ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ATULYA BUILDING NO. 8

Registration lapsed No litigation declared Residential / Group Housing project

ATULYA BUILDING NO. 8

By CALYX SPACES LLP

RG-MH-02193 · RERA P52100000202 · Last updated on MahaRERA portal: 27 May 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 43 months past the filed date
  • 53 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promised43 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
53Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

ATULYA BUILDING NO. 8 is a Residential / Group Housing project by CALYX SPACES LLP in Pune, Maharashtra, registered with MahaRERA as P52100000202 on 10 Jul 2017. Possession was promised by 30 Mar 2023 and is now 43 months past that date. 53 complaints are on record with the regulator.

At a glance

Project

  • NameATULYA BUILDING NO. 8
  • TypeResidential / Group Housing
  • Location
    • JAMBHUL ROAD
    • JAMBHUL
    • Mawal
    • Pune
    • 410506
  • Pincode410506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000202
  • ReraGenie IDRG-MH-02193

Builder

  • NameCALYX SPACES LLP
  • Entity typePartnership
  • PartnersNITIN SHRIKISAN JAJOO, GAURAV SUNIL SOMANI
  • Other registrations5 more →
  • No longer live6 lapsed, de-registered or revoked

Key dates

43 months past promisethis monthRegisteredJul 2017PromisedMar 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Jul 2017
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 8NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

BUILDING NO 8: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes25%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered28
Open Space84

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,343 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ELIET RALTYPune (M Corp.)Pune

Approvals and building plan

Permissible FSI3447.78
Proposed, not sanctioned3,448 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivaji Nagar Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchland Architects Pvt. Ltd.
EngineerPARAG PRAKASH CHOPADA
PartnerRole in project
CALYX SPACES LLP-

