Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 24 months from the original
1 of 11Construction stages donefurthest along: Excavation, 95%
50 of 111Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

AURA BLUE is a Residential / Group Housing project by FORTUNE REALTY GROUP in Pune, Maharashtra, registered with MahaRERA as P52100032711 on 24 Jan 2022. Possession is promised by 31 Oct 2026. The completion date has moved by 24 months from the original filing. 61 of the 111 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameAURA BLUE
  • TypeResidential / Group Housing
  • Location
    • PUNAWALE
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032711
  • ReraGenie IDRG-MH-23129

Builder

  • NameFORTUNE REALTY GROUP
  • Entity typePartnership
  • PartnersSRIKANT BHAUSAHEB JADHAV, PRATIBHA HARISHCHANDRA BHUJBHAL
  • Designated PartnerPRASHANT BALKRISHNA SHEVKAR

Key dates

this monthRegisteredJan 2022First promiseOct 2024Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2022
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Oct 2024)
  • Buildings1 building record
  • Documents filed139 files

Current status

55%61 of 111 units booked
94.8%Work done, per cost certificate

Figures as on 24 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AURA BLUENA13121038111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.

AURA BLUE: 70% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)80%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 24 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed226

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots226
Closed/Covered58
Open Space168

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,720 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Oct 2025
LandownerVillageDistrict
MR GAJANAN SHANKAR PUNDALEPethPune
MR MAHADEO BABAN BORGEMulshi Kh.Pune
MR RAJENDRA MAHADEO BORGEPunawalePune
MR ANIL MAHADEO BORGEPunawalePune
MR SUNIL MAHADEO BORGEPunawalePune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation (PCMC)
Permissible FSI5264.02
Proposed, not sanctioned5,264 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAVET PUNE
Estimated costRs 18.62 cr
Cost incurredRs 17.66 cr
Work done94.83%
BuildingWingEstimatedIncurred
AURA BLUENARs 17.07 crRs 16.75 cr
-NARs 1.55 crRs 90.50 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHANKAR NIMBALKAR
EngineerMR SUNIL SHIVGAN
EngineerAkshay Babar
Chartered AccountantRAJ KISHOR AND ASSOCIATES
Chartered AccountantVAISHALI R GOLE
PartnerRole in project
FORTUNE REALTY GROUP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024154Oct 2024 → Oct 2025

Reason as filed by the promoterWe are buying TDR dated 22/09/2022 later we applied for FSI to authority Department of PCMC dated 21/03/2023. The authority Department of PCMC have sanction FSI dated 16/02/2024 and we have applied for revise plan and got approval for the same in the dated 6th march 2024. Therefore, there is time difference for getting the relevant approval.

