Registered No litigation declared Residential / Group Housing project

AUDUMBAR BLISS

By ROYAL SRUSHTI DEVELOPERS

RG-MH-84047 · RERA P52100055148 · Last updated on MahaRERA portal: 7 Sep 2026

Source: official MahaRERA filing

Red flags

  • Rs 8.00 crore secured on the land, in favour of Anand Rathi Global Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 95%
14 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

AUDUMBAR BLISS is a Residential / Group Housing project by ROYAL SRUSHTI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100055148 on 4 Mar 2024. Possession is promised by 31 Dec 2026. 42 of the 56 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameAUDUMBAR BLISS
  • TypeResidential / Group Housing
  • Location
    • WALHEKARWADI
    • CHINCHWAD
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055148
  • ReraGenie IDRG-MH-84047

Builder

  • NameROYAL SRUSHTI DEVELOPERS
  • Entity typePartnership
  • PartnersNAVIN AMARASHI SAPARIYA, PRAVIN MALLLINATH NOLLA, VASANT BABURAO KACHI, RUSHABH MAHESH SAPARIYA
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Mar 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

75%42 of 56 units booked
69.0%Work done, per cost certificate

Figures as on 7 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AUDUMBAR BLISSNA9756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

AUDUMBAR BLISS: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 7 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes55%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes35%
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed172

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots172
Closed/Covered56
Open Space116

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,575 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAnand Rathi Global Finance Ltd
Secured amountRs 8.00 crore
CERSAI search filedYes
Declared on19 Oct 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI5040.0
Proposed, not sanctioned5,034 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGokhale Plaza, Chinchwad, Near Ramkrishna More Auditorium Pune 411033
Estimated costRs 20.43 cr
Cost incurredRs 14.10 cr
Work done68.98%
BuildingWingEstimatedIncurred
AUDUMBAR BLISSNARs 19.43 crRs 14.05 cr
-NARs 1.00 crRs 5.00 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIL PAWAR & ASSOCIATES
EngineerSarvasiddhant Structural Engineers Pvt.Ltd.
EngineerMedankar Pravin Sudam
EngineerBabasaheb Isapure
Chartered AccountantG M Achhra and Associates
Chartered AccountantShailesh N Bore & Co
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
ROYAL SRUSHTI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf7 Sep 2026
Form 2A (FY 2024-2025)File: form 2A 2024-25.pdf7 Sep 2026
Form 2A (FY 2025-2026)File: form2A 2025-26.pdf7 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf16 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf16 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf16 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q4 FY 25-26.pdf18 Apr 2026
Withdrawal Update Form 2File: FORM 2 Q4 FY 25-26.pdf18 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q4 FY 25-26.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3 FY 25-26.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3 FY 25-26.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3 FY 25-26.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf29 Nov 2025
Form 1File: Form 1_Final.pdf20 Oct 2025
Form 2File: Form 2 Final.pdf20 Oct 2025
Form 3File: Form 3 Final.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Flat Q-4 Final.pdf20 Oct 2025
Withdrawal Update Form 1File: Form 1 Q1.pdf20 Oct 2025
Withdrawal Update Form 1File: Form 1 Q2.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 Q1.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 Q2_.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 Q1.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2.pdf20 Oct 2025
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Jul 2025
Details of encumbrances concerned to FinanceFile: Disclosure on Secured Loans.pdf30 May 2025
Details of encumbrances concerned to LegalFile: Disclosure on Secured Loans.pdf30 May 2025
Layout approvalFile: Sanction Plan.pdf24 Apr 2025
Building plan approvalFile: Building Plan 2.pdf24 Apr 2025
Building plan approvalFile: Building Plan 3.pdf24 Apr 2025
Building plan approvalFile: Building Plan 4.pdf24 Apr 2025
Copy of Layout Approval (in case of layout)File: Sanction Plan.pdf24 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement 31 03 2025.pdf24 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf24 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf24 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Final.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Flat Q-4 Final.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q-3.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSD Form 3 Dec 2024_signed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q-3.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Q-3.pdf24 Jan 2025
Proforma of Agreement for saleFile: RSDREVAFS20122024.pdf20 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RSD Form 5 23-24 scanned.PDF19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RSD Form 5 23-24 scanned.PDF19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSD Form 3 Sep 2024 signed.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-2 Architect Certficate.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-2 Engineer Certificate.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Q-2 Flats sold unsold list.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RSD Q1 2024 Architect Certificate.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSD Q1 2024 Engineer Certificate.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: RSD Sold Unsold Q1 2024.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSD FORM 3 Q1 24-25.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q1.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLDBOOKED INVENTORY.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSD Form 3 Mar 2024.pdf22 Apr 2024
CERSAI detailsFile: UNDERTAKING OF NO CERSAI.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf8 Feb 2024
Copy of the legal title reportFile: Formate A Legal Title Report_FLowof title_Final_Uploaded.pdf1 Feb 2024
Copy of the legal title reportFile: Search and TitleReport_RSD_Final_Uploaded.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certeficate__ Final.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: Finance_encumbrances_RSD_FinalScan.pdf30 Jan 2024
Details of encumbrances concerned to FinanceFile: Legal Encrumbances Report_Final_Scan.pdf30 Jan 2024
Details of encumbrances concerned to LegalFile: Finance_encumbrances_RSD_FinalScan.pdf30 Jan 2024
Details of encumbrances concerned to LegalFile: Legal Encrumbances Report_Final_Scan.pdf30 Jan 2024
Declaration in FORM BFile: Form B_Declaration_Royal Srushti_ Final.pdf30 Jan 2024
Proforma of Agreement for saleFile: AFS_Agreement For Sale Royal Srushti_Final.pdf30 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration_FormA_Bank account_FinalScan.pdf30 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report in respect of AFS_FinalScan.pdf30 Jan 2024
Other - LegalFile: DeclarationnUndertaking_AnnxA_Noapp_Reg.pdf30 Jan 2024
Other - LegalFile: Purchase Agreement of plot_walhekarwadi_ Royal Srushti.pdf25 Jan 2024
Other - LegalFile: Partnership Deed_RoyalSrushtiDevelopers.PDF25 Jan 2024
Layout approvalFile: Plan A.pdf20 Jan 2024
Copy of Layout Approval (in case of layout)File: Plan A.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Royal Srushti_Final.pdf20 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ROYAL GALAXYWADMUKHWADI CHARHOLI PUNE94CompletedDec 2023Nov 2022

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AUDUMBAR BLISS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHINCHWAD13,700+ in Pune

2 kmAUDUMBAR BLISSCompleted 54Lapsed / revoked 36Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 141 registered projects within 2 km.

Builder: ROYAL SRUSHTI DEVELOPERS

ROYAL SRUSHTI DEVELOPERS has 1 registration on MahaRERA, including AUDUMBAR BLISS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AUDUMBAR BLISS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AUDUMBAR BLISS?

The registered promoter entity is ROYAL SRUSHTI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AUDUMBAR BLISS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AUDUMBAR BLISS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AUDUMBAR BLISS?

The professionals named in the filing: Architect: ANIL PAWAR & ASSOCIATES; Engineer: Sarvasiddhant Structural Engineers Pvt.Ltd.; Engineer: Medankar Pravin Sudam; Engineer: Babasaheb Isapure; Chartered Accountant: G M Achhra and Associates; Chartered Accountant: Shailesh N Bore & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AUDUMBAR BLISS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AUDUMBAR BLISS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AUDUMBAR BLISS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.