Complaints filed with MahaRERA53

Case no.ComplainantRespondentFiled
CC005000000289987UTTAM BHAGWAN BHOSALECalyx Spaces LLP through proprietor Gaurav Sunil Somani30/12/2023
CC005000000290129SAMPAT ANANDA KHALATEM/S CALYX SPACES LLP19/01/2024
CC005000000290132MANGESH SHASHIKANT SURVECALYX SPACES LLP19/01/2024
CC005000000290133PARSHURAM MALLAPPA CHALWADICALYX SPACES LLP19/01/2024
CC005000000290135PARASHRAM PANDURANG PATILCALYX SPACES LLP19/01/2024
CC005000000290138TUSHAR DILIP SONAWANECALYX SPACES LLP19/01/2024
CC005000000290142RAVINDRA KRISHNA SABLECALYX SPACES LLP19/01/2024
CC005000000290144NEETA HEMANT SATPUTECALYX SPACES LLP19/01/2024
CC005000000290145HEMANT RAMCHANDRA SHINDECALYX SPACES LLP20/01/2024
CC005000000290172TEJAS SHASHIKANT PARABCALYX SPACES LLP20/01/2024
CC005000000290177ASHWINI MARUTI GAIKWADM/S CALYX SPACES LLP21/01/2024
CC005000000310352JOHARA IQBAL SHAIKHCALYX SPACES LLP09/02/2024
CC005000000290183AJIT SHANKAR DAUNDCALYX SPACES LLP21/01/2024
CC005000000290202PRATIK AMRUT BHINGARECALYX SPACES LLP22/01/2024
CC005000000290209RUPALI SWAROOP BORSECALYX SPACES LLP23/01/2024
CC005000000290218LAV GANPAT BHADAVKARCALYX SPACES LLP29/01/2024
CC005000000290273SANKET LAXMAN BHOSALECALYX SPACES LLP31/01/2024
CC005000000290292RAVINDRA TUKARAM KAMBLECALYX SPACES LLP03/02/2024
CC005000000290295NAMDEV SUKHDEV SABLECALYX SPACES LLP03/02/2024
CC005000000290305ANKITA DEOKANTH FALECALYX SPACES LLP04/02/2024
CC005000000310324VARSHA ANAND BHOSALECALYX SPACES LLP07/02/2024
CC005000000310356DEEPALI MADHUKAR BADEKARCALYX SPACES LLP09/02/2024
CC005000000310368SAYALI SUDHIR SHINDECALYX SPACES LLP10/02/2024
CC005000000310417SACHIN P JOGDANDKARCALYX SPACES LLP16/02/2024
CC005000000310431ARVIND MARUTI PAWARcalyx spaces llp18/02/2024
CC005000000310437GAURI MAHADEV LALSARCALYX SPACES LLP04/04/2024
CC005000000310438MAHADEV RAMSWAMY LALSARCALYX SPACES LLP06/04/2024
CC005000000310445KADUBA SHANKAR WANKHEDECALYX SPACES LLP06/04/2024
CC005000000310472NARESH KUMARCALYX SPACES LLP06/04/2024
CC005000000310546Santosh SwamiM/S Calyx Spaces LLP01/05/2024
CC005000000310563SATISH NAMDEV SALUNKEGOURAV SUNIL SOMANI05/03/2024
CC005000000310596SANDEEP KUMAR JAYASWALM/S CALYX SPACES LLP06/04/2024
CC005000000320600Rashid Badshaha ShaikhM/S CALYX SPACES LLP06/04/2024
CC005000000320602PRATIMA KESHAVAN SWAMYM/S CALYX SPACES LLP07/04/2024
CC005000000320604SUNIL HANUMANT WAGHWALEM/S CALYX SPACES LLP07/04/2024
CC005000000340721MADHURI MORESHWAR PANSARECALYX SPACES LLP05/06/2024
CC12400485Harshita Mayur PalaskarCALYX SPACES LLP20/10/2024
CC12502202BACCHAN KISAN JADHAVCALYX SPACES LLP02/07/2025
CC12603661Atul Achutrao MulayCALYX SPACES LLP13/06/2026
CC12501717Gopal Anant TivrekarCALYX SPACES LLP26/05/2025
CC12502310Rajesh Prabhakar ArdeCALYX SPACES LLP08/07/2025
CC12502268Pradip Bhimrao GaikwadCALYX SPACES LLP06/07/2025
CC12502391Gayatri Dattatray ParabCALYX SPACES LLP14/07/2025
CC12502417Mira Sudhir MankarCALYX SPACES LLP16/07/2025
CC12502566Prashant Rawaji DambaleCALYX SPACES LLP25/07/2025
CC12502573Vatsala Rawji DambaleCALYX SPACES LLP26/07/2025
CC12502576Kailas Bhgawan BodkeCALYX SPACES LLP26/07/2025
CC12502619Sachin Vasant ShindeCALYX SPACES LLP29/07/2025
CC12502621Alka Ramanlal GandhiCALYX SPACES LLP29/07/2025
CC12600900Harshita Mayur PalaskarCALYX SPACES LLP18/02/2026
CC12601253Pramod Gajanan LokhandeCALYX SPACES LLP07/03/2026
CC12601255pramod Gajanan LokhandeCALYX SPACES LLP07/03/2026
CC12603124Satish Namdev SalunkeCALYX SPACES LLP25/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Dec of CC Building No 8 March 2022.pdf27 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Building No 8 March 2022_compressed.pdf27 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Building No 8 March 2018.pdf27 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Building No 8 March 2019.pdf27 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Building No 8 March 2020.pdf27 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Building No 8 March 2021.pdf27 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Atulya building 8 2019-2020.pdf25 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Atulya building 8 2020-2021.pdf25 May 2022
OtherFile: Search Title latest 14 OCT 2019.pdf18 Feb 2020
Details of encumbrancesFile: Sanction Letter - SBI (CSLLP)-min.pdf3 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Building-8 (7-10-19)_compressed.pdf25 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate-Building 8 (5-10-19).pdf25 Nov 2019
Certificates of CA (Form 3)File: Building-8.pdf25 Nov 2019
Layout approvalFile: ATULYA BUILDING 8.pdf21 Jun 2018
Building plan approvalFile: ATULYA BUILDING 8.pdf21 Jun 2018
Copy of Layout Approval (in case of layout)File: ATULYA BUILDING 8.pdf21 Jun 2018
Building Plan Approval (IOD)File: ATULYA BUILDING 8.pdf21 Jun 2018
Layout approvalFile: Plan - Atulya.pdf6 Apr 2018
Building plan approvalFile: Plan - Atulya.pdf6 Apr 2018
Copy of Layout Approval (in case of layout)File: Plan - Atulya.pdf6 Apr 2018
Building Plan Approval (IOD)File: Plan - Atulya.pdf6 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: PMRDA.pdf6 Apr 2018
Certificates of CA (Form 3)File: Bldg 8.pdf6 Jul 2017
Layout approvalFile: layout atulya .pdf5 Jul 2017
Building plan approvalFile: Building plan .pdf5 Jul 2017
Copy of the legal title reportFile: legal title .pdf5 Jul 2017
Details of encumbrancesFile: encumbrance .pdf5 Jul 2017
Copy of Layout Approval (in case of layout)File: layout atulya .pdf5 Jul 2017
Building Plan Approval (IOD)File: Building plan .pdf5 Jul 2017
Declaration in FORM BFile: form B.pdf5 Jul 2017
Proforma of Allotment letterFile: Atulya Agreement .pdf5 Jul 2017
PAN CardFile: pancard atulya .pdf22 Jun 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATULYA BUILDING NO. 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAMBHUL13,700+ in Pune

2 kmATULYA BUILDING NO. 8Completed 12Lapsed / revoked 11Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: CALYX SPACES LLP

CALYX SPACES LLP has 6 registrations on MahaRERA, including ATULYA BUILDING NO. 5 and ATULYA BUILDING NO. 6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that ATULYA BUILDING NO. 8 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ATULYA BUILDING NO. 8 is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATULYA BUILDING NO. 8?

The registered promoter entity is CALYX SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATULYA BUILDING NO. 8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ATULYA BUILDING NO. 8?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ATULYA BUILDING NO. 8?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATULYA BUILDING NO. 8?

The professionals named in the filing: Architect: Archland Architects Pvt. Ltd.; Engineer: PARAG PRAKASH CHOPADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATULYA BUILDING NO. 8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATULYA BUILDING NO. 8. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATULYA BUILDING NO. 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.