Home / Browse projects / Pune, Maharashtra / AUMSANIKA PARAS RESIDENCY

Completed No litigation declared Residential / Group Housing project

AUMSANIKA PARAS RESIDENCY

By AUMSANIKA DEVELOPERS LLP

RG-MH-05182 · RERA P52100056040 · Last updated on MahaRERA portal: 27 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 95%
8 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

AUMSANIKA PARAS RESIDENCY is a Residential / Group Housing project by AUMSANIKA DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100056040 on 10 May 2024. The registration is recorded completed; possession was promised by 30 Mar 2026. 6 of the 14 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameAUMSANIKA PARAS RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • KOTHRUD
    • PUNE
    • Haveli
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056040
  • ReraGenie IDRG-MH-05182

Builder

  • NameAUMSANIKA DEVELOPERS LLP
  • Entity typePartnership
  • PartnersAJIT ZUMBARLAL KARNAVAT, NEETIN VILAS GAVALI
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMay 2024PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2024
  • Promised completion30 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

43%6 of 14 units booked
100.0%Work done, per cost certificate

Figures as on 27 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AUMSANIKA PARAS RESIDENCYNA7714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

AUMSANIKA PARAS RESIDENCY: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 27 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area503 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Mar 2026
LandownerVillageDistrict
PARAS APARTMENTS CONDOMINIUMKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3088.77
Proposed, not sanctioned1,975 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndusind Bank, Ground Floor Loft, Showroom No 7, Kul Scapes, Tukaram Nagar, Kharadi, Pune - 411014
Estimated costRs 6.95 cr
Cost incurredRs 6.95 cr
Work done100.0%
BuildingWingEstimatedIncurred
AUMSANIKA PARAS RESIDENCYNARs 6.00 crRs 6.00 cr
-NARs 95.40 lakhRs 95.40 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH KULKARNI ANKUR ASSOCIATES
EngineerKALPESH ZABAK
EngineerRutuja Jagdale
Chartered AccountantRUCHI M GANDHI & ASSOCIATES
Chartered AccountantANJK & CO LLP
PartnerRole in project
AUMSANIKA DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: HPSC1085_compressed.pdf27 Feb 2026
Occupational CertificateFile: HPSC1086_compressed.pdf27 Feb 2026
Occupational CertificateFile: A2Scan_29102025162230.pdf27 Feb 2026
Occupational CertificateFile: OC-Paras.pdf8 Dec 2025
Withdrawal Update Form 1File: Form 1 - Paras Residency.pdf16 Oct 2025
Withdrawal Update Form 2File: Paras - Form 2_Engineer Certificate.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate_.pdf16 Oct 2025
Withdrawal Update Form 1File: Form 1 - Paras Residency.pdf14 Oct 2025
Withdrawal Update Form 2File: Paras - Form 2_Engineer Certificate.pdf14 Oct 2025
Withdrawal Update Form 3File: Paras - Form 3_CA Certificate.pdf14 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Paras Residency.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paras - Form 3_CA Certificate_compressed.pdf23 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Paras - Form 2_Engineer Certificate.pdf23 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2025.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate_Paras Residency_compressed.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Paras Residency_compressed.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aumsanika paras residency (1).pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2025.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_ Quality Assurance_Paras Residency_compressed.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format - December 2024_Paras_compressed.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aumsanika Paras Residency.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - December 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcitect Certificate.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format - Sept 2024_compressed.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aumsanika Paras.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf25 Oct 2024
Layout approvalFile: HPSC1285_compressed.pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: HPSC1285_compressed.pdf8 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Ankur Associates20240805190139.pdf8 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Aumsanika.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate R2 - FORM 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- AUmsanika.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - New Format.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format.pdf15 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Format A on Separate Bank Account.pdf15 Jul 2024
Other - TechnicalFile: 3 Other - Legal.pdf4 May 2024
Other - TechnicalFile: eMAIL.pdf4 May 2024
Other - TechnicalFile: eMAIL.pdf4 May 2024
Copy of the legal title reportFile: RERA_TS_Report compressed.pdf19 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC MAil.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revise Form 3- Aumsanika.pdf19 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow19 Apr 2024
Other - LegalFile: Declaration Cum Undertaking.pdf19 Apr 2024
Other - LegalFile: Paras Apartment_Sanction Plan_11zon.pdf19 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised Paras Apartment_Commencement Certificate.pdf17 Apr 2024
Other - LegalFile: Lease Deed.pdf17 Apr 2024
Layout approvalFile: Layout_compressed.pdf13 Mar 2024
Building plan approvalFile: Layout_compressed.pdf13 Mar 2024
PAN CardFile: PAN AUMSANIKA.pdf13 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf13 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Legal.pdf13 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance.pdf13 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf13 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout_compressed.pdf13 Mar 2024
Declaration about Commencement CertificateFile: Declearation About Commencemnt Certificate.pdf13 Mar 2024
Declaration in FORM BFile: FORM B Aumsanika Developers LLP.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate (1).pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf13 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked Inventory.pdf13 Mar 2024
CERSAI detailsFile: Declaration regarding CERSAI.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Ajit Karnavat.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Neetin Vilas Gavali.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A AUM SANIKA.pdf13 Mar 2024
Proforma of Agreement for saleFile: Agreement to Sale.pdf13 Mar 2024
Proforma of Allotment letterFile: Allotment Letter.pdf13 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation report with respect to allottment letter - Copy.pdf13 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report with respect to agreement to sale.pdf13 Mar 2024
Other - LegalFile: Aumsanika_LLP agreement.pdf13 Mar 2024

How this compares with Pune

43%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AUMSANIKA PARAS RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmAUMSANIKA PARAS RESIDENCCompleted 96Lapsed / revoked 50Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 301 registered projects within 2 km.

Builder: AUMSANIKA DEVELOPERS LLP

AUMSANIKA DEVELOPERS LLP has 2 registrations on MahaRERA, including AUMSANIKA PARAS RESIDENCY and Aumsanika Abhijatshree. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AUMSANIKA PARAS RESIDENCY is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AUMSANIKA PARAS RESIDENCY?

The registered promoter entity is AUMSANIKA DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AUMSANIKA PARAS RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AUMSANIKA PARAS RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AUMSANIKA PARAS RESIDENCY?

The professionals named in the filing: Architect: PRAKASH KULKARNI ANKUR ASSOCIATES; Engineer: KALPESH ZABAK; Engineer: Rutuja Jagdale; Chartered Accountant: RUCHI M GANDHI & ASSOCIATES; Chartered Accountant: ANJK & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AUMSANIKA PARAS RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AUMSANIKA PARAS RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AUMSANIKA PARAS RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.