AURAPARK
By AURA SAI NIRMIT DEVELOPERS LLP
RG-MH-05463 · RERA P51900055422 · Last updated on MahaRERA portal: 19 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AURAPARK is a Residential / Group Housing project by AURA SAI NIRMIT DEVELOPERS LLP in dadar west, 400028, registered with MahaRERA as P51900055422 on 22 Mar 2024. Possession is promised by 31 Dec 2027. 11 of the 64 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAURAPARK
- TypeResidential / Group Housing
- Location
- Shivaji Park Road No 3
- dadar west
- 400028
- Pincode400028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900055422
- ReraGenie IDRG-MH-05463
Builder
- NameAURA SAI NIRMIT DEVELOPERS LLP
- Entity typePartnership
- PartnersSunil Dattaram Kadam, Nilesh Chandrakant Jani, Amarendra Sudhakar Phatak, Vaishali Vikas Date, Ravi Namdeo Koyale, Bipin Pandurang Pasalkar
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Mar 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed97 files
Current status
Figures as on 19 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AURA PARK | NA | 22 | 20 | 59 | 5 | 64 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
AURA PARK: 43% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| AURA SAI NIRMIT DEVELOPERS LLP | Mumbai City | Mumbai City |
| SUNITA SIDAPPA NAIK | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AURA PARK | NA | Rs 34.67 cr | Rs 18.26 cr |
| - | NA | Rs 1.82 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shreeya Services |
| Engineer | Bhavesh R Parmar |
| Engineer | S K Consultants & Engineers |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Chartered Accountant | Pranav Bhaskaran & Associates |
| Chartered Accountant | N B Sayed & Associates |
| Chartered Accountant | Ms Pratiksha Tulshyan & Associates |
| Partner | Role in project |
|---|---|
| AURA SAI NIRMIT DEVELOPERS LLP | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600090 | Bhakti Achrekar | AURA SAI NIRMIT DEVELOPERS LLP | 23/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2023-2024)File: Form 5- FY 2023-24 Signed.pdf | 19 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Certificate.pdf | 17 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - Aura Park as on June 2026.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - Aura Park as on June 2026.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - Aura Park as on June 2026.pdf | 21 Jul 2026 |
| Form 5 (FY 2024-2025)File: Form 5 of Aura Park FY 24-25sd.pdf | 6 Jun 2026 |
| Form 1File: Form 1 - Aura Park as on Dec 2025.pdf | 20 Apr 2026 |
| Form 2File: Form 2 Aura Park as on 31st Dec 2025.pdf | 20 Apr 2026 |
| Form 3File: Form 3 - Aura Park as on Dec 2025.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Aura Park as on Dec 2025.pdf | 20 Apr 2026 |
| Form 1File: FORM 1 - Aura Park.pdf | 20 Apr 2026 |
| Form 2File: Form 2 of Aura Park as on 31-03-2026.pdf | 20 Apr 2026 |
| Form 3File: Form 3 of Aura Park as on 31-03-2026.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Aura Park as on March 2026.pdf | 20 Apr 2026 |
| Form 1File: Form 1 - Aura Park as on Sep 2025.pdf | 19 Oct 2025 |
| Form 2File: Form 2 - Aura Park as on Sep 2025.pdf | 19 Oct 2025 |
| Form 3File: Form 3 - Aura Park as on Sep 2025.pdf | 19 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Aura Park as on Sep 2025.pdf | 19 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A - Aura Park for FY 2024-25.pdf | 17 Sep 2025 |
| Form 1File: Form 1 - Aura Park as on June 2025.pdf | 20 Jul 2025 |
| Form 2File: Form 2 - Aura Park as on June 2025.pdf | 20 Jul 2025 |
| Form 3File: Form 3 of Aura Park as on 30-06-2025.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Aura Park as on June 2025.pdf | 20 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aura Park as on March 2025.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aura Park as on March 2025.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aura Park as on March 2025.pdf | 18 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Aura Park.pdf | 19 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - FY 2023 - 24.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aura Park as on December 2024.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Aura Park as on 31-12-2024 final_compressed.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aura Park as on 31-12-2024.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Dec 2024.pdf | 16 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf | 16 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter - AURA PARK.pdf | 9 Dec 2024 |