EA29102518198Oct 2024 → Oct 2026

Reason as filed by the promoterDue to time delay getting the relevant approval of FSI/TDR, highway rain & labour strength there is able to complete the project on committed dated as mentioned in RERA i.e. 31/10/2025. Therefore, we want to extend project completion date to 31/10/2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form No 1 Architech Certificate.pdf24 Dec 2025
Withdrawal Update Form 2File: Form No 2Engineer Certificate.pdf24 Dec 2025
Withdrawal Update Form 3File: Form No 3 CA Certificate.pdf24 Dec 2025
Layout approvalFile: Layout Plan 10062025_compressed.pdf20 Dec 2025
Layout approvalFile: PLAN 1.pdf30 Oct 2025
Building plan approvalFile: PLAN 2.pdf30 Oct 2025
Building plan approvalFile: PLAN 3.pdf30 Oct 2025
Building plan approvalFile: PLAN 4.pdf30 Oct 2025
Building plan approvalFile: PLAN 5.pdf30 Oct 2025
Building plan approvalFile: PLAN 6.pdf30 Oct 2025
Layout approvalFile: LAYOUT PLAN.pdf29 Oct 2025
Building plan approvalFile: 1ST TO 11TH FLOOR PLAN.pdf29 Oct 2025
Commencement certificateFile: CC.pdf29 Oct 2025
Building plan approvalFile: ELEVATION.pdf29 Oct 2025
Building plan approvalFile: 7TH u0026 10TH FLOOR PLAN.pdf29 Oct 2025
Building plan approvalFile: BASEMENT PARKING PLAN.pdf29 Oct 2025
Building plan approvalFile: 12TH FLOOR PLAN.pdf29 Oct 2025
Withdrawal Update Form 1File: Architech Certificate - Fortune Realty Group Jun 25.pdf29 Oct 2025
Withdrawal Update Form 1File: FROM-1.pdf29 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate - Fortune Realty Group Jun 25.pdf29 Oct 2025
Withdrawal Update Form 2File: FROM-2.pdf29 Oct 2025
Withdrawal Update Form 3File: CA Certificate - Fortune Realty Group Jun 25.pdf29 Oct 2025
Withdrawal Update Form 3File: FROM-3.pdf29 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Fortune Realty Group Q4_compressed.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Fortune Realty Group Q4_compressed.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Fortune Realty Group Q4.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Fortune Realty Group Q3 FY 24-25.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Fortune Realty Group Q3 FY 24-25_compressed.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Fortune Realty Group Q3 FY 24-25.pdf19 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate - Fortune Realty Group Q-2.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Fortune Realty Group Q-2_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Fortune Realty Group Q-2.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Fortune Realty Group.pdf4 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-02 Engineer certifiate.pdf4 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Fortune Realty Group_compressed.pdf4 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_compressed.pdf4 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Form A - Fortune Realty Group.pdf4 Aug 2024
Details of encumbrancesFile: Encumbrance.pdf27 Jul 2024
Declaration in FORM BFile: FORM B.pdf27 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From No 2A_merged.pdf27 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf27 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM NO 5 2022-23.pdf27 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM NO 5 2023-24.pdf27 Jul 2024
Other - FinanceFile: Encumbrance_page-0001.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFIACTE_compressed.pdf1 May 2024
Layout approvalFile: LP.PDF14 Mar 2024
Building plan approvalFile: P1.PDF14 Mar 2024
Building plan approvalFile: P2.PDF14 Mar 2024
Building plan approvalFile: P3.PDF14 Mar 2024
Building plan approvalFile: P4.PDF14 Mar 2024
Building plan approvalFile: P5.PDF14 Mar 2024
Copy of Layout Approval (in case of layout)File: LP.PDF14 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: P1.PDF14 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: P2.PDF14 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: P3.PDF14 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: P4.PDF14 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: P5.PDF14 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 14032024.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fortune Architect Certificate Q-3_compressed.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Fortune Q3_compressed.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Fortune Q3_compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fortune Architech Q1.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fortune Architech Q2.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fortune Engineer Certificate Q1.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fortune Engineer Certificate Q2.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE-04-12-23_compressed.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE-06-12-23_compressed.pdf7 Dec 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LIST.pdf12 May 2023
Layout approvalFile: PLAN 1_compressed.pdf11 Apr 2023
Layout approvalFile: PLAN 2_compressed.pdf11 Apr 2023
Layout approvalFile: PLAN 3_compressed.pdf11 Apr 2023
Building plan approvalFile: PLAN 4_compressed.pdf11 Apr 2023
Building plan approvalFile: PLAN 5_compressed.pdf11 Apr 2023
Building plan approvalFile: PLAN 6_compressed.pdf11 Apr 2023
Building plan approvalFile: PLAN 7_compressed.pdf11 Apr 2023
Copy of Layout Approval (in case of layout)File: PLAN 1_compressed.pdf11 Apr 2023
Copy of Layout Approval (in case of layout)File: PLAN 2_compressed.pdf11 Apr 2023
Copy of Layout Approval (in case of layout)File: PLAN 3_compressed.pdf11 Apr 2023

How this compares with Pune

55%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AURA BLUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNAWALE13,700+ in Pune

2 kmAURA BLUECompleted 96Lapsed / revoked 33Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 242 registered projects within 2 km.

Builder: FORTUNE REALTY GROUP

FORTUNE REALTY GROUP has 1 registration on MahaRERA, including AURA BLUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AURA BLUE is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AURA BLUE?

The registered promoter entity is FORTUNE REALTY GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AURA BLUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AURA BLUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AURA BLUE?

The professionals named in the filing: Architect: SHANKAR NIMBALKAR; Engineer: MR SUNIL SHIVGAN; Engineer: Akshay Babar; Chartered Accountant: RAJ KISHOR AND ASSOCIATES; Chartered Accountant: VAISHALI R GOLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AURA BLUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AURA BLUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AURA BLUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.