.pdf21 Jul 2017
Declaration in FORM BFile: Resolution dated 04-07-2017.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 1c.pdf21 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg cert t1.pdf21 Jul 2017
Certificates of CA (Form 3)File: Auris Serenity Tower - 1 compressed.pdf21 Jul 2017
Proforma of Allotment letterFile: Auris Serenity T1 C.pdf21 Jul 2017
OtherFile: FOR SIDHHART SIR 21072017.pdf21 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AURIS SERENITY TOWER 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

2 kmAURIS SERENITY TOWER 1Completed 153Lapsed / revoked 94Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 401 registered projects within 2 km.

Builder: TRANSCON-SHETH CREATORS PRIVATE LIMITED

TRANSCON-SHETH CREATORS PRIVATE LIMITED has 8 registrations on MahaRERA, including AURIS SERENITY TOWER 1 and AURIS SERENITY TOWER 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AURIS SERENITY TOWER 1 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AURIS SERENITY TOWER 1?

The registered promoter entity is TRANSCON-SHETH CREATORS PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAACT0197J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AURIS SERENITY TOWER 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AURIS SERENITY TOWER 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AURIS SERENITY TOWER 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AURIS SERENITY TOWER 1?

The professionals named in the filing: Architect: Arun Gurav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AURIS SERENITY TOWER 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AURIS SERENITY TOWER 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AURIS SERENITY TOWER 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.