| Proforma of Allotment letterFile: AL - AURA PARK.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 9 Dec 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter - AURA PARK.pdf | 9 Dec 2024 |
| Proforma of Agreement for saleFile: AFS - AURA PARK.pdf | 9 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf | 21 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf | 21 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf | 21 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aura Park as on 30th June 2024.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Aura Park as on 30th September 2024.pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aura Park- as on 30th Sept 2024.pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aura Park- as on 30th June 2024 .pdf | 29 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Aura Park for 22-03-2024 to 31-03-2024.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Aura Park as on 30th September 2024.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aura Park- as on 30th Sept 2024.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aurapark upto Sept 24.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 2 AS 250724.pdf | 29 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng cert no 2 AS 240724.pdf | 27 Jul 2024 |
| Declaration about Commencement CertificateFile: Form D recvised on 19032024.pdf | 19 Mar 2024 |
| Proforma of Agreement for saleFile: Revised_Sale Agreement Aura Park 150324.pdf | 15 Mar 2024 |
| Other - TechnicalFile: MCGM letter for address corretion.pdf | 11 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 1 AS 070324.pdf | 7 Mar 2024 |
| Other - FinanceFile: Declaration with Annexure for Tenants Add Area purchased 070324.pdf | 7 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Seperate Bank Accoaunt Revised 010324.pdf | 5 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 1 AS 220224.pdf | 22 Feb 2024 |
| Layout approvalFile: Annexure A Declaration cum Undertaking for layout revised 170224.pdf | 17 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Annexure A Declaration cum Undertaking for layout revised 170224.pdf | 17 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng cert no 1 AS 170224 revised.pdf | 17 Feb 2024 |
| Copy of the legal title reportFile: Title Certofocate RERA Format as 070224.pdf | 9 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth CC AS 080224.pdf | 9 Feb 2024 |
| Declaration in FORM BFile: Declaration in FORM B on Stamp Paper Aura Sai.pdf | 9 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory Aura Sai.pdf | 9 Feb 2024 |
| Proforma of Allotment letterFile: Allotment Letter 060224.pdf | 6 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter 060224.pdf | 6 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to Model Sale Agreement 060224.pdf | 6 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Finance Aura Park.pdf | 2 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Finance Aura Park.pdf | 2 Feb 2024 |
| Building plan approvalFile: IOD Amended 29122023.pdf | 12 Jan 2024 |
| Building plan approvalFile: 1.pdf | 12 Jan 2024 |
| Building plan approvalFile: 2.pdf | 12 Jan 2024 |
| Building plan approvalFile: 3.pdf | 12 Jan 2024 |
| Building plan approvalFile: 4.pdf | 12 Jan 2024 |
| Building plan approvalFile: 5.pdf | 12 Jan 2024 |
| Building plan approvalFile: 6.pdf | 12 Jan 2024 |
| Building plan approvalFile: 7.pdf | 12 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AURAPARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near dadar west
Filed coordinates, straight-line distance. 126 registered projects within 2 km.
Kohinoor Square Phase 1
Kohinoor CTNL Infrastructure Company Priva
Sigma Garnet
COLO COLOR PRIVATE LIMITED
PALETTE
SURAJ ESTATE DEVELOPERS LTD
Eon One
Firstlight Properties Private Limited
Ratan Address
Shri Nakoda Enterprises
Promesa West End
M/s. virtue Enterprises
Builder: AURA SAI NIRMIT DEVELOPERS LLP
AURA SAI NIRMIT DEVELOPERS LLP has 1 registration on MahaRERA, including AURAPARK. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if AURAPARK is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AURAPARK?
The registered promoter entity is AURA SAI NIRMIT DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AURAPARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AURAPARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AURAPARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AURAPARK?
The professionals named in the filing: Architect: Shreeya Services; Engineer: Bhavesh R Parmar; Engineer: S K Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Pranav Bhaskaran & Associates; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AURAPARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback